Development Modification Proposal 0337: Introduction of a Inter-day Linepack Product – OPEN LETTER Review Group 0291 11 August 2010 14th November 2010.

Slides:



Advertisements
Similar presentations
NTS Exit (Flat) Capacity Charges – Credit Arrangements (UNC TPD V3.3.4) Simon Trivella – 14 th January 2009 Distribution Workstream.
Advertisements

Review of industry code governance 26 March 2010.
5 February 2009 energynetworks.org 1 Common Methodology Group Work PRESENTED BY OLIVER DAY ON BEHALF OF WORKSTREAM 3 Workstream 3 Tariff Application.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
KEY CONSULTATIONS an overview Louise Masters InnogyOne, Innogy UK Offshore Wind 2003.
Moving the QSEC and AMSEC Auctions National Grid NTS, Transmission Workstream.
NTS Update Gas Customer Forum 25 th September 2006.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
Review of the UNC Post-emergency Arrangements Workshop 1 March 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
LTSEC summer auction Transmission Workstream 6 th April 2006 Dave Adlam, National Grid NTS.
Ofgem Open Letter – Next Steps Transmission Workstream
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Proposed DN Pensions Deficit Charge Transmission Workstream 2 November 2006.
Moving the QSEC and AMSEC Auctions Update. 2  Presented proposal at October Workstream  Questions / suggestions received, mainly around  Over & Under.
Initial Thoughts on the Release of Non Obligated NTS System Entry Capacity Transmission Workstream 3 rd April 2008.
Capacity Methodology Statements Transmission Workstream 5 th July 2007.
Optimisation of Entry Capacity Strawman Transmission Workstream 4 th May 2006.
GVC Group Update Andy Pace 6 October | Energy Networks Association - DCMF.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Managing the Costs of New Developments Initial Proposals on Transmission System Operator Internal Costs from 1 st April 2007 Update from National Grid.
DRSEC Update Transmission Workstream 06 November 2008.
Trades and Transfers Workshop, 6 th November 2007.
Initial Thoughts on Timeline for Entry Capacity Substitution Draft for discussion purposes only.
European Developments Transmission Workgroup 3 rd May 2012.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
Review of the UNC Post-emergency Claims Arrangements Strawman February 2009.
Transmission Workstream 6 January 2011
Entry Capacity Overrun price calculation
Grid Code What is the Standard Modification Process? Panel
Review of UNC Section Q “Emergencies”
Grid Code Development Forum – 6 September 2017
UNC Modifications 061 & 062 – An Overview
Code Governance Review UNC Modification Proposals
Grid Code Review Panel 16th August 2017
PARCA Timeline Transmission Workgroup 4th July 2013 Rhys Ashman.
Global Aggregation Mod raised by ESB CS at Mods Meeting 24 ( )
CAP104 Amendment to System to Generator Inter-trip Related Terms concurrently defined in the Grid Code and the CUSC. Emma Carr 25th August 2005.
SO Incentives from April 2010
UNC Trader User – Licence obligations
Gas SO Incentives from April 2010
Revised engagement approach for draft GTAC
Electricity Governance Comparison
NTS Entry Charging Review Update
0291 – NTS Licence Special Condition 27 – Balancing Arrangements
Exit Capacity Substitution and Revision
Rebecca Hailes For 15 March 2018
Joint Office Presentation for Modification 0678
Topic raised at July 2009 Distribution Workstream
Development Modification Proposal 0337: Introduction of a Inter-day Linepack Product – User Pays Options Review Group August th November.
QSEC auction timetable
Mod Proposal 0268 : AQ Backstop Date
PARCA Timeline.
Draft Mod: Update of default System Marginal Prices
Gas Customer Forum DN Interruption Update - Introduction
Richard Fairholme Transmission Workstream 4th September 2008
Mark Freeman 29th January 2007
Options for the Development of a Demand Side Response Mechanism
Ofgem presentation to Gas Transmission Workstream
Optimisation of Entry Capacity Modification Proposal
Transmission Workstream DN Interruption Update - Introduction
Modification 0043 – Limitation on offering for sale unsold capacity
Key Impacts Modification Proposals Legal Text Modification Reports.
Transmission Workstream 05 November 2009
Gas Customer Forum 28 July 2008
Presentation transcript:

Development Modification Proposal 0337: Introduction of a Inter-day Linepack Product – OPEN LETTER Review Group 0291 11 August 2010 14th November 2010

Open Letter National Grid to raise an Open Letter seeking industry views on their anticipated usage and the viability of Linepack Product to Users. Open Letter consultation will be completed prior to commencing the Modification Proposal consultation period. Open Letter will facilitate final development of the Proposal and inform the User Pays option included in the Modification Proposal. Allows views of those unable to attend Workstream meetings to be captured prior to finalisation of the Modification Proposal.

Open Letter – Industry views sought on the following areas: expected utilisation of Service valuation of the service reserve pricing User Pays Options impact on other products (OTC Trading, OCM, Storage Services) Potential structure of any National Grid Inter-day Linepack release incentive any other comments

Open Letter – consultation timetable Final MP0337 Development Workstream meeting 14 Dec 10 Open Letter - for industry consultation 20 Dec 10 Issue Inter-day Linepack Methodology Paper 12 Jan 11 incorporate into MP0337 Open Letter – close out of representations 24 Jan 11 MP0337 Workstream report to Transmission Workstream Incorporating relevant feedback from Open Letter 3 Feb 11 Panel review MP0337 Workstream Report 17 Feb 11 MP0337 Workstream Report to Panel Include suggested legal text Include relevant feedback from Open Letter recommendation to consultation 17 Mar 11 FMR to April Panel 21 Apr 11 FMR issued to Ofgem for decision 22 Apr 11