Expert Advisory Forum on priority substances

Slides:



Advertisements
Similar presentations
EU FORMAL REGULATION – TYPES OF STANDARDS ENVIRONMENTAL QUALITY OBJECTIVES ENVIRONMENTAL QUALITY STANDARDS.
Advertisements

EU FORMAL REGULATION – TYPES of STANDARD MINIMUM EMISSION STANDARD (sometimes known as LIMIT VALUES) UNIFORM EMISSION STANDARD.
The Industrial Emissions Directive (IED) 2010/75/EU
Industrial Pollution Control and Risk Management: IPPC Neil Emmott Environment Directorate-General 7 April 2006.
1 Towards an improved policy on industrial emissions - Impacts on the waste management industry - Marianne Wenning European Commission, DG ENV.C.4 FEAD.
Authorities role in the assessment of energy efficiency Marianne Lindström, Conference on Energy Efficiency in IPPC Installations, Vienna
The European IPPC Bureau Institute for Prospective Technological Studies (IPTS) Seville, Spain Internet E.mail : Don.
1 The Industrial Emissions Directive (IED) Environmental inspections Filip François DG ENV.C.3 - Industrial Emissions team Joint European Commission –
An overview of the industrial emissions Directive Richard Vincent Head of Industrial Pollution Control Department for Environment, Food and Rural Affairs.
European Commission - Environment Directorate-General 8 June 2004 Trends and experience so far in implementing the IPPC Directive.
The Sevilla process for supporting the implementation of the IPPC Directive Michael Parth Tallinn – Estonia 27 – 28 March 2008.
Current state on Harmonisation and Implementation/Enforcement of Environmental Legislation - Industrial Pollution Control in SLOVENIA Barbara Bernard Ministry.
IPPC Directive state of play and future developements
The IPPC Directive and its implementation Alexandre Paquot European Commission Environment Directorate-General Phare Capacity.
Ministry of Waters and Environmental Protection, ROMANIA 1 BERCEN 1 st Exchange program – November 2002 Croatia PROBLEMS AND SOLUTIONS IN COOPERATION.
The Industrial Emissions Directive (IED) 2010/75/EU Gabriella Gerzsenyi & Menno Verheij European Commission, DG Environment Industrial Emissions Unit 03.
AйПиПиСи ?? IPPC implementation - experience from new EU member countries & changes brought by Industrial Emissions Directive Monika Přibylová Kiev, 10.
The European IPPC Bureau Institute for Prospective Technological Studies (IPTS) Seville, Spain Internet E.mail : Don.
Recommendation 2001/331/EC: Review and relation to sectoral inspection requirements Miroslav Angelov European Commission DG Environment, Unit A 1 Enforcement,
IPPC vs Emissions Trading Lesley James Friends of the Earth (England, Wales & N.Ireland) and the European Environmental Bureau.
1 Review of the Integrated Pollution Prevention and Control (IPPC) and National Emission Ceilings (NEC) Directives Marianne Wenning DG ENV, Head of Unit,
3rd BERCEN Exchange Programme, Prague WASTE CONDITIONS IN ENVIRONMENTAL PERMITS Mrs. Marianne Lindström, Finnish Environmental Institute,
The legal background for implementing the IPPC, EPER, and PRTR Protocol Requirements Orsolya Adamovics Department for Conservation of Environment Ministry.
REVISION OF THE IPPC DIRECTIVE  DIRECTIVE ON INDUSTRIAL EMISSIONS.
Iuliana CHIDU European integration counsellor Ministry of Environment and Water Management Prague - CZECH REPUBLIC April 2005 DIRECTIVE 96/61/EC.
CROATIA Country Report IPPC Directive: implementation, problems, constraints, open questions,… Anita Pokrovac Patekar, B. Sc. Pharm. Ministry of Environmental.
The current legal situation
1 Review of the IPPC Directive and related legislation Second Meeting Of Working Group E On Priority Substances 17 October 2007 Filip FRANCOIS – DG ENV.
Creating the environment for business Assessment of the Implementation by the Member States of the IPPC Directive Advisory Group Meeting Friday 13 th January.
1 Overview of the Proposal for a Directive on industrial emissions (IPPC) Keir McAndrew - European Commission, DG ENV.C.4 - Industrial Emissions, ozone.
Health and Food Safety EU strategy for Pharmaceuticals in the Environment Patrizia Tosetti DG SANTE European Commission China/EU Pharmaceutical Industry.
Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 1 The IPPC Directive Introduction to the philosophy Rob Kramers.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment Bilateral screening:
Introduction to the philosophy
BAT - BREF Their scope Rob Kramers Senior advisor InfoMil.
First position of the Belgian industry about the
Content of the presentation
EU Water Framework Directive
Update on “IPPC implementation” and “Competitiveness” studies
WFD update September 2009 Andrea NÁM
The IED: Industrial Emissions Directive DG ENV. C
Aleksandra Antonowicz Green Federation GAJA/CCB
DG Environment, Unit D.2 Marine Environment and Water Industry
on Priority Substances Strategic Coordination Group
1. Implementation of the Water Framework Directive: notifications & infringements, RBMP assessments for the agricultural sector Expert Group on WFD & agriculture.
EU Water Framework Directive
Marine Strategy Framework Directive: Transposition and Implementation
Report on the application of the POP Regulation
IPPC Review Stakeholder Hearing
Marine Strategy Framework Directive: Transposition and Implementation
DG Environment, Unit D.2 Marine Environment and Water Industry
Analysis of the reports submitted by Member States on the implementation of Directive 2008/1/EC, Directive 2000/76/EC, Directive 1999/13/EC and further.
Agenda item 1 – Transposition and implementation of WFD
Reduction of total releases from unintentional production of POPs
Legal and implementation issues update
Water Framework Directive 2000/60/EC
Meeting of Water Directors State of transposition and implementation
Towards an improved policy on industrial emissions Third Meeting Of Working Group E On Priority Substances 3 March 2008.
Common Implementation Strategy for the Water Framework Directive
Other EU Water Directives
Introduction to the first meeting of the IPPC Review Advisory Group
Overview of the implementation of the SEA directive
DG ENV C3 Industrial Emissions, Air Quality and Noise 20 January 2012
DG Environment, Unit D.2 Marine Environment and Water Industry
DG Environment, Unit D.2 Marine Environment and Water Industry
Transposition and implementation of WFD
DG Environment, Unit D.2 Marine Environment and Water Industry
IPPC Review Stakeholder Hearing 4 May 2007
Industrial Emissions Directive Targeted stakeholder survey
WFD CIS Working Group Meeting Brussels, 4/4/2019
Presentation transcript:

Expert Advisory Forum on priority substances IPPC implementation challenges and EU review process DG ENV.C4, Alexandre Paquot 2 October 2006

EU Legislation on Industrial Emissions Integrated Pollution Prevention and Control (IPPC) Directive Solvents Directive Waste Incineration Directive (WI) Large Combustion Plants Directive (LCP) European Pollutant Emission Register (EPER) European Pollutant Release and Transfer Register (E-PRTR)

Key provisions of the IPPC Directive (96/61/EC) Integrated permitting to ensure high level of environmental protection as a whole Priority to prevention and, if not practical, emissions control Permit conditions based on Best Available Techniques (BAT) taking into account local conditions BAT Reference Documents (BREFs) based on information exchange with MS and stakeholders October 2007 : deadline for full implementation for existing installations

2005 IPPC Implementation Report - Key findings Delays and shortcomings in transposition (still 5 ongoing infringement procedures for non-conformity) Permitting regimes in place in all MS – important changes and efforts in a number of MS compared to pre-IPPC regimes Limited progress in the implementation of the Directive and need to accelerate process in view of Oct 2007 deadline => IPPC IMPLEMENTATION ACTION PLAN

IPPC Implementation Action Plan 1. Full transposition 2. Monitoring progress 2007 5. Guidance 3.Implementation assessment 4. Finalisation BREFs

Monitor implementation and progress towards 2007 Formal information request to MS on number of permits issued Visit to MS to discuss informally and support efforts in implementation ( 7 MS visited – 4 more to come in 2006) “Study on IPPC Implementation” (gain practical understanding through assessment of 30 specific installations) Study on “Impacts of IPPC implementation on competitiveness” (domestic glass, electric steel making) Identification of main emitters through EPER – follow-up analysis to be carried out based on 2nd EPER reporting 2nd MS implementation reports (Sept 2006)

IPPC permitting progress NUMBER OF INSTALLATIONS/ PERMITS PER MS Main analysis of this diagram: Situation far from being satisfactory (1 years before deadline) - Difficulties to get the information from MS (a number do not have a system in place to monitor the progress made – complexisty of certain situations eg 50 CA in Italy ; difficulties in federal states) – 7 MS have not yet responded to the request - in total about 40% of installations have a permit 3 groups of MS 1/ group more advanced (above 40%) DE: 80% ; FI, Baltic countries, BE, IE, LU (already permits in place) 2/ a group of MS which has still a lot of work but there is a clear strategy (phased approach for permit applications, reconsider existing permits) Ex: UK (30%), HU (25%), FR (35%) 3/ a group of MS is clearly lagging behind and do not really have in place the strategy to cope with the 2007 deadline: ex: Spain:13%; Portugal: 14%; Italy no data but very difficult; Greece; Slovenia 0; Poland 10%;; SK: 20%; Data based on information submitted by June 2006 - No data had not been received from AT, CZ, DK, IT, MT, NL and SE

Current main implementation concerns October 2007: most MS are likely to be late Lack of resources for implementation in a number of MS Large variations in permit conditions, impact on competitiveness? BREFs sufficiently taken into account ? Level of enforcement ? Unclear procedures on review of permits in most MS

Next steps To continue assessment of specific installations (study in 2007 and after) To assess the use of general binding rules (study in 2007) To analyse 2nd MS implementation reports and set up a database on MS implementation To use experience with a view to improving IPPC implementation (use of BREFs, reporting and monitoring, review permits…)

IPPC Review - Why? IPPC Review Better regulation - Simplification Experience with IPPC implementation Thematic strategies (air, waste, soil) IPPC Review

Why a Review? Natural part of effective policy cycle 2003 Communication: Positive reaction on the IPPC Directive from MS and other stakeholders General call for regulatory stability But room for improvement: coverage, interpretation, legislative interactions Some call for additional scope for emission trading 2005 Communication: Commitment for a Review

IPPC Review Core Objectives An ambitious review while not altering the fundamental principles, objectives and ambition of the present Directive (high level of environmental protection, integrated approach, BAT, permitting …)

Main on-going studies to prepare IPPC review Competitiveness Implementation Review process Beyond Compliance Impacts of technical Amendments Streamlining

Interface WFD - IPPC Environmental objectives of WFD (Art 22.4) shall be regarded as EQS for the IPPC Directive (in particular in view of Art 10 IPPC – go beyond BAT) Proposed Directive on PS: review of IPPC permits to be carried out “with a view to progressively reducing the extent of each transition area of exceedence” Communication: introduce through IPPC review an explicit reference to PS in permitting procedure

Next steps interface WFD - IPPC On-going study on streamlining interactions IPPC with other legislation Assess possible options to clarify interface between IPPC and FWD Take account PS in permitting process Review of permits Refer to list of PS in Annex III of IPPCD Take better account of PS in context of review of BREFs

IPPC Review consultation IPPC Advisory Group (input studies) IPPC Advisory Group IMPEL (enforcement) IPPC Experts Group (policy orientation) Stakeholder Hearing 2007 (public debate)

Possible Outputs, Timing? Conclusion of review in 2007 with long-term vision on industrial emissions control Legislative proposal if appropriate, based on an impact assessment, unlikely to come into effect until ~ 2012 at earliest No change in short term, 2007 deadline unaffected!