S AN NICOLAS / APODACA, N.L DISTANCE TO P a r k L o c a t i o n M ONTERREY METROPOLITAN AREA T e l e p h o n e (+52) (81) 8356-7978 w w w. v y n m s a.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Real estate sales, development and leasing.
Who Wants To Be A Millionaire?
Kick Off WB assignment Measurement and Dimensions.
Welcome to Who Wants to be a Millionaire
Name: Date: Read temperatures on a thermometer Independent / Some adult support / A lot of adult support
Jubail Industrial City A $45 Billion Super Project
Slide 1 Insert your own content. Slide 2 Insert your own content.
1 "Isky Enviroearth System presentsIsky Enviroearth The Future of energy.
ALGEBRA Number Walls
1 Beth McKillop, The British Library Library contacts with Korea.
Application Guidelines Guide Signs
Mean, Median, Mode & Range
0 - 0.
Addition Facts
Year 6 mental test 10 second questions
Who Wants To Be A Millionaire?
Welcome to Who Wants to be a Millionaire
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
Welcome to Who Wants to be a Millionaire
Welcome to Who Wants to be a Millionaire
$1 Million $500,000 $250,000 $125,000 $64,000 $32,000 $16,000 $8,000 $4,000 $2,000 $1,000 $500 $300 $200 $100 Welcome.
Module Floor Systems.
22 AUGUST 2013 WORKING WITH ENERGY IN CHINA 1 Working with energy in China Mogens Heering, Senior VP, COWI CMC Zhang Penghao, Market Director, COWI China.
Bud Jacksons Sportsmans Bar & Grill 2209 Adams Avenue As purchased in 2003 Built circa 1920 Legacy restaurant and bar facility Existing service area: 3,446.
Introduction to building Estimating in South Australia 1.
With more than 20 years of operations, we are the largest privately held Third Party Logistics (3PL) company in Mexico. -Distribution centers strategically.
Basic Bearer & Joists Calculations The following two slides will help you understand the calculation process for Bearer & Joist Calculations First look.
$100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400.
PROJECT EMERALD SKYLINE
Florida Department of Agriculture and Consumer Services Division of Marketing and Development.
Module Reading Plans and Elevations
KCDC Knox County Development Corporation Virtual Building 50,000 SF Manufacturing- 4,300 SF office building.
1 The Enhanced Classroom Development Process: Standards and Practices Andrew Faunce, Dartmouth College Michael Ney, Gettysburg College.
DISTANCE TO PARK INFRASTRUCTURE - WATER ………………..………………… SEWER ………………….…………………………. - TELPHONE LINES …..……………………… ENERGY ………..…………………………………….
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Where is RiverStone?. Most of Southeast within 500 mile radius Overnight truck shipping to significant portion of eastern US.
GUARAJUBA BEACH Ι BAHIA Ι BRAZIL. THE STATE OF BAHIA NORTHEAST REGION (9 STATES) – KM OF COAST LINE THE STATE OF BAHIA HAS KM OF COAST LINE.
1 ProLogis China -ProLogis Park Northwest -ProLogis Park Suzhou May, 2006.
Cornville Community Park Conceptual Design Recreation Area and Facility Design Class March 12, 2008.
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
1 UPCOMING OPPORTUNITIES – Contractors Caissons Contractor(s) to perform installation of caissons to include purchase of all required materials. u Low/High.
Constructions of Large-panel Buildings in Vilnius
2 |SharePoint Saturday New York City
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
5.1 Solving Right Triangles
Created by Susan Neal $100 Fractions Addition Fractions Subtraction Fractions Multiplication Fractions Division General $200 $300 $400 $500 $100 $200.
1.  Private sector involvement is important  There are three major forms of participation: ◦ Type A: Government procurements (GP) ◦ Type B: Private.
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
This, that, these, those Number your paper from 1-10.
Addition 1’s to 20.
Equal or Not. Equal or Not
Slippery Slope
Test B, 100 Subtraction Facts
$1 Million $500,000 $250,000 $125,000 $64,000 $32,000 $16,000 $8,000 $4,000 $2,000 $1,000 $500 $300 $200 $100 Welcome.
MUNICIPALITY OF PRESEVO A place of fast prosperity INDUSTRIA L ZON E.
Week 1.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
1 Sec 4.5 Optimization (Applied Max/Min Problems).
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
PSSA Preparation.
1 Career Opportunities in Local Government. 2 SERVICE DESIRED SERVICE DELIVERY COUNCIL CAO RESIDENTSRESIDENTS STAFF Relationship Model.
Improving your innovation performance Dr Karen Manley Queensland University of Technology.
Source Logistics: Built on the California – México Relationship Sacramento, Chamber of Commerce May, 2015.
Private Sector  Buildings and structures built for ordinary people.
Grupo GL Grupo GL Construcciones y Promociones SA De CV was founded over 13 years ago and is proud to be a Mexican company. Grupo GL Construcciones y Promociones.
2911 AW Grimes Blvd., Pflugerville TX 78660
Progress Report 11/10/11.
Q:\Pictures\Industrial\NWQ\Crescent IV\Crescent IV - pic for flyer.jpg
Unit 47, Rosemount Park Drive, Rosemount Business Park, Ballycoolin, Dublin 15 To Let 25,006 sq. ft 2,323 sq. m High spec logistics facility with 11 meters.
Presentation transcript:

S AN NICOLAS / APODACA, N.L DISTANCE TO P a r k L o c a t i o n M ONTERREY METROPOLITAN AREA T e l e p h o n e (+52) (81) w w w. v y n m s a. c o m Ruben Calderon ( ) Contact us Ernesto Lopez ( ) A DVANTAGES -S an Nicolás, N.L. (Miguel Alemán Industrial Park) -Borderline with Apodaca L OCATION SPEC I – VYNMSA Miguel Aleman Industrial Park I nventory B uilding / For L ease or S ale -LAREDO, TX…………………………… -REYNOSA CITY…….………..……….. -MEXICO CITY…………………………. -MONTERREY DOWNTOWN…..……. -SALTILLO / RAMOS ARIZPE..………. -MONTERREY INTERNATIONAL AIRPORT ……………………………… KM 210 KM 910 KM 10 KM 15 KM P ARK INFRASTRUCTURE - WATER ………………..…….. - SEWER ………………….….. - TELEPHONE LINES …..…….. - ENERGY ………..…………… - GAS …………….……..……… (AYD) (MUNICIPALITY) (TELMEX) (CFE) (CIA MEXICANA DE GAS) -L OCATION: BORDER LINE APODACA / SAN NICOLAS -WITH IN THE MONTERREY METROPOLITAN AREA -A IRPORT: AT LESS THAN 15 MIN DRIVE -H IGHWAYS TO: SALTILLO – RAMOS, LAREDO, REYNOSA, - L ABOR FORCE: QUALIFIED WALKING DISTANCE LABOR -- - FORCE -C ONTROLLED ACCESS: FENCED AND GATED. -P OCKET PARK FLEXIBILITY : PARK LAYOUT CAN ACCOMMODATE A VARIETY OF BUILDING SIZES - U SE: MANUFACTURING WAREHOUSING DISTRIBUTION -T RANSPORTATION: PRIVATE & PUBLIC -I NFRASTRUCTURE: WORLD CLASS 1. VYNMSA MIGUEL ALEMAN INDUSTRIAL PARK 2. VYNMSA RIDGE SANTA CATARINA INDUSTRIAL PK 3. LA SILLA APODACA INDUSTRIAL PARK 4. SABINAL INDUSTRIAL PARK 5. ACUEDUCTO INDUSTRIAL PARK 6. LA SILLA GUADALUPE INDUSTRIAL PARK 7. MONTERREY TECHNOLOGY PARK 8. VEP INDUSTRIAL PARK 9. VYNMSA RAMOS ARIZPE INDUSTRIAL PARK 10. VYNMSA MONTEMORELOS INDUSTRIAL PARK 11. AEROPUERTO TECHNOLOGY PARK 12. VYNMSA AEROPUERTO APODACA INDUSTRIAL PARK 13. OMA VYNMSA AERO INDUSTRIAL PARK Monterrey / San Luis Potosí / Querétaro / Montemorelos / Saltillo - Ramos Arizpe / Irapuato

T e l e p h o n e (+52) (81) w w w. v y n m s a. c o m I nventory B uilding / For L ease or S ale L O T A V A I L A B L E P a r k G e n e r a l I n f o r m a t i o n Ruben Calderon ( ) Contact us Ernesto Lopez ( ) SPEC I – VYNMSA Miguel Aleman Industrial Park Monterrey / San Luis Potosí / Querétaro / Montemorelos / Saltillo - Ramos Arizpe / Irapuato RENDERING OF THE FACADE

L a S i l l a A p o d a c a I n d u s t r I a l P a r k T e l e p h o n e (+52) (81) w w w. v y n m s a. c o m P a r k G e n e r a l I n f o r m a t i o n I nventory B uilding / For L ease or S ale LOT - A 358,300 ft2 8.2 acres 33,300 m2 LOT - B 312,000 ft2 7.1 acres 29,000 m2 LOT - D 191,500 ft2 4.3 acres 17,800 m2 LOT - E 161,400 ft2 3.7 acres 15,000 m2 Ruben Calderon ( ) Contact us Ernesto Lopez ( ) SPEC I – VYNMSA Miguel Aleman Industrial Park Monterrey / San Luis Potosí / Querétaro / Montemorelos / Saltillo - Ramos Arizpe / Irapuato BUILT AREA : 158,625 Ft² or 14,736 M2 LAND AREA: 28,805 M2 STRUCTURE: Pre Engineered Rigid Frame ROOF SYSTEM:SSR, 4 in. Thermoacoustic Insulation WALL SYSTEM: Thick precast concrete panels with polystyrene, windows at the top for natural lighting. FLOOR SYSTEM: To be poured ( according to client needs) CLEAR HEIGHT: 30 Ft. ( 9,14 M at the lowest point) DOCKS & RAMPS (6) docks & (4) trailer staging RAMP (2) ramps CAR PARKING: 143 spaces (room for more) OFFICE:To be built ( according to client needs) SPECS 30 Ft. SAMPLE INTERIOR VIEW

L a S i l l a A p o d a c a I n d u s t r I a l P a r k T e l e p h o n e (+52) (81) w w w. v y n m s a. c o m P a r k G e n e r a l I n f o r m a t i o n I nventory B uilding / For L ease or S ale LOT - A 358,300 ft2 8.2 acres 33,300 m2 LOT - B 312,000 ft2 7.1 acres 29,000 m2 LOT - D 191,500 ft2 4.3 acres 17,800 m2 LOT - E 161,400 ft2 3.7 acres 15,000 m2 Ruben Calderon ( ) Contact us Ernesto Lopez ( ) SPEC I – VYNMSA Miguel Aleman Industrial Park Monterrey / San Luis Potosí / Querétaro / Montemorelos / Saltillo - Ramos Arizpe / Irapuato The last industrial site on the edge of the San Nicolas Urban Development (borderline with Apodaca), abundant labor walking distance.