UNC 0621L: Amendments to Gas Transmission Charging Regime

Slides:



Advertisements
Similar presentations
Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
Advertisements

UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Proposer: Matthew Hatch Panel Date: 15 th May : EU Capacity Regulations – Capacity Allocation Mechanisms with Congestion Management Procedures.
Code Governance Review UNC Modification Proposals Chris Shanley - National Grid NTS.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Overview Gemini 2008 Release (Summer). Gemini Release 2008 (Summer) In response to a request from National Grid Transmission a number of changes have.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
Proposer: Mark Jones, SSE Panel Date: 20 th February : Mod Title: Amendment to AQ Values Present within Annex A of the CSEP NExA AQ Table Following.
Proposer: Hayley Burden Panel Date: 17th April : Mod Title: Imbalance Charge amendments required to align the UNC with the Network Code on Gas.
Force Majeure - Capacity Transmission Workstream 2 July 2009.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Mod Clarifications Transmission Workstream 6 August 2009.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
Proposed DN Pensions Deficit Charge Transmission Workstream 2 November 2006.
Assignment of NTS Entry Capacity Transmission Workstream 02 July 2009.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Industry Dialogue on xoserve Services 14 th September 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 376: Increased Choice when Applying for Enduring NTS Exit Capacity Jeff Chandler - 5 th May 2011 Transmission Workgroup - Elexon 1.
Customer Charge On behalf of all DNs 19 November 2010.
Proposer: Matthew Hatch Panel Date: 20/10/16
Consideration of issues raised by UNC Modification Proposal 0244
Capacity Conversion – 616s
Modification Proposal 0283 Update
Code Governance Review UNC Modification Proposals
Transmission Workgroup 4th October 2012
Introduction of Code Contingency Guidelines Document
Mod 0621 Amendments to Gas Transmission Charging Regime
Proposer: BP Gas Marketing Ltd Panel Date: 17 April 2014
Proposer: National Grid NTS Panel Date: 17th April 2014
NTS Entry Charging Review Update
Modification th July 2008.
Danishtah Parker 0621 Workgroup 26 April 2018
COR1072 Enduring Transfer and Trade Arrangements
PARCA Security and Termination Amounts
Mod 621A Supporting analysis
Consideration of issues raised by UNC Modification Proposal 0244
Transmission Workgroup June 7th 2012
Impacts of Project Nexus Implementation Date to AQ17
Proposer: Malcolm Montgomery Panel Date: 20/10/16
Modification 0333A – implementation info
Rebecca Hailes For 15 March 2018
Proposer: Colette Baldwin – E.ON Panel Date: 21st August 2014
Joint Office Presentation for Modification 0678
QSEC auction timetable
Mod 0621 Amendments to Gas Transmission Charging Regime
UNC Modification Proposal 0385 Inclusion of DNOs as Users in User Pays Arrangements Phil Lucas 7 June 2011.
Introduction of Code Contingency Guidelines Document
Interruptible to Firm – NTS Supply Point Transition
Draft Mod: Update of default System Marginal Prices
Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.
Proposed Transitional Gas Exit Arrangements
UNC 0621L: Amendments to Gas Transmission Charging Regime
CDSP Service Document amendment - high-level activity description*
Richard Fairholme Transmission Workstream 4th September 2008
Consideration of issues raised by UNC Modification Proposal 0244
Options for the Development of a Demand Side Response Mechanism
Proposer: Debbie Brace Panel Date: 20th March 2014
Proposer: Colette Baldwin – E.ON Energy Solutions Ltd
Optimisation of Entry Capacity Modification Proposal
User Pays Principles and Governance
Information Provision for Transitional Exit Capacity
CAM: Next Steps UNC Transmission Workgroup Lisa Martin 9 January 2014.
Modification Proposal 136
Transmission Workstream 05 November 2009
Proposer: Steve Mulinganie, Gazprom Energy Panel Date: 20th June 2019
Xoserve Draft UIG Incentives Modifications 20 May 2019
Proposer: Tracey Saunders, Northern Gas Networks
Presentation transcript:

UNC 0621L: Amendments to Gas Transmission Charging Regime Proposer: Christiane Sykes, Shell Energy Europe Panel Date: 26 April 2018

Why change? (1) As presented by Energy UK at the 4 April 0621 Working Group, the treatment of Existing Contracts in the Reference Price Methodology raises a number of issues in relation to: Compliance with the TAR NC Furthering the relevant objectives and relevant charging objectives Shell Energy Europe has proposed this alternative modification to National Grid’s 0621 proposal to include existing contracts in the calculation of the FCC and the Reference Price Methodology to: Enable TAR NC compliance Better meet the Transporter’s Relevant Objectives are furthered

Why change? (2) Mod 621 and currently all variants take the existing contracts out before the model is run, which leads to relatively higher capacity charges for new capacity bookings. In the enduring period it is expected that the FCC value will be substantially lower than in the transition period when it is the obligated capacity level. This means that in the enduring period the FCC value minus existing bookings will result in less capacity to recover the allowed revenue from.

Why change? (3) This shows the rather extreme impact of excluding the existing contracts particularly in the enduring period, whilst accepting the impact will be less in the enduring period due to reduced levels of existing contracts and revenues associated with them this analysis does not include interim contracts. I suggest this issue requires further investigation to explore the appropriateness of this approach. Energy UK analysis shows the rather extreme impact of excluding the existing contracts particularly in the enduring period. Whilst accepting the impact will be less in the enduring period due to reduced levels of existing contracts and revenues associated with them. This analysis does not include interim contracts.

Options Proposed alternative modification to include historical contracts in the CWD calculation to prevent undue distortions between existing capacity holders and shippers purchasing new capacity. Alternatively, National Grid could amend their proposal. Should they do this, Shell Energy Europe would withdraw this proposal.

Solution Include historical contracts in the CWD calculation to prevent undue distortions between existing capacity holders and shippers purchasing new capacity. This issue has been raised on numerous occasions at the 0621 Working Group and analysis provided by Energy UK has demonstrated the distortion between existing capacity holders and parties purchasing capacity in the future.

Recommended Steps The Proposer recommends that this modification should be: Incorporated into the existing 0621 Workgroup so it can be considered alongside the other alternative modification proposals.