Smart Grid Closing Report – November 2010

Slides:



Advertisements
Similar presentations
Doc.: IEEE r0 SubmissionBruce Kraemer, MarvellSlide 1 Smart Grid SC Closing Report– January 2012 Date: 19 January 2012 Discussion topics.
Advertisements

Doc.: IEEE r0 SubmissionSlide 1 Smart Grid SC– March 2012 Date: 15 March 2012 Discussion topics during March Waikoloa Session NameCompanyAddressPhone .
Doc.: IEEE /1542r0 Submission November 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid SC– November 2011 Date: 08 November 2011 Discussion topics.
Doc.: IEEE /0955r0 Submission July 2010 Bruce Kraemer, MarvellSlide 1 Smart Grid Technology Summer 2010 Plans Date: 2010-July-28 Abstract: Discussion.
Doc.: IEEE /0955r2 Submission August 2010 Bruce Kraemer, MarvellSlide 1 Smart Grid Technology Summer 2010 Plans Date: 2010-August-11 Abstract:
Doc.: IEEE /1340r0 Submission September 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid SC–Closing Report- September 2011 Date: 22 September 2011.
Doc.: IEEE /0028r1 Submission January 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid Update – January 2011 Date: 2011-January-10 Abstract: NIST.
Doc.: IEEE /0174r0 Submission January 2010 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Doc.: IEEE /0506r2 Submission Doc.: IEEE /720r0 May 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid ad hoc – May 2011 Date: 09 May 2011.
Doc.: IEEE /0775r0 Submission July 2009 Bruce Kraemer, MarvellSlide 1 TGn Closing Report - July 16 ‘09 Date: 2009-July-09 Authors: 5488 Marvell.
Doc.: IEEE /0943r3 Submission September 2010 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Supplementary Plenary Information - July 2010
Supplementary Plenary Information - November 2010
Smart Grid ad hoc – April 2011
P802.11s report to EC on request for approval to proceed to RevCom
Revision Process Summary
TGn Closing Report Jacksonville, FL, US 802 Plenary – May ‘08
IMT-Advanced Opening Report
Suggested Practice for SFD and Draft Spec Text Proposal
TGn Closing Report Waikoloa, HI, US 802 Plenary – 8-12 September ‘08
Smart Grid ad hoc – May – SGIP NIST PAP2 2 - EPRI FAN Name
doc.: IEEE <doc#>
P802.11z conditional approval report to ExCom
Supplementary Plenary Information - July 2010
P802.11z conditional approval report to ExCom
Smart Grid Summary input to PAP#2 Report – November 2010
TGn Closing Report Waikoloa, HI, US 802 Plenary – 8-12 September ‘08
IEEE Shop Contents Date: Authors: Name Company Address
Energy STAR ad hoc Closing Report - January 2010
doc.: IEEE <doc#>
July 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Liaison Report on for July 2016] Date.
Smart Grid ad hoc Closing Report – May 2011
TGn Closing Report Vancouver, BC, Canada 802 Plenary
Smart Grid Teleconferences – Jan-Mar 2011
<month year> doc.: IEEE ptc November 2012
Supplementary Plenary Information - September 2010
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
Smart Grid ad hoc Closing Report - March 2010
Smart Grid Activity Report 2010
Supplementary Plenary Information - May 2010
Smart Grid SC–Closing Report- September 2011
Smart Grid ad hoc Closing Report - May 2010
Supplementary Plenary Information - September 2010
Supplementary Plenary Information - September 2010
Smart Grid ad hoc – July – SGIP 2 - NIST PAP2 3- ITU Liaison
<month year> doc.: IEEE < e> <March 2019>
Supplementary Plenary Information - September 2009
Smart Grid Update – January 2011
Supplementary Plenary Information - March 2010
Smart Grid Summary input to PAP#2 Report – November 2010
Supplementary Plenary Information - May 2010
GEN ad hoc Summary - Sep 14 ‘07
TGn Closing Report Vancouver, BC, Canada 802 Plenary
TGn Closing Report Denver, CO, US 802 Plenary – July ‘08
TGn Draft Redline Notice
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
Smart Grid ad hoc Closing Report – January 2011
Supplementary Plenary Information - September 2009
Supplementary Plenary Information - March 2010
Smart Grid Closing Report – November 2010
TGn Closing Report – September 24 ‘09
Smart Grid ad hoc-Closing Report - July 2010
IMT-Advanced Closing Report
Plenary Information - September 2009
WBA Carrier Wi-Fi Liaison request - March 2014
<month year> doc.: IEEE < e> <March 2019>
<month year> doc.: IEEE < e> <July 2019>
January 2012 doc.: IEEE /0179r1 Jan 2012
<month year> doc.: IEEE < e> <March 2019>
<month year> doc.: IEEE < e> <July 2019>
Presentation transcript:

Smart Grid Closing Report – November 2010 doc.: IEEE 802.11-10/1385r1 November 2010 Smart Grid Closing Report – November 2010 Name Company Address Phone email Bruce Kraemer Marvell 5488 Marvell Lane, Santa Clara, CA, 95054 +1-321-751-3988 bkraemer@marvell.com Jorjeta Jetcheva Itron Date: 2010-November-10 Abstract: NIST PAP#2 Report r6 recommended changes Other Smart Grid activities Bruce Kraemer, Marvell Bruce Kraemer (Marvell)

Agenda Topics for the Week November 2010 Agenda Topics for the Week Action Item Finalize change suggestions for the NIST PAP#2 Report Information Items SGIP update ITU Focus Group UK Consultation March 2011 Tutorial topics/speakers Bruce Kraemer, Marvell

re-confirmed Nov 4 NIST Timeline November 2010 Draft 0.5 July 28, 2010 doc.: IEEE 802.11-10/1385r1 November 2010 NIST Timeline re-confirmed Nov 4 Draft 0.5 July 28, 2010 Call for Input to Section 6 August 4, 2010 End of draft 0.5 review period September 15, 2010 SGIP face-to-face, St Louis Tentative PAP 2 meeting September 16, 2010 September 30, 2010 Release of draft 0.6 October 29, 2010 End of draft 0.6 review period November 4, 2010 OpenSG meeting, Miami Tentative PAP 2 meeting December 3, 2010 SGIP face-to-face, Chicago PAP 2 meeting Release of Version 1 Bruce Kraemer, Marvell Bruce Kraemer (Marvell)

Changes primarily to Section 4 text on wireless technology November 2010 doc.: IEEE 802.11-10/1385r1 November 2010 IEEE 802 contributed a number of suggestions on how to change the NIST PAP#2 Report r6. These were contained in documents 1210 and 1209. https://mentor.ieee.org/802.11/dcn/10/11-10-1209-00-0000-comment-set-1-on-pap-2-report-r6.doc https://mentor.ieee.org/802.11/dcn/10/11-10-1210-01-0000-comment-set-2-on-pap-2-report-r6.ppt https://mentor.ieee.org/802.11/dcn/10/11-10-1316-03-0000-smart-grid-ad-hoc-november-2010.ppt Changes primarily to Section 4 text on wireless technology Added definitions Added rows to matrix and additional notes We discovered we needed to create a mesh definition because we could not find one. Bruce Kraemer, Marvell Bruce Kraemer (Marvell)

Conclusion Material will be cleaned up and submitted to NIST asap. November 2010 Conclusion Material will be cleaned up and submitted to NIST asap. Bruce Kraemer, Marvell