Transjakarta – Busway BRT SYSTEM

Slides:



Advertisements
Similar presentations
1 Radio Maria World. 2 Postazioni Transmitter locations.
Advertisements

Números.
York Viva Bus Rapid Transit (BRT) Concept image along Davis Drive.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Emphasizing TDM in Transportation Planning Asher Mercer TDM Summit November 18, 2009.
/ /17 32/ / /
Reflection nurulquran.com.
EuroCondens SGB E.
Worksheets.
Slide 1Fig 25-CO, p.762. Slide 2Fig 25-1, p.765 Slide 3Fig 25-2, p.765.
1 Changing Profile of Household Sector Credit and Deposits in Indian Banking System -Deepak Mathur November 30, 2010.
Tysons Tysons Corner Circulator Study Board Transportation Committee June 12, 2012.
County of Fairfax, Virginia 1 Department of Transportation Bus Stop Improvement Program Fairfax County Department of Transportation Transit Services Division.
Innovation: User Support Terminals. Built around existing integration terminals Combine social services, shopping, banking, etc. Provide service access.
Metropolitan Transportation Authority July 2008 Financial Plan MTA 2009 Preliminary Budget July Financial Plan 2009 – 2012 DJC.
Metropolitan Transportation Authority November 2008 Financial Plan /15/ :22 AM 1 Metropolitan Transportation Authority November 20,
2008 MTA NYC Travel Survey Summary of Selected Results June 22, 2009.
1 ECOMM 2010 moving people – bridging spaces How klima:aktiv mobil helps to move and bridge DI Robert Thaler Head of Division Transport,
CALENDAR.
Summative Math Test Algebra (28%) Geometry (29%)
Parking Management in Zurich: the key towards usage of private cars in the City Roberto De Tommasi, synergo, Zurich ECOMM2011 Toulouse, 18 – 20 May 2011.
Perry Points of Pride... Creating the New Perry Way Attractive 1. Become Attractive To All Community 2. Build Community Spirit Identity 3. Establish Our.
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
Traffic Impact Study “Study to evaluate the impact on a roadway network due to a proposed development”
The basics for simulations
Development of Bus Rapid Transit (BRT) in Africa Experience from Lagos, Accra and Kampala.
Prague Public Transport Co. Inc. Jan Barchánek Bus operation unit, deputy manager Prague, May 2012 Basic information Metropolitan bus lines.
1 The Role of Bus Transit in the Regional Transportation, Present and Future Howard Benn, Chair, TPB Regional Bus Subcommittee TPB Regional Priority Bus.
West Michigan Transit Linkages Study Wednesday, June 4 th, :00 a.m. Grand Valley State University Kirkhof Center Conference Room 2266.
Los Angeles Bus Rapid Transit Tour Lessons Learned.
How LRT affect Kayseri Feyzullah GUNDOGDU Kayseri Light Rail System Fixed Installation Manager
Andrew McNaughton 1 Radical Change is Entirely Possible! 2 nd November 2011.
Jeremy Siviter, IBI Group, Project Manager May 18th, 2011
Barcelona presentation 1 st Interest Group Workshop Regina Enrich Sard Researcher at Mobility&Energy Group Barcelona Digital Technological Centre 26 th.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Riverside Community College District Free Bus Ride Program.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Progressive Aerobic Cardiovascular Endurance Run
Adding Up In Chunks.
SLP – Endless Possibilities What can SLP do for your school? Everything you need to know about SLP – past, present and future.
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Before Between After.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
1 presented to Policy Steering Committee presented by AC Transit May 15, 2009 East Bay Bus Rapid Transit.
Static Equilibrium; Elasticity and Fracture
Resistência dos Materiais, 5ª ed.
Title: Energy and Environmental Benefits of Bus Rapid Transit in APEC Economies Presenter’s Name: Walter Kulyk Economy: United States 35th APEC Transportation.
1 Access Line Operation Analysis & Case Study in Beijing Metro System Zhili Liu, Ph.D. School of Traffic and Transportation Beijing Jiaotong University.
UNDERSTANDING THE ISSUES. 22 HILLSBOROUGH IS A REALLY BIG COUNTY.
A Data Warehouse Mining Tool Stephen Turner Chris Frala
Asia BRT Conference HUBLI-DHARWAD BRTS PROJECT Presented by: Commissioner, DULT.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Summary of Conference Proceedings Prof H. M. Shivanand Swamy CEPT University September 8, 2012 Ahmedabad Management Association.
9/7/2012 MBS UU.
MAXIMIZING THE AIR QUALITY BENEFITS OF BUS RAPID TRANSIT Walter Hook, BAQ Conference Agra, India, December, 2004 Funded by the US Agency for International.
Jabodetabek and domestic connectivity M. Benmaamar Bappenas August 25 th,
The Potential BRT in Asia
Managing Director/CEO
Presentation by: Permanent Secretary - PMORALG Mr. Jumanne Sagini 3 rd June 2014.
Worldwide Developments in BRT Walter Hook, Executive Director, ITDP Transforming Transportation, World Bank, January 2011.
BRT in India Delhi Case study. What is Delhi HCBS Delhi HCBS is not a BRT system. It is primarily a road infrastructure project. It was not conceived.
10 May 2015 Planning for BRT in Giza and New Cairo.
Project Information Brief project description Cairo, Egypt Bus Rapid Transit System with potential capacity of 45,000 people per person per direction Phase.
February 2014 Bus Rapid Transit for Chennai. Chennai city bus service GOOD PATRONAGE  50 lakh daily passenger trips  3650 buses  Maximum flow of.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
Menauitpuitptransport#MENAUITP Land Transportation Projects in the Kingdom of Bahrain Nada Deen Director, Land Transportation Projects Ministry of Transportation.
Presentation transcript:

Transjakarta – Busway BRT SYSTEM Asia BRTS Conference, Ahmedabad Putri Dina Sari El-Amir, Transjakarta Communication Associate

Outlines BACKGROUND INFRASTRUCTURE, OPERATIONAL, ORGANIZATIONAL, AND BUSINESS MODEL KEY PERFORMANCE FIGURES FUTURE DEVELOPMENT

Transport in Jakarta at glance The number of motor vehicles in Jakarta currently stands at 6.7 million and increases by 11% per year; 296 new four-wheeled motor vehicles are added daily to the city’s traffic; A daily inflow of >700.000 motor vehicles from Jakarta’s surrounding cities, brings an estimated 1.6 million people; The low ratio of public transportation vehicles to private vehicles (92.8); Low capacity of public transport of 17 million trips daily, only 53% are taken by public transportation; The poor condition of public transportation vehicles, which also gradually decrease in number.

PUBLIC TRANSPORT DEMAND (trips/day) 5.302.194 7.384.939 847,750 9.445.808 1,078,663 1,465,912 Tangerang Bekasi 545,310 693,099 940,834 620,702 2002 7.3 Million Trips/day 2010 9.9 Million Trips/day 2020 13 Million Trips/day 791,295 1,148,528 Bogor & Depok

Why BRT in Jakarta? Local government’s responsibility to provide good public transport system Faster time of construction Road infrastructure supports the system Flexibility in determining the bus route Suitable infrastructure for transition before the implementation of bigger system such as Subway Efficient usage of road space Success stories in other cities in the world

Transjakarta BRT In operation: 1st corridor: 2004 2nd & 3rd corridor: 2006 4th & 7th corridor: 2007 8th corridor: 2009 9th & 10th corridor: 2011 11th corridor: 2012 Closed trunk BRT system Network-based System Off-board fare collection High platform-median BRT station Public sector bus procurement and private sector bus operation Flat Fare throughout the system

TRANSJAKARTA SYSTEM NETWORK Length of Corridor: 191.25 km (11 corridors) Number of Stations: 206 shelters (spacing ± 1 km) Number of Routes: 21 routes Feeder Service: 3 routes Fleet Size: 544 buses (73 articulated) Fleet Fuel: CNG except 1st corridor Number of Operators: 9 operators Number of Bus Depots: 8 depots Employee: more than 5,500 Fare: IDR 3,500 (0.4 USD), free transfer

Transjakarta Route Map With 11 corridors, the network is expanded up to 25 routes, minimizing transfer for Passenger

Technology Features in Transjakarta GPS-based vehicle tracking system Onboard CCTV Online CCTV system for BRT station 203 CCTV cameras, 30 of which are shared through the website at www.transjakarta.co.id 48 are also monitored live via Fibre Optic connection, the rest use on-site recording e-Ticketing system contactless smart card 3 type of payment: JakCard, Single Trip, and Multi Trip currently operational for 6th corridor, all corridor will be operational by the end of this year

Legal and Institutional Form Transjakarta is managed by BLU Transjakarta, a technical agency under supervision of Jakarta Transportation Agency BLU Transjakarta is a government body with flexibility in some financial aspect such as: Government agency that is allowed to sell its services to the public. Revenues can be directly used for operation. Non- BLU government agencies are not allowed to do this. Also allowed to receive subsidy

Transjakarta Vision & Mission Statement Transjakarta as a fast, safe, efficient, humane and comfortable public transportation with international standards. Mission To reform Jakarta’s public transportation system and the manners of its users. To provide a public transportation service that is more reliable, of better quality, fairer to its users and operates with a guaranteed continuity in Jakarta. To provide a medium-long-term solution to Jakarta’s public transportation problems. To apply proper socialization and approaches to the city’s stakeholders to help the implementation of Transjakarta’s integrated transportation system. To accelerate the implementation of the busway network in Jakarta while considering practicability, public acceptability and easy of implementation. To develop a management institution with continuity. To develop a public service agency based on good corporate governance, accountability and transparency.

Key Performance Figures

TRANSJAKARTA Performance Ridership (pax) per year : 2004 : 15,942,423 2005 : 20,798,196 2006 : 38,828,039 2007 : 61,446,336 2008 : 74,619,995 2009 : 82,377,670 2010 : 86,937,287 2011 : 114,783,774 Highest one-day passenger record: 383,031 (July 2011) With 8 years in operation, Transjakarta passengers has increased almost 8 times since its opening year

Transjakarta Busway Financial Facts Revenues : 2004 : Rp 39,063,108,475 2005 : Rp 55,831,672,900 2006 : Rp 130,783,673,000 2007 : Rp 205,779,781,500 2008 : Rp 248,339,552,000 2009 : Rp 274,517,532,000 2010 : Rp 288,757,425,500 2011 : Rp 379,457,500,500 2012 (May) : Rp 155,175,402,500 Approximately (in current US$ rate): 2011: USD 39,526,822.97 2012: USD 16,164,104 (May) (@ US$1 = Rp. 9,600) Cost Recovery : 2004 : 89.91% 2005 : 97.51% 2006 : 75.18% 2007 : 59.37% 2008 : 60.94% 2009 : 61.30% 2010 : 62.56%

Operational Challenges Limited CNG supply only 5 CNG station in Jakarta to serve all the Transjakarta fleet causing loss of service time of the fleet Mixed traffic and unsterilized lanes encroachment by motorcycles and cars substantial mixed traffic segment in almost all corridors Insufficient fleet supply highly increasing demand

Future Development

Network Expansion Construction of 12th, 13th, 14th, and 15th corridor as planned in the Jakarta Transportation Masterplan. 12th corridor will be operational by the end of this year. 13th – 15th corridor will be built elevated

Direct-Service Implementation Senen Based on Guangzhou BRT Incorporating existing bus routes to support Transjakarta BRT service Making Transjakarta an open system BRT P.20 Manggarai S.66 S.612 Kp Melayu Blok M KORIDOR 6 T.57 S.612 Ps Minggu Lebak Bulus P.20 S.75 Ragunan Blk Kp Rambutan

Station Expansion Implementation of multiple sub stops to accommodate direct-service with overtaking lane at every station.

New Station Design New station design to promote a better image of Transjakarta as an integral part to the life of Jakarta citizens.

Thank You www.transjakarta.co.id @BLUTransjakarta