SLAC Beam Test Facilities Overview (emphasis ESTB) Carsten Hast, SLAC

Slides:



Advertisements
Similar presentations
L-Band Test Stands in ESB Carsten Hast Test Facilities Department Helps to develop and test near-term solutions for accelerator systems including RF structures.
Advertisements

SLAC UED/UEM Initiative and
SINBAD Ralph W. Aßmann Leading Scientist, DESY LAOLA Collaboration Meeting, Wismar
SLAC Electron Beam Test Facilities 5 MeV to 20 GeV Carsten Hast, SLAC SiD Workshop, Oct. 15 th, SLAC 2013 FACET ● ESTB ● NLCTA ● ASTA.
SLAC Electron Beam Test Facilities 5 MeV to 23 GeV Carsten Hast, Head Test Facilities SAREC Meeting at SLAC, July 2013 FACET ● ESTB ● NLCTA ● ASTA.
Sub-picosecond Megavolt Electron Diffraction International Symposium on Molecular Spectroscopy June 21, 2006 Fedor Rudakov Department of Chemistry, Brown.
Detection of Gamma-Rays and Energetic Particles
ESTB Test Beam Upgrades Hadrons Shorter bunch length Carsten Hast March 17 th 2011.
SLAC Accelerator Research and Introduction to SAREC Tor Raubenheimer FACET Users Meeting August 29 th - 30 th, 2011.
FACET: A National User Facility Carsten Hast SLAC National Accelerator Laboratory.
Radiation Physics Beam Tests J. Bauer, J. Liu, L. Nicolas, S. Rokni, M. Santana ESTB Workshop 2011 March 17, 2011.
February 19, 2008 FACET Review 1 Lab Overview and Future Onsite Facilities Persis S. Drell DirectorSLAC.
R Frey ESTB20111 Silicon-Tungsten Electromagnetic Calorimeter R&D Collaboration M. Breidenbach, D. Freytag, N. Graf, R. Herbst, G. Haller, J. Jaros, T.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Discussion session Carsten Hast, Mauro Pivi SLAC.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Recirculation Concept - Cyclotron Radio frequency alternating voltage Hollow metal drift tubes time t =0 time t =½ RF period D-shaped.
Particle Production in the MICE Beam Line Particle Accelerator Conference, May 2009, Vancouver, Canada Particle Production in the MICE Beam Line Jean-Sebastien.
NLCTA and ESA (Next Linear Collider Test Accelerator and End Station A) Carsten Hast Test Facilities Department Head SLAC DOE HEP Review July 7 – 9, 2008.
Introduction to FACET & Test Facilities and charge to SAREC committee Vitaly Yakimenko June 25, 2013.
SLAC FEL R&D Test Facilities Test Facility Task Force R. Hettel May 4, 2011.
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
Pavel Karataev John Adams Institute for Accelerator Science At Royal Holloway, University of London oPAC Advanced School on Accelerator Optimisation 7-11.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
The End Station Test Beam (ESTB) at SLAC Carsten Hast For the everlasting never giving up SLAC Test Beam Gang R. Erickson, T. Fieguth, C. Hast, J. Jaros,
SLAC End Station A Test Beam ESTB Carsten Hast SLAC National Accelerator Laboratory ALCPG11 Eugene, Oregon March 22 nd, 2011.
SLAC ARD Test Facilities Tor Raubenheimer December 8 th, 2010.
FACET User Support Carsten Hast Accelerator Research Division Test Facilities Department
Developing Imaging Calorimeters for a SiD-Flavor Lepton Collider Jacob Smith Linear Collider Physics School Ambleside,England 2009.
AboutFACET What is FACET Current Research PUBLICATIONS NAVIGATE UP Dielectric Wakefields.
SABER, “maybe” a new facility in the South Arc (South Arc Beam Experimental Region) End Station A (ESA) in 2007 ILC Test Beams in 2008 Test Beams beyond.
Basic Energy Sciences Advisory Committee MeetingLCLS February 26, 2001 J. Hastings Brookhaven National Laboratory LCLS Scientific Program X-Ray Laser Physics:
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
End Station A Test Beam Facility ESTB Carsten Hast SiD Workshop SLAC, January 16-18, 2013,
Beam-Plasma Working Group Summary Barnes, Bruhwiler, DavidTech-X Clayton,
Commissioning and Utilisation of ERLP David Holder ASTeC, Daresbury Laboratory.
Tuning Techniques And Operator Diagnostics for FACET at SLAC National Accelerator Laboratory Chris Melton SLAC Accelerator Operations.
Energy Loss Simulation for the CDF Run II W Mass Measurement Tom Riddick University College London.
SLAC Electron Beam Test Facilities 5 MeV to 20 GeV Carsten Hast, SLAC TIPP 2014, Jun. 5 th, Amsterdam 2014 FACET ● ESTB ● NLCTA ● ASTA Focus on ESTB.
Proposal for the End Station Test Beam (ESTB) at SLAC John Jaros ALCPG09 Albuquerque September 30, 2009.
SLAC Accelerator Research Program Tor Raubenheimer SLUO Meeting, July 17, 2009.
Monte Carlo simulation of the particle identification (PID) system of the Muon Ionization Cooling Experiment (MICE) Mice is mainly an accelerator physics.
Project Overview James Fast Pacific Northwest National Laboratory.
Carsten Hast User Facilities for HEP and Photon Science at SLAC
“Performance test of a lead glass
Design of an ECHO-seeded FEL at nm wavelength
End Station A Test Beam ESTB Design, Performance, Infrastructure, Status Mauro Pivi, SLAC on behalf of the ESTB team: C. Hast, T. Beukers T. Fieguth, R.
WP11: electron and proton beam testing
SLAC ESTB End Station A Test Beam Other Test Beams
XFEL Beam Physics 10/30/2015 Tor Raubenheimer.
What am I working on… H. Loos 08/02/2010.
Electron Source Configuration
LCLS Longitudinal Feedback and Stability Requirements
SLAC ARD Test Facilities
End Station Test Beam (ESTB) at SLAC
Recent Activities H. Loos 02/15/2011.
LCLS Commissioning Parameters
Probing deeper into matter …
Two-bunch self-seeding for narrow-bandwidth hard x-ray FELs
Brief Introduction to (VUV/)Soft X-ray FELs
Design of an ECHO-seeded FEL at nm wavelength
The Detector System of the MICE Experiment
LCLS FEL Parameters Heinz-Dieter Nuhn, SLAC / SSRL April 23, 2002
High Charge Low Emittance RF Gun for SuperKEKB
SLAC Radiation Safety Work Control Form Process:
IPBI-TN R. Arnold (with help from T. Fieguth)
Proposal for Smith-Purcell radiation experiment at SPARC_LAB
CDR2 – Injection System Injection system overview (Seeman) (2 pages)
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
Plasma : high electic field can accelerate electron and proton laser plasma accelerator can reduced size of future accelerator can produced particle beam.
Presentation transcript:

SLAC Beam Test Facilities Overview (emphasis ESTB) Carsten Hast, SLAC Facility Purpose Parameters FACET Accelerator R&D, Material Science, THz Very focused and short bunches at 20GeV e+/- ESTB Detector R&D, LC MDI, Radiation Tests 2-15GeV primary LCLS beam or single e- NLCTA Accelerator R&D, Medical, Radiation Tests 60 to 160 MeV, small emittance, very versatile infrastructure ASTA Gun and RF Testing, RF processing, new Ultrafast Electron Diffraction Beam Line <50MeV, X- and S-Band RF power All supported by SLAC’s Test Facilities Department http://facet.slac.stanford.edu and http://estb.slac.stanford.edu e-mail: hast@slac.stanford.edu Google: SLAC FACET or SLAC ESTB Carsten Hast, SLAC, SLAC Electron Beam Test Facilities

ESTB: Different Configurations for 1 to 100 Electrons for Detector R&D or Primary Beams up to 15GeV Single electron per event for Cherenkov or Calorimeters Multiple, well separated electrons per event 10 to hundreds of electrons per event for Silicon trackers 1e- 2e- 3e- 4e- 5e- 6e- Primary Beam for Cosmic Air Shower Simulation Primary Beam for Radiation 100MRad/day Primary Beam for Beam Physics (eg: channeling) Carsten Hast, SLAC, SLAC Electron Beam Test Facilities