Exit Capacity Substitution and Revision

Slides:



Advertisements
Similar presentations
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Advertisements

UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
The Treatment of “Spare / Sterilised” Capacity – follow up Draft for discussion purposes only.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
15 January 2010 energynetworks.org 1 PRESENTED BY SIMON BROOKE Revised DCMF Terms of Reference Distribution Charging Methodology Forum.
Baseline Reconsultation Timeline Timeline (1) Aug SepOctNov Dec 14/8 Workshop 1: History & Timeline 17/8 Workshop 2: Methodology Brainstorm.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
Capacity Methodology Statements Transmission Workstream 5 th July 2007.
Entry Capacity Substitution Workshop 3 11 th June 2008 Substitution Example.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
DRSEC Update Transmission Workstream 06 November 2008.
Trades and Transfers Workshop, 6 th November 2007.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Initial Thoughts on Timeline for Entry Capacity Substitution Draft for discussion purposes only.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
European Developments Transmission Workgroup 3 rd May 2012.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
The Entry Capacity Substitution Regime Transmission Workstream 7 th February 2008 Thoughts for discussion.
Transmission Workstream 6 January 2011
* MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 9 August 2011 * 1##
Exit Capacity Release Methodology Statement
Transmission Planning Code – Draft Document
Code Governance Review UNC Modification Proposals
Transmission Planning Code
Transmission Workgroup 4th October 2012
PARCA Timeline Transmission Workgroup 4th July 2013 Rhys Ashman.
CAP190: Workgroup Report CUSC Modifications Panel, 26th August 2011
UNC Trader User – Licence obligations
Capacity Methodology Statements: Impact of Mod 452
NTS Entry Charging Review Update
Capacity Methodology Statements
Development Modification Proposal 0337: Introduction of a Inter-day Linepack Product – OPEN LETTER Review Group August th November 2010.
0291 – NTS Licence Special Condition 27 – Balancing Arrangements
Consideration of issues raised by UNC Modification Proposal 0244
Update on Exit Capacity Substitution and Revision
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Joint Office Presentation for Modification 0678
Development of Entry Capacity Substitution
Capacity Methodologies Review 2019
Transmission Planning Code Review
QSEC auction timetable
Modification 501 slides for Workgroup
PARCA Timeline.
Proposed Transitional Gas Exit Arrangements
Revised Tender Timescale for DN Interruption Arrangements
Entry Capacity Transfer and Trade
Gas Customer Forum DN Interruption Update - Introduction
Consideration of issues raised by UNC Modification Proposal 0244
Mark Freeman 29th January 2007
Options for the Development of a Demand Side Response Mechanism
Generic Revenue Driver Methodology
Transmission Workstream DN Interruption Update - Introduction
Open Letter - Summary of Responses
CAM: Next Steps UNC Transmission Workgroup Lisa Martin 9 January 2014.
Transmission Workstream 1st February 2007
IECR Incremental Step Size
Review Group 221: Review of Questions from Session 2
Incremental Entry Capacity Release Methodology Statement
Modification 0043 – Limitation on offering for sale unsold capacity
Transmission Workstream, 1 Mar 07
Revised Tender Timescale for DN Interruption Arrangements
Gas Customer Forum 28 July 2008
Capacity Access Review
Presentation transcript:

Exit Capacity Substitution and Revision Distribution Workstream meeting, 26th November 2009

Aim of the Session Raise awareness and understanding of the Exit Capacity Substitution and Revision obligations. Present proposed timetable for development of Exit Capacity Substitution and Revision methodologies consistent with Licence requirements compatible with industry requirements Encourage industry participation.

What does the Licence require? Special Condition SC8E Section 3(c)(i) substitute unsold NTS baseline exit flat capacity…..such that the level of NTS obligated incremental exit flat capacity is minimised. Section 3(c)(ii) revise the level of NTS baseline exit flat capacity……in the event that the release of incremental obligated entry capacity changes the availability of NTS exit capacity. Section 4(b)(i) prepare and submit for approval by the Authority an exit capacity substitution methodology statement to be used in respect of 3(c)(i) above. Section 4(c)(i) prepare and submit for approval by the Authority an exit capacity revision methodology statement to be used in respect of 3(c)(ii) above. NB – All references to flow flexibility have been removed

Key Dates In their letter delaying the introduction of the exit capacity substitution and revision obligations the Authority set the following key milestones. 4 January 2011: submit the methodology statement(s) for approval. This would facilitate a decision by 4 April 2011 and implementation in the July 2011 application window. 3 December 2009: publish a timetable of planned exit substitution workshops on or before 3 December 2009 and to inform the transmission workstream accordingly. 30 April 2010 and 31 August 2010: submit interim reports to Ofgem setting out the progress to date together with NGG’s assessment of their ability to ensure that implementation can be achieved as set out in the direction.

Indicative Timeline: Development of Exit Capacity Substitution and Revision Methodologies. Note: The workshop dates are indicative Approval of ExCS, UNC Mods, Charging Methodology 04/04/11 04/11 to 01/12/10 Formal consultation 1st June to mid July Informal consultation 27th Jan, 23rd Feb, 7th Apr Workshops 1, 2, 3 17th Aug Workshop 5 25th May Workshop 4 By 04/01/11 submit ExCS for Approval 01/07/11 ExCS effective 30/04/10 Ofgem update 1 31/08/10 Ofgem update 2 03/12/09 Workstream: Publish plans Impact Assessment as necessary Dec 09 Jan 10 Feb 10 Mar 10 Apr 10 May 10 Jun 10 Jul 10 Aug 10 Sep 10 Oct 10 Nov 10 Dec 10 Jan 11 Feb 11 Mar 11 Apr 11 May 11 Jun 11 Jul 11 Develop UNC Mod Proposals (if any) 16/12/10 Mod Panel Decision 05/08/10 Tx Workstream: present mods Consult and Report 07/03/11 Submit charging methodology for approval Develop and consult on charging proposals (if any) Timetable for Licence changes not shown

Workshop Draft Agendas 27th Jan 2010 Workshop1 High level introduction (Ofgem) Objectives of substitution and revision. Key requirements any proposals must satisfy. Review timeline / workshop agendas Review industry comments and issues raised. Review / agree scope for substitution. Data presentation (e.g. baselines vs sold). Initial brainstorm of high level options for substitution. Lessons from entry substitution. Encourage industry to put forward alternatives.

Workshop Draft Agendas 23rd Feb 2010 Workshop 2 Review scope for capacity revision. High level options for revision. Review industry alternatives for substitution. Present more detailed substitution options. Review potential IT systems impact. 7th April 2010 Workshop 3 Substitution: Developed detailed options / proposal with worked examples. Revision: Identify examples for detailed network analysis.

Workshop Draft Agendas 25th May 2010 Workshop 4 Detailed analysis of examples. Impact on baselines / pricing. Consider UNC mod requirements. Consider charging methodology changes. Update on IT systems impact. 17th Aug 2010 Workshop 5 Review informal consultation responses. Present final proposals.

Workstream Action To ensure that the exit capacity substitution and revision methodologies adequately take account of all potential impacts on Shippers, connected system operators and connected consumers National Grid is seeking the views of all industry participants. Before workshop 1, preferably by 8th January 2010, interested parties are requested to identify areas / issues that need to be considered as proposals are being developed, e.g. how will exit capacity substitution affect DN flow swapping? Responses should be relatively short; a list of issues with brief description. We will seek further information from individual respondents where necessary. Responses to be sent to lesley.ramsey@uk.ngrid.com and copied to box.transmissioncapacityandcharging@uk.ngrid.com

Next steps Industry to identify and notify National Grid of specific areas of concern that need to be considered as proposals are being developed: By 8th January 2010. Workshop 1 (27th January) National Grid to present: initial high level options for substitution. background data time and location to be confirmed.