Chapter 15 - Material & Capacity Requirements Planning(MRP/CRP)
To Accompany Ritzman & Krajewski Foundations of Operations Management, © 2003 Prentice Hall, Inc. All rights reserved. Chapter 15 Resource Planning.
15 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Inventory and MRP 15 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
Material Requirements Planning
University of Southern California Enterprise Wide Information Systems Manufacturing Planning and Execution Instructor: Richard W. Vawter.
Perencanaan Kapasitas Produksi
Materials Requirements Planning (MRP) Material Requirement Planning (MRP)  MRP determines the number of components and raw material required and their.
Production and Service Systems Operations
© 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Operations Management Material Requirements Planning (MRP) & ERP Chapter 14.
MATERIAL REQUIREMENTS PLANNING (MRP) AND ERP Chapter 14 1.
Aggregate Planning and Resource Planning Chapters 13 and 14.
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc. Upper Saddle River, N.J Material.
Operations Management Material Requirements Planning
Resource Requirements Planning:
MRP Systems MRP – Material Requirements Planning Commonly used method in industry to coordinate the production scheduling of end items and their associated.
Dependent demand lumpy MRP DETAILED SCHEDULE FOR RAW MATERIALS & COMPONENTS USED IN THE END PRODUCTS MASTER SCHEDULE FOR END ITEMS.
Resource Planning OPIM 310-Lecture #7 Instructor: Jose Cruz.
Master Production Scheduling Logistics Workshop Asia 2004 Phnom Penh, Cambodia 10 – 14 May 2004.
11DSCI4743 Capacity Management Capacity management is planning & controlling resources needed to meet production objectives –Planning: determining resources.
1 OM3 Chapter 13 Resource Management © 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible.
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
“Do Green” Two Options: Prescriptive Custom Prescriptive- -Must be running a MODULATING ROTARY SCREW AIR COMPRESSOR -Must be 75 Horsepower or Less Custom-
To Accompany Ritzman & Krajewski Foundations of Operations Management, © 2003 Prentice Hall, Inc. All rights reserved. Chapter 12 Resource Planning.
4/4: Material Requirements Planning Dependent inventory model For in-house inventory planning.
1 MRP: Based on Dependent Demand u This chapter explores: –Master production schedule –Material Requirements Planning (MRP) »System structure »Example.
1 © The Delos Partnership 2003 Detailed Planning processes Material Planning and Capacity Planning.
Aggregate Planning and Resource Planning Chapters 13 and 14.
CAPACITY MANAGEMENT Nyoman Pujawan.
CAPACITY PLANNING Prof. Dr. Orhan Torkul Res. Assist. M. Raşit Cesur.
Lecture 11 Capacity Management and Planning Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,
(Material Requirements Planning)
Session 3 University of Southern California ISE514 September 1, 2015 Geza P. Bottlik Page 1 Outline Questions? Sales and Operations Planning Examples Qualifiers.
15 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Resource Planning Chapter 15.
Introduction to Materials Management Chapter 4 – Material Requirements Planning.
Manufacturing Systems Engineering
BUAD306 MRP.
Material Requirements Planning Chapter 2. MRP in MPC.
Material Requirement Planning Kusdhianto Setiawan, SE, Siviløkonom Faculty of Economics – Gadjah Mada University.
© 2008 Prentice Hall, Inc.14 – 1 Material Requirements Planning (MRP)
© 2008 Prentice Hall, Inc.14 – 1 Operations Management Chapter 14 – Material Requirements Planning (MRP) and ERP PowerPoint presentation to accompany Heizer/Render.
Material Requirements Planning
Capacity Planning and Utilization
Arnold, Chapman, & Clive: Intro Materials Management, 6 th ed. © 2008 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Production.
Master Production Scheduling (MPS)
Manufacturing Planning and Control
FDFPLSCP4A Manage and schedule production
Facility Inventory Old Facilities Modern Facilities Classroom Size
COMPUTER INTEGRATED MANUFACTURING
Capacity: Matching Productive Resource to Demand
Introduction to Materials Management
BUAD306 MRP/ERP.
12 Inventory Management PowerPoint presentation to accompany
Introduction to Materials Management
Chapter 7 Capacity Planning and Management
OUTLINE Questions? Midterm Results Go over Midterm Go over Homework
Manufacturing Planning and Control
Material Requirements Planning (MRP)
Outline Questions? Quiz on Thursday Any Questions on MRP Records?
OUTLINE Questions? Quiz Discuss homework New Homework Start MRP.
Introduction to Materials Management
Material Requirement Planning (MRP)
Capacity Planning.
Operations Management
Resource Planning Chapter 16
Incorporating lot sizing into MRP
Tour - session 3 Calendars, Work Centers and Routings
Material Requirement Planning (MRP)
Capacity Management Capacity management is planning & controlling resources needed to meet production objectives Planning: determining resources needed.
Presentation transcript:

OUTLINE Questions? Quiz Results New homework MRP Capacity

Capacity Capacity planning is the process of reconciling the difference between the capacity available for the process and the capacity required to properly manage a load to satisfy the timing of the output for the specific customer whose orders represent the load “The fundamentals of production planning and control”, Stephen N. Chapman, Pearson Prentice Hall, 2006, ISBN 0-13-017615-X

Capacity – Rough cut These methods that are the easiest to calculate and take the least amount of data are also the methods that are the "roughest" - meaning the least specific and detailed. Overall Factors. This method is the "roughest" of the rough-cut methods. Take the number of the items being produced on the master schedule and multiply them by the standard hours used to produce the item. The capacity required per work center is then calculated by taking a historical percentage of each work center’s usage.

Capacity – Rough cut – overall factor Overall Factors (also see Excel spreadsheet)

Capacity – Another method Calculate hours required per work center per product in the period in which the product is to be delivered. Add all products Product A WC 1 0.25 hours WC 2 0.1 hours WC 3 0.3 hours Units required 100 WC 1 25 hours WC 2 10 hours WC 3 30 hours

Capacity Requirements Planning (CRP) – most detailed The routing file. Containing information about the route the work is to take through the facility work centers, including the operations that are to be performed. The work center file. Generally contains information on the various ele­ments of lead time associated with the type of equipment in the center. These time elements can include: Move time - the time it usually takes to move material from one work center to another. Wait time - the time material has to wait to be moved after it has had an operation completed. Queue time - the time material has to wait in front of an operation before it can be processed by that operation. In many operations queue time tends to be the largest element of total lead time.

Capacity Requirements Planning (CRP) – most detailed Production lead time is generally defined to be the total of move time, wait time, queue time, setup time, and run time for the given lot size of the ma­terial produced. The "downside" of using detailed CRP is that while most of the rough-cut methods can be set up on a spreadsheet using only standard information with the master schedule, CRP requires MRP to be run. In fact, most modern sys­tems include a detailed CRP module that is linked directly into the MRP run. CRP tends to be too complex and requires too much data from other files to be run on a "stand-alone" spreadsheet application.

Example Bill of Material X – 1 A and 1 B Y – 1 A and 2 C

Example

Example

Example

Example we will assume, for convenience sake, that each operation in the routing takes 1 week to accomplish. That implies that for the products due at the end of week 5 (and therefore assembled during week 5), the components to assemble those products must have been built in week 4.

Capacity