Raising the PAR Date: Authors: January 2014 January 2014

Slides:



Advertisements
Similar presentations
Submission doc.: IEEE 11-13/1100r0 September 2013 Osama Aboul-Magd (Huawei Technologies)Slide 1 HEW SG Progress Review Date: Authors:
Advertisements

Doc.: IEEE /1510r0 Submission November 2014 Edward Au (Marvell Semiconductor)Slide 1 Summary of PAR and CSD Discussion Date: Authors:
Submission doc.: IEEE 11-15/ Approach to NG60 Peak Rate Slide 1 January 2015 Yi Wang, Huawei Authors: NameAffiliationAddressPhone Hong LiHuaweiNo.2222,
Doc.: IEEE /1167r2 Sept 2014 SubmissionYonggang Fang et. al. (ZTE) TGax Functional Requirement Discussion Date: Slide 1 Authors: NameAffiliationAddress .
Doc.: IEEE /xxxxr0 Submission Preamble structure for 11ax system January 2015 Slide 1 Date: Authors: Jiayin Zhang, et al. (Huawei Technologies)
Doc.: Submission January 22, 2014 Rene Struik (Struik Security Consultancy)Slide Privacy & HEW Date: Authors: NameCompanyAddressPhone .
Submission doc.: IEEE 11-14/0026r1 January 2014 Yong Liu, et al.Slide 1 Thoughts on HEW PAR Date: Authors:
Doc.: IEEE /0498r0 Submission April 2008 Eldad Perahia, Intel CorporationSlide 1 Modifications to the 60GHz PAR & 5 C’s Proposal Date:
Doc.: IEEE /0065r0 Submission January 2014 William Carney, SONYSlide 1 Comments on Draft HEW PAR Date: Authors:
Doc.:IEEE /0821r3 Submission July 2008 Minho Cheong, ETRISlide 1 Some Ambiguities about Throughput Conditions in PAR Date: Authors:
Doc.: IEEE /0542r0 SubmissionSimone Merlin, QualcommSlide 1 HEW Scenarios and Goals Date: Authors: May 2013.
Discussion on ax functional requirements
Doc.: IEEE /1366r3 Submission November 2013 Laurent Cariou (Orange)Slide 1 Some propositions to progress towards the PAR definition Date: 2013-xx-11Authors:
China MM-Wave (CMMW) Study Group Comments on aj PAR & 5C
VHT SG Report to EC Date: Authors: November 2008 April 2007
Response to Official Comments
Proposed wording revisions to HT PAR Wednesday, March 12, 2003.
VHTL6 task group work plan proposal (VHTL < 6 GHz)
Proposed basis for PAR discussion
Requirements Discussion
VHT SG Report to EC Date: Authors: July 2008 April 2007
2111 NE 25th Ave, Hillsboro OR 97124, USA
High-efficiency WLAN Straw poll
Below 6GHz 11vht PAR scope and purpose discussion
Below 6GHz 11vht PAR scope and purpose discussion
Proposed Modifications to VHT60 PAR
HT SG PAR Proposal Colin Lanzl Aware, Inc.
On High Efficiency WLAN (HEW) TG PAR Scope
VHT60 Tutorial Date: Authors: July 2008 April 2007
Some propositions to progress towards the PAR definition
2111 NE 25th Ave, Hillsboro OR 97124, USA
VHT SG Report to EC Date: Authors: July 2008 April 2007
Below 6GHz 11vht PAR scope and purpose discussion
Some propositions to progress towards the PAR definition
TGax Functional Requirement Discussion
High-efficiency WLAN Straw poll
TGax Functional Requirement Discussion
Raising the PAR Date: Authors: January 2014 January 2014
doc.: IEEE yy/xxxxr0 Date:
doc.: IEEE yy/xxxxr0 Date:
High-efficiency WLAN Straw poll
Impact of Installation Costs on EHT PAR and CSD
VHT60 Tutorial Date: Authors: July 2008 April 2007
Functional Requirements for EHT Specification Framework
Proposed Modifications to VHT60 PAR
Proposal for HT PAR Title, Scope and Purpose
Proposed text for HTSG draft PAR and 5 Criteria
Proposed text for HTSG draft PAR and 5 Criteria
Backward Compatibility Feature for aj
Impact of Installation Costs on EHT PAR and CSD
High-efficiency WLAN Straw poll
Below 6GHz 11vht PAR scope and purpose discussion
High-efficiency WLAN Straw poll
Efficient Frequency Spectrum Utilization
TGbd agreed terminology and requirements
Submission Title: [VHT liaison report] Date Submitted: [15 May 2008]
Proposed Modifications to VHT60 PAR
Proposed Modifications to VHT60 PAR
Input on WUR PAR Scope Date: Authors: July 2016
Some propositions to progress towards the PAR definition
Proposed Modifications to VHT60 PAR
WiGig technologies IEEE ad/ay
High-efficiency WLAN Straw poll
doc.: IEEE yy/xxxxr0 Date:
Below 6GHz 11vht PAR scope and purpose discussion
Functional Requirements for EHT Specification Framework
Response to Official Comments
Proposed basis for PAR discussion
Indicating NGV Capabilities in MAC Header
doc.: IEEE yy/xxxxr0 Date:
Presentation transcript:

Raising the PAR Date: 2014-01-22 Authors: January 2014 January 2014 doc.: IEEE 802.11-yy/xxxxr0 January 2014 Raising the PAR Date: 2014-01-22 Authors: Matthew Fischer, Broadcom, et al Matthew Fischer, Broadcom, et al

January 2014 doc.: IEEE 802.11-yy/xxxxr0 January 2014 Abstract Change the goal of HEW to a more interesting 4x throughput increase instead of the current 2x. Matthew Fischer, Broadcom, et al Matthew Fischer, Broadcom, et al

Existing PAR Language 5.2.b. Scope of the project: January 2014 Existing PAR Language 5.2.b. Scope of the project: This amendment defines standardized modifications to both the 802.11 physical layers (PHY) and the 802.11 Medium Access Control Layer (MAC) that enable modes of operation capable of supporting at least two (2) times improvement in the average throughput per station (measured at the MAC data service access point) in dense indoor and outdoor deployment scenarios, while maintaining or improving the power efficiency per station. The new amendment defines operations in frequency bands between 1 GHz and 6 GHz. The new amendment shall enable backward compatability and coexistence with legacy IEEE 802.11 devices operating in the same band. Matthew Fischer, Broadcom, et al

Proposed change to PAR 5.2b January 2014 Proposed change to PAR 5.2b 5.2.b. Scope of the project: This amendment defines standardized modifications to both the 802.11 physical layers (PHY) and the 802.11 Medium Access Control Layer (MAC) that enable at least one mode of operation capable of supporting at least four times improvement in the average throughput per station (measured at the MAC data service access point) in a dense deployment scenario, while maintaining or improving the power efficiency per station. The new amendment defines operations in frequency bands between 1 GHz and 6 GHz. The new amendment shall enable backward compatibility and coexistence with legacy IEEE 802.11 devices operating in the same band. Matthew Fischer, Broadcom, et al

January 2014 Straw Poll Do you agree to change the language of section 5.2b of the HEW PAR as is shown on slide 4? Y 104 N 7 A 9 Matthew Fischer, Broadcom, et. al

January 2014 Straw Poll Do you agree to change the language of section 5.2b of the HEW PAR as is shown on slide 4, with “in a dense deployment scenario” replaced by “in a scenario representative of a dense indoor or dense outdoor deployment”? Y 29 N 17 A 71 Matthew Fischer, Broadcom, et. al

January 2014 Straw Poll Do you agree to somehow include the words “indoor” and “outdoor” in 5.2b? Y 45 N 26 A 36 Matthew Fischer, Broadcom, et. al

References 11-13-1410-06-0hew-802-11-hew-draft-par-and-5c January 2014 Matthew Fischer, Broadcom, et al