VectorLink Collect: Using the DHIS 2 platform to standardize data collection and reporting for IRS

Slides:



Advertisements
Similar presentations
Dereje Dengela Abt Associates November 15, 2012 Building Local Capacity.
Advertisements

COMP1007 Introduction to Requirements Analysis Module Leader: Dr Pam Watt
Promoting economic recovery through green growth… Menelaos Ioannidis CEO BuildIT InfocomGreen May
Roadmap to Achieve RBM Targets January 2011 – December 2011 Mozambique.
Rare’s CampaignTracker A brief overview of its design and function and what we have learned so far.
WHO Global Malaria Programme Technical Expert Groups.
DOES YOUR DATA TALK TO YOU?. A NEW SOFTWARE PLATFORM FOR THE COLLECTION AND ANALYSIS OF ENVIRONMENTAL DATA.
Combining Entomological, Epidemiological, and Space Mapping data for Malaria Risk-mapping in Northern Uganda Findings and Implications Ranjith de Alwis,
National Malaria Program Scale-up for Advocacy Based on Impact 23 January 2006.
Esri UC 2015 | Technical Workshop | Land Records Maps and Apps for State and Local Governments Chris Buscaglia Scott Oppmann.
Scott Ruddick Director, Integrated Support Services MEDA.
ICG-WIGOS-3 Status of the WIGOS Operational Information Resource (WIR) Etienne Charpentier (OBS/WIGOS/OSD) WMO; OBS.
Curriculum Development A commitment to continuous improvement… Students and Learning It’s a people business… and it centers on…
Cmpe 589 Spring 2006 Lecture 2. Software Engineering Definition –A strategy for producing high quality software.
Roadmap to Achieve RBM Targets September 2009 – December 2010 Malawi.
INDEPTH Network Effectiveness and Safety Studies Platform (INESS) Update-INDEPTH AGM 2010 Aziza Mwisongo INESS secretariat Sep, 2010.
Powered by. Sengen US based firm, founded in 1989 Software product, Application development and Consulting 100+ customers across the globe in diversified.
Strategy for the assessment of information on DDT John Githure.
Kenya Roadmap to Achieve RBM Targets September 2009 – December 2010.
Esri UC 2014 | Technical Workshop | ArcGIS for Public Works: An Overview Lindsay Thomas Scott Oppmann.
Roadmap to Achieve RBM Targets January 2011 – December 2011 [TANZANIA]
TECHNOLOGY INTEGRATION Atul Kaushik Joint Secretary Department of Justice.
Using Data To Drive Practice Faith Muigai Jacaranda Health.
PowerSchool MOIS 508 Dr. Dina Rateb Presented by: Mohamed Safwat.
LLIN Universal Coverage (UC) in Uganda: Process Evaluation (PE) Methodology Presenter at KET: Caroline Asiimwe LLIN Process Evaluation Team (Adoke Yeka,
Roadmap to Achieve RBM Targets September 2009 – December 2010 MOZAMBIQUE.
Latest Developments in the Information Systems for Environmental Monitoring in ExEA - Bulgaria 13th session of the UNECE Working Group on Environmental.
Digital SMC Implementation in The Gambia Huja Jah ACCESS-SMC Project Manager 19 th January
Food and Agriculture Organization of the United Nations Regional Office For The Near East – 14 January 2009 Regional Skill Mix Experts Roster Magdi Latif.
A serious game to aid training in Insecticide Resistance Management for malaria vector control programs in Africa Andy etchteam.wordpress.com.
SAP Process Mining by Celonis
Information Systems Development
Summary presentation: Q & A Session
Vietnam Education system overview
Malaria Elimination Programme Timor Leste
Connecting to the Global Data Ecosystem
CommCare 101: The PMI AIRS Project Supervisory Tool
UNICEF Uganda innovation strategic framework
W3 Status Analyzer.
M2M Revolution Turning Potential into Profit Menelaos Ioannidis
The Role of Entomological Monitoring for Malaria Vector Control
WP1 – Smart City Energy Assessment and User Requirements
Sara Gaudon, Executive Director of LogicalOutcomes
microsoft dynamics ax training in dubai (msdynamicsaxtraining.com)
Evolution to scale Lessons learned from the Safer Deliveries program in Zanzibar, from pilot to scale The Safer Deliveries program has been working in.
Information Systems Development
Stratus Innovations Group Intelligent Factory™ Solution Offering
A Framework for Digital Tool Use in Malaria Surveillance Programs
Implementation and Maintenance
Oracle Cloud Financials Implementation: A Customer Experience
Commission des affaires humanitaires HUG
The Unified/Rational Unified Process (UP/RUP) Defined
"Overview of Malaria incidence (API) and control in Solomon Islands"
Creating value for the public sector
Statistics beyond the National Level –Regional Experiences
Chairs: Brad Lucas, Allison Belemvire & Kristen George
Project Phases ‘98 ‘00 ‘02 ‘04 ‘06 Preparatory Phase
Increasing the use of data in IRS decision making
30 January 2019 Evaluation of Pirimiphos-Methyl Efficacy in Experimental Huts with Partially Sprayed Surfaces Against Natural Populations of Anopheles.
Agenda Purpose for Project Goals & Objectives Project Process & Status Common Themes Outcomes & Deliverables Next steps.
The Family Recovery Project
Red Sky Update “Watching the horizon for emerging health threats”
TRACE INITIATIVE: Data Use
DBOS DecisionBrain Optimization Server
National Monitoring and Reporting System
WP6 – EOSC integration J-F. Perrin (ILL) 15th Jan 2019
Selecting the right CRM for your charity and the importance of data
Real-Time Environmental Parameters Monitoring
Module 1.4 Vision for the Master Facility List
Module 1.1 Overview of Master Facility Lists in Nigeria
Presentation transcript:

VectorLink Collect: Using the DHIS 2 platform to standardize data collection and reporting for IRS Meghan Tammaro, VectorLink Monitoring & Evaluation Specialist 30 January 2019 VectorLink Collect

Standardized data lead to improved project monitoring and informed decision making. VectorLink Collect 30 January, 2019

What is DHIS 2 and VectorLink Collect? The District Health Information Software 2 is an open-source software platform for data entry, analysis, and dissemination. It is currently being used in over 60 countries. It can be used off-the-shelf or can be fully customized and, as a software, is not limited to a specific type of data. VectorLink Collect is the standardized project database that will house all project IRS and entomology data. VectorLink Collect 30 January , 2019

DHIS 2 for IRS Continuous: VectorLink Collect builds on the current database and data collection and entry practices, minimizing interruptions Simple: Fewer opportunities for failure on a cloud-based system with fewer component parts Robust: Once configured to country specifications, it does not need to be rebuilt for each annual campaign Dynamic: Real-time data visualization is user-driven and can be user-specific without compromising data integrity Interoperable: DHIS 2-based systems can “talk to” other DHIS 2-based systems and a handful of non-DHIS 2 systems Sustainable: All PMI-focus countries have at least a pilot instance of a DHIS 2-based system VectorLink Collect 30 January , 2019

DHIS 2 for Entomological Monitoring Data Focus Areas: Insecticide resistance Insecticide residual life and LLIN Insecticidal Activity Vector Bionomics Continuous: Builds on standardized entomology data collection forms to minimize interruptions to data analyses Dynamic: Real-time data visualization is user-driven and can be user-specific without compromising data integrity Aligned Configuration: VectorLink Collect’s ento module is being configured in alignment with WHO ento module Phased Roll out: Y1 (2018): Configuration complete Legacy data migration begins Y2 (2019): Testing, iteration Pilot countries data entry Legacy data migration continues Ongoing rolling implementation VectorLink Collect 30 January , 2019

VectorLink Collect Dashboard Example 30 January , 2019

VectorLink Collect Dashboard Example 30 January , 2019

Thank you, find out more visit rollbackmalaria.org @RollBackMalaria 30 January 2019 Thank you, find out more visit rollbackmalaria.org @RollBackMalaria RBM Partnership to End Malaria 3rd floor, TCS Building, Chemin de Blandonnet 2, 1214 Vernier, Geneva, Switzerland. Info@rollbackmalaria.com VectorLink Collect 30 January, 2019