RadCalNet/Landnet process for adding new sites

Slides:



Advertisements
Similar presentations
Experimental Internet Resource Allocations Philip Smith, Geoff Huston September 2002.
Advertisements

1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Stephen R Whitesell SC-5 Chair 11/13/2014.
1 The Path to the Ph.D. in IS: Part 3, Advanced coursework and dissertation research.
2009 Performance Assessment Member Representatives Committee Meeting October 28, 2008.
WGClimate John Bates NOAA SIT Workshop Agenda Item #8 WGClimate Work Plan progress & Issues CEOS SIT Technical Workshop CNES, Montpellier, France 17 th.
Why Proposed TC Procedures? Define how TC reaches “completion” of what OASIS calls “Committee Specifications” TC procedures lead up to the OASIS process:
1 Accredited Standards Committee C63 ® - EMC SC5 Report Stephen R Whitesell Chair 11/14/2013.
Recommendations for transfer from TISPAN to 3GPP SP For information Source: Goran Engstrom: TISPAN WG1 chairman Stephen Hayes: 3GPP SA Chairman.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 1: Techniques and Developments Zhong Chen SC1 Chair
September, 2008 TASK DA Data Quality Assurance Strategy GEO Task DA-06-02: “This task is led by CEOS and IEEE” GOAL: “Develop a GEO data quality.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Advisory Committee Voting Protocol Advisory Committee - Voting.
The International Ocean Colour Coordinating Group International Network for Sensor Inter- comparison and Uncertainty assessment for Ocean Color Radiometry.
Incoming Themes for 2017 Frank Kelly, USGS
Future directions of CEOS WGCV: Incoming chair perspective
Grid Code What is the Standard Modification Process? Panel
GOLD GOLD Amendment Program Presented to: SOCM/2 Seminar
GIRO usage and GSICS Lunar Observation Dataset Policy S. Wagner

Action Item Review for WGCV-44
Action Item Review for WGCV-43
CEOS Work Plan Steven Hosford WGCV-43/WGISS-45 10th April 2018
WGCV Work Plan Actions K. . Thome NASA WGCV Plenary # 43
Status of Carbon Action Items
WGCV Overview K. Thome WGISS#45 / WGCV#43
GSICS/WGCV Linkages K. Thome NASA WGCV Plenary # 44
WGCV Report Albrecht von Bargen (DLR) Kurt Thome (NASA)
Site classifications, definitions, and updates to Landnet
Day 2 Summary K. Thome NASA WGCV Plenary # 44
Day 3 Summary K. Thome NASA WGCV Plenary # 43
WGCV-32 Action Item Review
WGISS/WGCV Session summary and WGCV Action Item Status
Action Item Status / CEOS Work Plan Status
WGCV-43 meeting overview, goals, and agenda approval
Fast Track Maintenance Process (for existing messages)
RadCalNet Status Marc Bouvet ESA & RadCalNet task team
Security Guidelines Working Group Update
Carbon Actions for WGCV
Opening May 2005 Interim Session #14
Day 3 Summary K. Thome NASA WGCV Plenary # 44
WGCV-44 meeting overview, goals, and agenda approval
Carbon Actions for WGCV
Cloud mask update K. Thome NASA WGCV Plenary # 42 May 16-19, 2017.
Proposed WGCV CARD4L assessment process
WGCV Chair’s Report K. Thome NASA/GSFC WGCV 42
Communicating Terminology and definitions
WGCV telecons, newsletter and other outreach
Data policy, data usage and dataset update
Committee on Earth Observation Satellites
Closure of WGCV actions (CV-01; CV-09; CV-13; CV-16)
Working Group on Cal/Val Update
WGCV Work Plan Actions K. Thome NASA WGCV Plenary # 44
Day 2 Summary K. Thome NASA WGCV Plenary # 42 May 16-19, 2017.
Technical aspects of the GIRO work: inputs from GRWG
Uncertainties for Analysis Ready Data
Lunar Calibration Workshop Wrap up, next steps and list of actions
IEEE IMT-Advanced Review Process
Day 2 Summary K. Thome NASA WGCV Plenary # 42 May 16-19, 2017.
TRTR Briefing September 2013
IEEE IMT-Advanced Review Process
WGCV-42 meeting overview, goals, and agenda approval
Session #5 Closing Status November , 2003
Policies, Procedures, and Best Practices IEEE AESS PANELS 2019 Prepared by the Technical Operations Committee Contents: Applying for Panel Approval Forming.
CEOS WGCV (IVOS) potential interactions with GSICS
Stephen Briggs European Space Agency SIT Workshop Agenda Item #13
TDC Meeting 22 Version March 2019.
Experimental Internet Resource Allocations
CEOS Working Group on Climate (WGClimate)
Session 2: CEOS Analysis Ready Data for Land (10:50 – 11:00)
WGCV CARD4L Peer Review Medhavy Thankappan WGCV-45 July 15-19, 2019.
DEM related topics K. Thome NASA WGCV Plenary # 45 CSIRO, Perth
Presentation transcript:

RadCalNet/Landnet process for adding new sites K. Thome NASA WGCV Plenary # 42 May 16-19, 2017

RadCalNet is very close to being publicly available Landnet has suffered from lack of oversight for too long Need to finalize steps needed to allow open access to RadCalNet portal Develop a method to allow incorporation of new sites Use the RadCalNet effort as a means to update Landnet Incorporate Landnet maintenance as part of the same group overseeing RadCalNet membership Improve definitions of the purpose of Landnet

Landnet issue raised several years ago by CSIRO The selection of original sites was very ad hoc Many of the sites are no longer active There is a lack of understanding regarding the purpose of the Landnet sites Some of the information should be updated

Landnet description from Cal/Val portal The LANDNET Sites are a set of Land Equipped Sites (LES) endorsed by CEOS as standard reference sites for the post-launch calibration of space-based optical imaging sensors. During the CEOS IVOS-19 Meeting, held in Phoenix AZ, eight instrumented sites have been selected. These instrumented sites are primarily used for field campaigns to obtain radiometric gain and these sites can serve as a focus for international efforts, facilitating traceability and cross-comparison to evaluate biases of in-flight and future sensors in a harmonized manner. USGS-based web site on these sites is more extensive

Goals for Landnet Assume we wish to continue Landnet Or keep concept but change name Do we want to reboot/restart the site? Redefine purpose Repopulate using published literature RadCalNet Admission Panel (coming up) would evaluate Landnet status on a yearly basis Identify sites that are no longer active Yearly email to site administrator receives no response No published results within a three-year period Evaluate proposals from sites wanting to be added to LandNet Five years of demonstrated use for a single application or sensor Use of site for a minimum of three sensors, one of which provides globally-available products

One view of RadCalNet structure

Guidance that will be provided by RadCalNet Working Group to prospective test sites – NOTE: draft version

Process for approval of a RadCalNet site at WGCV level Steps 1 and 2 Prospective site manager documents that they meet requirements for membership RadCalNet group will provide advice and guidance to prospective sites Submission of documentation to a RadCalNet Admission Review Panel Panel made up of five WGCV members Panel members distributed geographically

Process for approval of a RadCalNet site at WGCV level 3) Panel formulates a recommendation to be carried forward to the WGCV membership A recommendation for approval requires concurrence by majority of panel Much of the evaluation process can take place via telecon/email 4) WGCV plenary acts on the recommendation either via email or at a WGCV meeting Recommendation is accepted at a WGCV meeting unless three members that are present indicate disapproval To act on the recommendation outside a WGCV meeting Panel recommendation forwarded to full WGCV membership with at least one month for evaluation Recommendation is accepted unless five members register disapproval by email

RadCalNet and Landnet RadCalNet Panel will evaluate RadCalNet admissions Also evaluate Landnet RadCalNet panel can recommend changes to the requirements, admissions criteria, admissions evaluation Recommendation would be evaluated by WGCV Allows for iterative improvements

What do we need to do today? Agree upon the process Five member panel Approval approach Voting levels Agree on panel membership (Proposed make up below) Panel Lead – is representative from RadCalNet WG Two members from IVOS Chair Member at large Two members from WGCV at large Select the WGCV members that will serve on the panel