General Tab Project, Cost Schedule, and Work Limits Roadway Character

Slides:



Advertisements
Similar presentations
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Advertisements

ODOT’s Public Involvement Process PI and the Project Development Process Minimum PI Requirements.
Section 4(f) and Section 6(f) Updates questions to:
Section 4(f) Section 6(f). Section 4(f) Process Overview 2 Project Initiation Package Field Review 4(f) Property Present Use Coordination NEPA Document.
Project, Cost Schedule, and Work Limits Roadway Character Design Criteria for Bridges Maintenance of Traffic Right-of-Way & Utility Involvement General.
Cost Estimation System Tool
WELCOME! October 28, 2013 ODOT District 1 & District 2.
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Bridge Building Timelines Presented by The Richland County Engineers Office Thomas E. Beck, PE, PS 77 North Mulberry Street Mansfield, Ohio Jan.
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Presented by: The Ohio Department of Transportation 1 Land Use Managing the Environmental & Project Development Process.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
POLICY & OVERSIGHT DIVISION (POD) February 2014 MILESTONE ACQUISITION PLANS TRAINING 1.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Request for Environmental Services (RES) Missouri Local Programs How to Complete The Request for Environmental Services.
MD 97 (Georgia Avenue) at Randolph Road Purpose Improve vehicular, bicyclists and pedestrian safety Improve Levels of Service Increase capacity Improve.
Community Impacts Environmental Justice Public Involvement Categorical Exclusion Training Class.
U.S. 150 / S.R. 56 Road Reconstruction Project in Paoli, Orange County Thursday, August 25, :00pm Presentation Orange County Community Center 1075.
STA Safety Project PID #76439 December 12, 2006.
Section 4(f)/6(f) Categorical Exclusion Training Class.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
SR 256 Road Rehabilitation Town of Austin January 18, :00pm Austin Elementary School.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
Geometric Design: General Concept CE331 Transportation Engineering.
MED SR 18 Corridor Project MED PID October 13, 2015.
Maintenance and Temporary Traffic Control
Community Impacts Environmental Justice Public Involvement Categorical Exclusion Training Class.
Section 4(f) Categorical Exclusion Training Class.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
Hillsborough County Public School Siting MPO SCHOOL TRANSPORTATION WORKING GROUP
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
I-66 OUTSIDE THE BELTWAY Shrevecrest HOA JUNE 21, Susan Shaw, P. E
2nd Street Drainage and Paving Improvements

Jefferson County SA Red Rocks Site Approval
How to Plan and Conduct Effectively
Four Winds Condominium Association August 2, 2017
The I-465 West Leg Reconstruction Project
S.R. 30A / U.S. 98 / Panama City Beach Parkway
June 5, 2017.
The Alabama Transportation Rehabilitation and Improvement Program
Community Impacts Underserved Populations Public Involvement
Project Status Update I-680 Southbound HOV Gap Closure Project Environmental Phase September 2011 PARSONS.
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
City of Bloomfield Hills
IA 122 RECONSTRUCTION PRE-BID MEETING
General Tab Project, Cost Schedule, and Work Limits Roadway Character
AX7665D82 Areawide Total Maximum Daily Load (TMDL) Design-Build
Participatory Road Program neighborhood meeting Donahoo 174th Street
General comments: These projects are locally owned and the LPA should be involved and informed throughout the project. The project agreement is between.
PROJ. 566(17) LOR PID MAJOR WIDENING
Technical Committee on Geometric Design
Planning Commission Meeting: August 3, 2016
Other Resources Categorical Exclusion Training Class – Presented by the Office of Environmental Services.
Community Impacts Underserved Populations Public Involvement
Section 4(f) Categorical Exclusion Training Class – Presented by the Office of Environmental Services.
Purpose & Need Categorical Exclusion Training Class – Presented by the Office of Environmental Services.
Geometric Design: General Concept CE331 Transportation Engineering.
Design Criteria CTC 440.
Environmental Commitments
S.R. 26 Road Rehabilitation in Clinton County
Environmental Commitments
105 Indiana Administrative Code Article 13
Walker Street Reconstruction Project 25% Design Public Hearing
2019 Capital Program Title of Presentation
Greater Pittsburgh Airport Area Property
Presentation transcript:

General Tab Project, Cost Schedule, and Work Limits Roadway Character General Tab Project, Cost Schedule, and Work Limits Roadway Character Design Criteria for Bridges Maintenance of Traffic During Construction Right-of-Way and Utility Involvement Categorical Exclusion Training Class – Presented by the Office of Environmental Services

Project Cost Schedule Work Limits Project Cost Schedule Work Limits

C1 and C2 CEs Data for these CE’s are completed in one tab Data for these CE’s are completed in one tab Specific data populated from Ellis: PID Project Sponsor ODOT District Funding Source Y/N dropdown for private funding STIP Reference # Manually entered in text field [3] Categorical Exclusion Training Class – Presented by the Office of Environmental Services

C1 Example [4] Categorical Exclusion Training Class – Presented by the Office of Environmental Services

C2 Example [5] Categorical Exclusion Training Class – Presented by the Office of Environmental Services

D-Listed CEs – Project Data Environmental Document Level Specific data populated from ELLIS PID Project Name Project Sponsor ODOT District Funding Source [6] Categorical Exclusion Training Class – Presented by the Office of Environmental Services

D-Listed CEs – Project Data Private and local public funding (Y/N) STIP Reference # Manually entered in text field Confirm the next phase is listed on the STIP (Y/N) Confirm the current cost estimate meets requirements prior to CE approval (Y/N) [7] Categorical Exclusion Training Class – Presented by the Office of Environmental Services

D-Listed CEs – Project Data Project costs populated from Ellis Planning and Engineering Right of Way Construction Other Interchange Modification/Justification Study (Y/N) [8] Categorical Exclusion Training Class – Presented by the Office of Environmental Services

Work Limits Limits of Proposed Work Populated from ELLIS Only displays for D-listed CEs Start and end points (SLM) and total work length (miles) are entered manually [9] Categorical Exclusion Training Class – Presented by the Office of Environmental Services

General Tab - EnviroNet [10] Categorical Exclusion Training Class – Presented by the Office of Environmental Services

General Tab - EnviroNet [11] Categorical Exclusion Training Class – Presented by the Office of Environmental Services

C1 Project Description Proposed Action Proposed Action Concise statement about proposed activities Indicate MPO/local public agency involvement Geographical setting Location of the project [12] Categorical Exclusion Training Class – Presented by the Office of Environmental Services

C2 Project Description Proposed Action Proposed Action Concise statement about proposed activities Discuss whether traffic will be maintained/detoured (Maintenance of Traffic) Discuss right-of-way and utility impacts Geographical setting Location of the project Include statement: “The environmental document and associated studies are being approved using (insert appropriate stage of design) Stage 1 Design. A copy of the plans are included in the project file.” [13] Categorical Exclusion Training Class – Presented by the Office of Environmental Services

D-Listed Project Description Proposed Action Concise statement about proposed activities Geographical setting Location of the project Include statement: “The environmental document and associated studies are being approved using (insert appropriate stage of design) Stage 1 Design. A copy of the plans are included in the project file.” [14] Categorical Exclusion Training Class – Presented by the Office of Environmental Services

Roadway Character

Roadway Character Not included for C1 and C2 D-Listed CEs: Not included for C1 and C2 D-Listed CEs: Select Functional Classification (dropdown) Based on type of service provided Enter ADT (Average Daily Traffic) Current and Design Year Enter Daily Hourly Volume Proportion of traffic moving in the peak direction during the design hour [16] Categorical Exclusion Training Class – Presented by the Office of Environmental Services

Roadway Character Truck percentage (% of total traffic) Truck percentage (% of total traffic) Setting and topography Select appropriate answer from dropdown menu [17] Categorical Exclusion Training Class – Presented by the Office of Environmental Services

Roadway Character Existing and Proposed Design Criteria Design speed Existing and Proposed Design Criteria Design speed Speed facility is designed to accommodate Legal speed Posted speed limit Number and type of lanes Through or two-way left-turn lane (TWLTL) Pavement, shoulder, median & sidewalk width Existing and required width per L&D manual [18] Categorical Exclusion Training Class – Presented by the Office of Environmental Services

General Tab - EnviroNet [19] Categorical Exclusion Training Class – Presented by the Office of Environmental Services

Design Criteria for Bridges Design Criteria for Bridges

Design Criteria for Bridges Does not display if project does not involve bridges Populated from Ellis Sufficiency and General rating Date constructed Bridge location Bridge type, length, and number of main spans Load restrictions Proposed data is entered manually Answer drop-down appropriately (#53) Structure rehabilitation or replacement? [21] Categorical Exclusion Training Class – Presented by the Office of Environmental Services

General Tab - EnviroNet [22] Categorical Exclusion Training Class – Presented by the Office of Environmental Services

General Tab - EnviroNet [23] Categorical Exclusion Training Class – Presented by the Office of Environmental Services

Maintenance of Traffic During Construction Maintenance of Traffic During Construction

Remarks Discuss proposed/anticipated closures and detours Discuss proposed/anticipated closures and detours Include references to specific applicable policies If MOT substantially impacts sensitive environmental resources, discuss accordingly Discuss how proposed MOT will impact entities that serve the community EMS, fire, police, schools, public facilities, etc. Discuss coordination/PI activities that were initiated with these entities as part of NEPA Are they aware of potential impacts? [25] Categorical Exclusion Training Class – Presented by the Office of Environmental Services

Remarks Indicate how public entities will be kept updated Indicate how public entities will be kept updated Advanced notice is required for complex MOT List environmental commitments (#66) Answer yes to generate table [26] Categorical Exclusion Training Class – Presented by the Office of Environmental Services

Example Maintenance of traffic will be handled in four phases: During Phase 1, SR 999 north of the intersection with SR 45 will be closed to accommodate reconstruction. The detour will be SR 328 to US 25 to SR 999 (MOT will be finalized in Stage 3 Design). Special provisions will be made for property owners along SR 999 to access residences. One residential property has two driveways, therefore, at least one drive will be available at all times during construction. During Phases 2 and 3, the SR 999/SR 45 intersection will be reconstructed and traffic will be maintained with part width and signals. During Phase 4, SR 999 south of the intersection will be closed to accommodate reconstruction. The detour will be SR 328 to US 25 to SR 999. There are no through-traffic dependent businesses or festivals that require special accommodations or provisions. Emergency vehicles, public services, and schools will utilize township and county roads. A press release will be issued 15 days in advance of the start of construction activities. [27] Categorical Exclusion Training Class – Presented by the Office of Environmental Services

General Tab - EnviroNet [28] Categorical Exclusion Training Class – Presented by the Office of Environmental Services

Right-of-Way and Utility Involvement Right-of-Way and Utility Involvement

Right-of-Way Include approximate acquisition figures (acreage) Include approximate acquisition figures (acreage) Permanent and temporary ROW Permanent and temporary Easements Number of parcels impacted In remarks, indicate type of impacts and location Strip takes Easements or work agreements Impacts to residences, businesses, etc. Include environmental commitments (no table) [30] Categorical Exclusion Training Class – Presented by the Office of Environmental Services

Utility Involvement Answer utility drop-downs Answer utility drop-downs List specific utilities impacted Utility coordination initiated during NEPA, but typically on- going throughout design [31] Categorical Exclusion Training Class – Presented by the Office of Environmental Services

Example Estimated right-of-way is based on preliminary drawings and construction limits. Approximately 10.25 acres (12 parcels from 9 owners) is expected to be acquired from land owners in Westmoreland County and 4.045 acres (62 parcels from 55 owners) is expected to be acquired from land owners in Eastern County. Strip right-of-way of approximately 1.85 acres will be acquired from Madison Park, which is owned by the MetroParks of Westmoreland County. All utilities shown on the project plans or identified during project construction will be relocated or adjusted by the owner of the utility. The project may require the relocation of the following utilities: electric, gas, telephone, water, cable, and sewer. All utility work shall be coordinated between the contractor and the utility owners in such a way as to avoid and/or minimize any inconvenience to potentially affected customers. All utility work not included in this contract shall be performed by the affected utility owner or its contractor and will be compliant with ODOT roadway design standards. Utility work will be ongoing throughout construction of the project. [32] Categorical Exclusion Training Class – Presented by the Office of Environmental Services

General Tab - EnviroNet [33] Categorical Exclusion Training Class – Presented by the Office of Environmental Services

General Tab - EnviroNet [34] Categorical Exclusion Training Class – Presented by the Office of Environmental Services

Project File - General Documentation can include: USGS Topo Quad Map Documentation can include: USGS Topo Quad Map County Map Aerial Map Photographs Right-of-Way Plan Sheets Stage 1, 2, and 3 Design Plans Follow ODOT NEPA File Management and Documentation Guidance [35] Categorical Exclusion Training Class – Presented by the Office of Environmental Services