Joint FAA/Eurocontrol Future Communications Study (FCS)

Slides:



Advertisements
Similar presentations
EUROCAE WG 73: UAS integration Elements for the European Commission UAS panel Presentation at Workshop 2 UAS insertion into airspace Gérard Mardiné (SAFRAN-Sagem)
Advertisements

The Future Air Traffic Control System Presented by: Geoffrey BaileyKors van den BoogaardDon Willis EurocontrolInternational Air Transport AssociationU.S.
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
SESAR position on ATM Communication Technologies and future trends Kors VAN DEN BOOGAARD, SESAR CIT Hanspeter KULHEN, SESAR Task 2.5 R - EADS Astrium Cedric.
1 Glenn Research Center ICAO ACP Working Group M Iridium Sub Group Overview Bob Kerczewski Mike Meza NASA Glenn Research Center Iridium AGC-FG and NexSAT-SG.
1 Multi-Function Multi-mode Digital Avionics (MMDA) NASA Glenn Research Center – End of FY05 Status Presented to ICAO ACP WGC-11 GRC/James Budinger September.
Joint FAA/Eurocontrol Future Communications Study (FCS)
Feb 2004ICAO ACP WGF,1 WRC 2007 agenda item 1.6 Work plan for Additional aviation spectrum allocation for AM®S Presented by C. Pelmoine, EUROCONTROL.
ICAO was created in 1944 to promote the safe and orderly development of civil aviation in the world. A specialized agency of the United Nations, it sets.
SATELLITE DATA LINK SYSTEM (SDLS)
A I R T R A F F I C O R G A N I Z A T I O N Future Communications Study Technology Assessment Team: Suggested Phase III Activities Presented at ICAO ACP.
Slide 1 NEWSKY – NEtWorking the SKY for aeronautical communications Michael Schnell, Sandro Scalise German Aerospace Center (DLR) Institute of Communications.
NEXCOM Next Generation Air/Ground Communications Briefing Presented to AMCP Working Group M Montreal, Canada December 16, 2002 James T. Eck Air/Ground.
NEXCOM Next Generation Air/Ground Communications AEEC General Session December 2001 Jim Eck Air/Ground Communications Product Team Lead.
Phillipe Renaud and Nikos Fistas
Communication Domain Future Aeronautical Communications
NexSAT SG#7 9 th March 2006 Future Communications Infrastructure Jacky Pouzet Communication Domain manager European Organisation for the Safety of Air.
1 © TriaGnoSys GmbH - All rights reserved The Role of Satellites and Passenger Communications for Future Air Traffic Management Markus Werner TriaGnoSys.
Future Communications Roadmap
ANASTASIA Presentation to the NexSat Steering Group 6th meeting Jean-Yves CATROS EUROCONTROL Brussels 2005 May, 31.
Service Technique de la Navigation Aérienne NexSAT: Mission Hypothesis 20 may, 2003 STNA/31 ATM issues at horizon 2015 over ECAC Capacity: - VHF spectrum.
NexSAT NexSAT Steering Group Meeting - 8 June 2004 © 2004 European Organisation for the Safety of Air Navigation (EUROCONTROL) 1 Welcome to the 4th meeting.
Presented by United Arab Emirates MID ATM ENHANCEMENT PROGRAM (MAEP) TECHNICAL PROPOSAL.
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
EN 3 29/04/2015 © Astrium 1 The future role of satcom in civil aviation ATN 2002, London, September 25th, 2002.
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
Next Generation Air/Ground Communications (NEXCOM) Presented to ATN 2002 London, England 25 September 2002 James H. Williams Communications Integrated.
Presented to: SBAS Technical Interoperability Working Group Date: 21 June 2005 Federal Aviation Administration Certification of the Wide Area Augmentation.
3rd ASAS TN Workshop 19 April – 21 April rd ASAS TN Workshop Session 4: Strategy and Implementation Package I Requirements Focus Group (“Rapid.
Projects EMERALD and EMERTA EMERALD WP5 The Specific case of ASAS/ADS-B.
NASA ARAC Meeting Update on Next Generation Air Transportation System May 3, 2005 Robert Pearce Deputy Director, Joint Planning & Development Office.
Next Generation Air Transportation System Presentation to the Commercial Space Transportation Advisory Committee (COMSTAC) May 26, 2005 Robert A. Pearce.
1 Conditions for Mandating Data Link Equipage Steve Zerkowitz - IATA.
Federal Aviation Administration Integrated Arrival/Departure Flow Service “ Big Airspace” Presented to: TFM Research Board Presented by: Cynthia Morris.
WORKING GROUP I (WG-I) AEEC IPS Update
Jim McEachern Senior Technology Consultant ATIS July 8, 2015.
Additional aviation spectrum allocation for AM®S
Technology Pre-Screening: Process and Evaluation
Workshop on preparations for ANConf/12 − ASBU methodology
ESA Iris Programme: status
AVIATION SYSTEM BLOCK UPGRADES (ASBU)
NEXCOM Next Generation Air/Ground Communications
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
SIP/2012/ASBU/Nairobi-WP/19
Presented by United Arab Emirates
Mini Global Demonstration
Architecture and institutional issues for AeroMACS
Concept of ADS-B via Satellite
International Civil Aviation Organization
Regional Preparatory Workshop for the ITU WRC-2015
NEXCOM Next Generation Air/Ground Communications Appendix G
Aeronautical Communications Global Needs Global Solutions
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART I
Presented at ICAO ACP WG-I By Robin Hughes
Establishment of Space Weather Information Service
International Civil Aviation Organization
ANConf/12 – Agenda H. Sudarshan
Future Communications Infrastructure – An update
NEXCOM by Bruce Eckstein FAA.
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
NEXCOM Next Generation Air/Ground Communications Briefing Presented to
DATA LINK IMPLEMENTATION IN EUROPE
Communications Operating Concept & Requirements (COCR)
SPECTRUM STRATEGY & VISION
P AIRPORT SURFACE DATALINK
Soren Dissing - EUROCONTROL
ICAO ACP Working Group M Iridium Sub Group Overview
A Concept for Launch and Reentry Collaborative Decision Making (CDM)
Presentation transcript:

Joint FAA/Eurocontrol Future Communications Study (FCS) ‘One Sky for Europe’ EUROCONTROL A I R T R A F F I C O R G A N I Z A T I O N ato Joint FAA/Eurocontrol Future Communications Study (FCS) Brent Phillips Federal Aviation Administration Philippe Renaud Eurocontrol Phone: 202-385-7188; E-mail: brent.phillips@faa.gov F E D E R A L A V I A T I O N A D M I N I S T R A T I O N • A I R T R A F F I C O R G A N I Z A T I O N

Agenda Study Objective Background motivation for Future Communications Study (FCS) Study Organizational Structure and Scope Schedule

FCS Objective Objective: This Study is a coordinated effort between the FAA/NASA and Eurocontrol to progress the identification of a Future Globally Interoperable Communications System to support Air Traffic Management Operations in the time frame of 2020 and beyond.

FCS Background Aeronautical air-to-ground voice and data communications capacity for Air Traffic Management (ATM) is reaching saturation Most severe in Europe and parts of the United States 8.33 kHz channel spacing in Europe 25 kHz channel spacing in the US Various proposals to address this problem have been offered and approved independently; none has achieved global endorsement ICAO is seeking a common, global solution through the Aeronautical Communications Panel (ACP) The FAA and Eurocontrol have started a bi-lateral study of the problem with the support of NASA; study to provide major input to ICAO ACP

FCS Background (cont’d) AMCP/5 (April 1995) Recommendation 4/2 Future Operational and System Concept Exploration: Explore the likely airspace user needs and the long term system requirements for aeronautical VHF systems in light of ATM operational concept for beyond 2010. AMCP/7 (March 2000) (Task CNS-9102) Carry out the fact-finding and conduct the necessary studies for the development of datalinks for air traffic services and aeronautical operational Control AMCP WG-C1(Oct 2000) Action WGC/1-9: WG-C to develop a report with the objective to recommend a scenario in which a common global interoperable communication infrastructure could be ensured for the future. ANC/11 (Oct 2003) Recommendation 7/3: In view of anticipated saturation of the VHF band for voice communication, consider transition to spectrally more efficient ICAO systems, and/or make increased use of data communications and investigate multi-mode avionics as a transitional method of achieving interoperability of air/ground communications, where global harmonization has not been achieved. Recommendation 7/4: Investigate new terrestrial and satellite-based technologies, on the basis of their potential for ICAO standardization for aeronautical mobile communications use, taking into account the safety-critical standards of aviation and the associated cost issues. FAA/Eurocontrol Meeting (Oct 2003) Agreement to undertake a study to investigate future communications needs and technologies.

US FAA/EUROCONTROL FCS Organizational Structure Future Communications Study Steering Group (Co-Chair- James Eck/FAA) (Co-Chair – Mel Rees/Eurocontrol) Study Direction Management Coordination Study Team Leads (Brent Phillips/FAA) (Philippe Renaud/ Eurocontrol) Resource Planning Team Tasking & coordination International Coordination Technology Assessment NASA Glenn Research Center (Jim Budinger/NASA) (Philippe Renaud/Eurocontrol) Operational Concepts & Requirements (G. Anderson/FAA) (Danny Van Roosbroek/Eurocontrol) Operational Environment Description & Transition Analysis (Rhonda Thomas/FAA) Candidate Technologies Technology Feasibility/Maturity System Modeling/Simulation Prototype/Test Data/Voice Ops Concepts Functional Analysis Voice Usage Projection Data Throughput analysis Human Factors System Architecture Safety/Certification Security Spectrum Airborne Co-site Ground System Integration Cost/Benefits Considerations ITT/QQ Support

The Scope of FCS is ATS Communications* Cockpit Cabin ATS AOC AAC APC “Aircomms” Legend ATS - Air Traffic Services AOC - Airline Operational Comm’s AAC - Airline Administrative Comm’s APC - Airline Passenger Comm’s Lower message size/data volume narrow-band broadband Lower transmission delay realtime “near-realtime” n./a. Increasing integrity safety related non-safety related Increasing confidentiality all airlines airline internal Increasing public responsibility public private Higher service cost niche market mass market Increasing likelihood of service strong need market success questionable “ATM comms” “APC comms” *However, the ability of the system to support AOC etc. is a positive collateral benefit in that it addresses the needs of an important stakeholder and supports advanced information sharing (SWIM) Figure from: The future role of satcom in civil aviation – ATN2002 - Astrium

Technology Assessment Tasks (NASA Approach) Key Issues, Needs, Performance Characteristics & Spectrum Availability 1.1 Documentation Review for Baseline Concepts, Issues, Needs, and Performance Characteristics Government Review and Selection Technology Identification and Recommendations Gov’t Review, Criteria Weighting, and Selection Screening Criteria Down Selected Technologies Spectrum Assessment & Issues Report Briefing Briefing Candidate Analytic Assessment and Development of Requirements for Further Analysis 1.2 Spectrum Review Technology Pre-Screening Recommendations Report/ Briefing

Elements of the Candidate Technology Pre-Screening RTCA Eurocontrol FAA ICAO Consensus Documentation Avionics Service Provider Airlines Spectrum Captured Infrastructure (Current/Planned) Identified Needs ITU – Spectrum ICAO/RTCA FAA AEEC Captured Organizational Process Flow and Schedule Commercial Implementations Demonstrations Prototypes Standards Meets Needs? Captured Technology Status Costs/Impacts Technology Maturity Safety Evaluation Criteria Chosen for Further Study with Associated Roadmap Input Candidate Technologies Captured from ACP and other sources Output Candidate Technologies Evaluation

Study Schedule Task Name 2004 2005 2006 J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D Initial Comm Operating Concept and Rqmts Parse Comm Rqmts (and Environment description) from ICAO & RTCA ATS CONOPS Establish Initial Operational Concept, Services, Environment and Requirements Deliver Initial Comm Operating Concept and Rqmts Finalize Comm Operating Concept and Requirements Technology Assessment Technology Pre-Screening Initial Technology Downselect Detailed Alternatives Investigation and Downselect Technology Simulation Define Communications Roadmap (Transition) Deliver Communications Study Report 5/04 12/04 5/04 7/04 7/04 12/04 12/04 12/04 12/04 8/05 11/06 5/04 6/04 11/04 11/04 3/05 1/05 3/06 11/06 11/05 9/06 3/06 12/06 11/06

Timeline Towards GACS 2020 Decision on technology WRC 2007 requirements / papers Initiation of standards Validation of standards Adoption of standards 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 - 25 Complete detailed investigation / simulation Full Implementation Pre-screening results reviewed and approved Initial Implementation Global A/G Communications System (GACS Timeline) * * Adopted from ACP WGC7/WP23, Kors van den Boogaaard (IATA)