IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.

Slides:



Advertisements
Similar presentations
2 Session Objectives Increase participant understanding of effective financial monitoring based upon risk assessments of sub-grantees Increase participant.
Advertisements

ASTM International Officers Training Workshop September 2012 Pat Picariello, Director, Developmental Operations 1 Strategic Planning & New Activity Development.
0 - 0.
Addition Facts
ZMQS ZMQS
Effectively applying ISO9001:2000 clauses 6 and 7.
Addition 1’s to 20.
Test B, 100 Subtraction Facts
1 Unit 1 Kinematics Chapter 1 Day
SLG Goals, Summative Evaluations, and Assessment Guidance Training LCSD#7 10/10/14.
BI Outlook for BI Day 2012 Based on latest (last Monday) feedback from EN/EL XXX As foreseen originally Partially ‘As foreseen originally‘ Postponed.
SPS New Wire Scanner Mechanics Review
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
Matching and Synchrotron Light Diagnostics F.Roncarolo, E.Bravin, S.Burger, A.Goldblatt, G.Trad.
Injection test1 Injection test in 2006 The installation schedule version 1.7 recently approved includes a ‘possible injection test’ - foreseen in April.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
B.O.S.S. SPS ring and transfer lines Serge Massot for BE-OP-SPS European Organisation for Nuclear Research CERN CH-1211 Genève 23 Switzerland 27/05/2014CERN.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
SPS re-commissioning with beam K. Cornelis PS-SPS days.
STATUS OF THE LHC INJECTORS UPGRADE (“LIU”) PROJECT R. Garoby for the LIU Project Team March 6, 2012CERN.
ATC / ABOC Days 23 Jan LHC injector Chain, E.A., Facilities. MTTR, spare parts and stand-by policy for BI equipments J.Tan AB/BI on behalf of BI.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
Based on Lars’ progress report of LIU SPS BI Status of follow-up 13/10/2015Lars K. Jensen, V. Kain1.
Next Steps, Priorities, Strategy for Spares Ray Veness.
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
BI Activities for LS2 Ray Veness for BE-BI.
East Area BTV upgrade 2015_09_03 S.Burger BE-BI-PM V.Clerc EN-MEF-SI I.Francescut BE-BI-ML V.deJesus EN-MEF-SI M.Lazzaroni EN-MEF-EBE … F61 line.
Overview Consolidation projects for PS LIU-PS Main observable review Conclusion Acknowledgements S. Gilardoni R. Steerenberg G. Metral H. Damerau BI colleagues.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Instrumentation and Tools for LIU and HL-LHC B. Mikulec with the invaluable input from many colleagues from ABP, OP, RF and BI HL-LHC/LIU Day 15 th of.
News and hot topics Impedance meeting 14/04/2014.
Proposal for a Global Network for Beam Instrumentation [BIGNET] BI Group Meeting – 08/06/2012 J-J Gras CERN-BE-BI.
Post Mortem Workshop Session 4 Data Providers, Volume and Type of Analysis Beam Instrumentation Stéphane Bart Pedersen January 2007.
LHC Injectors Upgrade Project 1/12/2010 R. Garoby.
IEFC Workshop 2011 Session 2: “MTE and High Intensity Operation” Short summary/Follow-up items V.Mertens / T.Zickler Presentations: M.GiovannozziMTE Roadmap.
LIU-SPS action list for BE/BI L. Jensen with input from BL, PI, QP, PM 27/08/2015Lars K. Jensen BE/BI/SW1.
LIU-SPS progress for BE/BI L. Jensen on behalf of BE/BI 27/08/2015Lars K. Jensen BE/BI/SW1.
Challenges in Beam Instrumentation Rhodri Jones (BE/BI) LIU-2011 Event, 25 November 2011, CERN.
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
Beam Instrumentation during LS1 Ray Veness on behalf of the BE/BI group.
INJECTORS BLM SYSTEM: PROGRESS REPORT Christos Zamantzas on behalf of the BLM team. MSWG 28/08/2015.
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
LIU EL-FC ACTIVITIES Georgi Minchev Georgiev EN-EL-FC EDMS
Status of the BI Work Package in the LIU-PSB frame Jocelyn TAN, BE-BI Thanks to the contributions of the WU holders: J. Belleman, P. Odier, F. Roncarolo,
PS-LIU status S. Gilardoni – BE/ABP H. Damerau – BE/RF LIU-PT 27 Aug
LEIR re-commissioning and other operational aspects First ideas for new tools and organization First draft re-commisisoning plan H. Bartosik, A. Huschauer,
ESS Front End diagnostic
Requirements from BI and new instruments after LS1 LHC Optics Measurement and Correction Review; B.Dehning 1 Bernd Dehning CERN BE/BI
PS Complex Controls Renovation S Baird AB/ABP ATC/ABOC Days: Session Jan 2008.
LHC Injectors Upgrade Project 11/11/2010 R. Garoby.
BE-CO Activities for LIU-CPS and LIU-SPS
Brief Status SPS Prototype PSB Prototype Installed in LS1
EYETS David Hay EN-OSS.
East Hall under construction
LIU Wire Scanner Milestones June 2017
EC Activities Status for the LIU
BE-BI Software for LINAC4
AWAKE proposals for BE/BI
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Status of the BI Work Package in the LIU-PSB frame
WPs concerned by L4 connection:
LIU Wire Scanner Series Costs
Offline Analysis Framework STATUS
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
Proton Beam Diagnostics
450 GeV Initial Commissioning with Pilot Beam - Beam Instrumentation
ATS Consolidation Day 22nd May 2019 Beam Instrumentation
Status of the BI Work Package in the LIU-PSB frame
Presentation transcript:

IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1

Presentation Overview This presentation will give the status of the ongoing activities and discuss what has been identified as additional possibilities for upgrades on the different machines. n.b.: Despite the fact we are in the MTE session, this presentation will cover all our activities over the entire injector chain. I tried to highlight MTE related activity in yellow boxes. Foreword Our Activities per Type of Instrument A Word on SpecificationsConclusions 2

Foreword: Consolidation vs Upgrade BE-BI started a consolidation program for the beam instrumentation of the LHC injector chain several years ago. The target was to replace obsolete parts (mainly acquisition chain, including SW) with new up-to- date developments to ensure the availability of our systems in the coming years. These developments were not directly linked to performance issues or improvement requests but our secondary objective was of course to get the best performance with the remaining parts (i.e. the monitor itself). 3

Foreword: Consolidation vs Upgrade The recent MTE and now LIU projects add new requirements, which now will have to be taken into account. Some of these new requirements can be incorporated in our ongoing consolidations but some others will require significantly new developments and/or extensions. While most of our consolidation program is already funded by Simon over the coming years, these upgrades are not and they will have to be supported by the corresponding projects. 4

SEM, Wire Scanners, BLM, BCT, BPM, Tune and others 5

SEM SEM Grid acquisition chain consolidation is approved for PSB and PS under the existing consolidation project. It will be based on developments done for Linac4 and deployed for 2014 start-up. The Grids themselves are not part of this and will stay as they are. The resolution of these systems will remain as they are now. Any performance improvement requirement will have to be analysed in details and integrated into the plans. 6

Wire Scanners (1/2) The ongoing consolidation of the PSB and PS wire scanners aims to exploit as well as possible the existing mechanics with new acquisition chain. The current consolidation budget covers this. On PSB, new electronics and PM have already been installed. On PS, new electronics has been deployed, new PM is currently under test on one wire New large aperture tanks have been developed for MTE. One will be installed soon, hopefully next technical stop On SPS, the LHC type electronics (including 40 MHz acquisition) is currently tested on one wire and will be deployed on all wires next Christmas stop. 7

Wire Scanners (2/2) The production of a prototype for a new fast and more accurate wire scanner is also covered by our current consolidation budget. We will assess the performance we could reach with this laboratory prototype before the end of the year. The exact specifications and number of these to be installed in PSB, PS and SPS (& whether they replace the old ones) are still to be defined (and funded) as part of LIU. We could install one of these new scanners for assessment in one ring for the 2014 start-up 8

BEAM LOSS MONITORS The replacement of the PSB and PS BLM acquisition chain and detectors (in sync with Linac4 connection) is covered by the existing consolidation project with the initial assumptions that we keep the same locations and cables. But: Recent aging /radiation issues force us to review these assumptions and include the renewal of the cables. Extra fast monitors are now requested in several places For this, extra funding from LIU (and consolidation?) is requested The SPS BLM upgrade has still to be specified and funding from LIU should then also be granted. 9

BEAM Current Transformers The consolidation of the PSB and PS fast beam current transformers is covered by the existing consolidation project. The acquisition chain has already been renovated. The replacement of our toroids is currently under study with the aim to replace them during coming long shutdown. DCCT in PSB and PS will need new electronics to cope with the upgrade. This is not yet funded. SPS Fast and DC BCT monitors are being upgraded (for North Hall interlock) and are planned to be installed during the Christmas shutdown. 10

BEAM Orbit & Trajectories (1/2) PS Orbit and Trajectory system has just been renovated. The implementation of such a system on PSB has been studied and estimated (based on the existing monitors). We just wait for the green light and budget from LIU to start the project with 2014 start up as possible target. 11

BEAM Orbit & Trajectories (2/2) The TT2/TT10 BPM acquisition chain renovation (including MTE 5 turn requirement) is funded and in progress. Target: 2012 start up. The SPS MOPOS acquisition chain renovation is also funded and ongoing (based on the same monitors) with 2014 start up as target. New SPS MOPOS functional specifications are currently in preparation. Any extension (number of BPMs, dual-plane BPMs) would have to be integrated into LIU budget. 12

Tune & Chroma A new PU for tune measurement on low intensity beam in the PS is under study. We should have it installed for next start-up. On the SPS, the existing Head-Tail set up can survive up to the long shut-down with increased attenuator but long term availability requires a new PU to be designed and installed in This should be covered by LIU. 13

Other Goodies SPS Ionisation Profile Monitors We plan to renovate the optics and cameras of the existing SPS IPMs during Christmas shudown to assess their performance in 2012 If such a device is also needed in the PS, it should be specified and properly included into LIU. SPS Matching Monitor We should be able to evaluate during the second half of the year our new development on the LHC. If needed and adequate, this could then be duplicated into the SPS. SPS LDM We will assess during the year the feasibility of such an instrument based on SPS synchrotron light. 14

15

Upgrade & Functional Specifications It is important to agree that, while we could live with Do at Least as Well functional specifications for a consolidation, this is not possible for an upgrade. For an upgrade, we need clear, complete and agreed specifications in order to: Check if it can be covered by the existing consolidation program Properly estimate cost and planning Get what we need in the end. 16

17

Conclusions A lot of activities are already ongoing in the different machines. A large part of them are already funded by consolidation project but several extensions will have to be supported by the LIU project. What we need now is: a proper and agreed specification of the expected results based on your needs to achieve your targets and not only on what seems feasible from our side. to define together with OP and CO deployment strategies for the renovated systems critical for machine operation and safety. 18