EQUIPMENT RELIABILITY AT KOEBERG

Slides:



Advertisements
Similar presentations
Human Performance: Observation Principles of Excellence
Advertisements

Responding to the Electricity Challenges: Five Point Plan Overview 19 December 2014 Confidential 1.
ACADs (08-006) Covered Keywords Pressurized Water Reactor (PWR), Boiling Water Reactor (BWR), primary loop, reactivity, reactivity control, reactivity.
ISOE Information System on Occupational Exposure: An Overview Brian Ahier, Ted Lazo (ISOE Joint Secretariat, OECD Nuclear Energy Agency) 2007 Asian Regional.
Summer Co-op Experience: OPG Aditi Garg. Darlington Nuclear G.S Located in Bowmanville, ON.
RELIABILITY IN A HIERARCHICAL MANAGEMENT. 1 LITERATURE REVIEW & METHODS THE RESULTS OF THE PRESENTATION CONTENT 2 3 INTRODUCTION AND OBJECTIVE.
PSAEA – CNRA Conference on OEF (Köln, 29-31/05/2006) The relationship between risk analysis and event analysis – PSA based Event Analysis P. De Gelder.
Quality Manual for Interoperability Testing Morten Bruun-Rasmussen Presented by Jos Devlies, Eurorec.
Maintenance Optimisation At Rovno NPP Robert Hudson.
1 CMBG 2009 PSEG Nuclear Vendor Technical Document Program Deficiencies, Successes, and Cost Savings Presented By: Paul Davis PSEG Nuclear, Engineering.
IRSN STRATEGY TO ASSESS A NEW MAINTENANCE POLICY / Nesebar, Bulgaria Presented by Naoëlle MATAHRI, IRSN.
Opting for “Long Term Operations” Technical, economic and regulatory considerations MARC Conference June 8, 2010 Sean Bushart, EPRI Sr. Program Manager.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
By Matt Douglass.  The Three Mile Island accident was a partial nuclear meltdown which occurred in one of the two Three Mile Island nuclear reactors.
ORAP ® New User Orientation March 4, 2007 Carlos Garcia Strategic Power Systems, Inc.
The strategy for improved electricity distribution maintenance 9 June 2008.
Summary Report of the EPRI Standard Radiation Monitoring Program
Glen Fields - Final Project Presentation. What Sets CSI Apart... GBA 573 Consultants Company Background Located in San Diego, CA 5 Engineering Consultants.
Example Incident Mgmt Initiation No recording of Incidents Users can approach different departments Solutions of previous incidents are not available.
System Monitoring at the DAEC SysMon SMART Teaming up to get the most out of System Monitoring!
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Briefing on the Pebble Bed Modular Reactor Portfolio Committee on Public Enterprises 18 February Top Secret - 1.
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
The Changing Power Grid – NPP Flexible Plant Operations Sherry Bernhoft EPRI, Program Manager July 29, 2014.
Occupational Radiation Protection at Swedish Nuclear Power Plants: Views on Present Status and Future Challenges Ingemar Lund et al. Department of Occupational.
Application of « ALARA » at Tihange NPP ISOE EUROPEAN SYMPOSIUM 26 June 2008 Ir. Philippe Petit – Deputy head of SRP department 2 2.
European network for Health Technology Assessment | JA | EUnetHTA European network for Health Technology Assessment THL Info.
1 CMBG 2009 Planning for Obsolescence June 27, 2009 John Parler South Carolina Electric & Gas.
Development Account: 6th Tranche Strengthening the capacity of National Statistical Offices (NSOs) in the Caribbean Small Island Developing States to fulfill.
NUCLEAR REACTORS G. HETSRONI Emeritus Danciger Professor of Engineering Technion – Haifa – Israel.
A Study on Human Factors in Maintenance of a Nuclear Power Plant Park Young Ho Dept. of Nuclear & Quantum Engineering Korea Advanced Institute of Science.
Asset Integrity & Reliability Management A Strategic Perspective Andreas de Vries Doha, 15 – 18 May 2016.
Version 1.0, May 2015 BASIC PROFESSIONAL TRAINING COURSE Module XX Regulatory control Case Study This material was prepared by the IAEA and co-funded by.
Instructor: Lloyd Hancock
CM-101 Configuration Management Fundamentals
Power Plants Types of Power Plants
2013 ISOE International ALARA Symposium
TOPIC: THE VALUE OF BIOMEDICAL ENGINEERS AND TECHNICIANS IN HOSPITAL PRESANTED BY: KWIZERA ABRAHAM STUDENT IN: BMET /FINALIST STU INSTITUTION: IPRC KIGALI.
FILM AND PUBLICATIONS BOARD
Presentation to Hernic Ferrochrome
Performance indicators Unplanned unavailability
An Integrated Risk Management & Safety Program: IRMSP
Delivering Risk Informed Engineering Programs (50.69) The OG Plan
The Success of the ALARA Principle – the View of an Inspector
Industrial Assessment Center Database
Monitoring and Evaluation Systems for NARS Organisations in Papua New Guinea Day 3. Session 8. Routine monitoring.
Summary Report of the EPRI Standard Radiation Monitoring Program
2012 Operating Experience for Feedwater and Related Systems
Pressurized Water Reactor
ISOE Information System on Occupational Exposure: An Overview
Nuclear (Atomic) Power Plant
Session Name: Ageing Management
Implementation of the UN DA 10 project “The African context”
2018/19 ANNUAL PERFORMANCE PLAN FOR MISA
DIAGNOSIS Case Study Work Session 1 From Concept to Reality
NSDS Roll-out: How Can PARIS21 Help?
Regulatory Oversight of HOF in Finland
Results of Design Reviews
MOSH Noise Team Presentation to JS August
Big Data for Nuclear Power Plants Shawn St. Germain – INL
Vendor Technical Information
Operationalization of a Public Works AM Strategy
Brian Ahier (OECD Nuclear Energy Agency, ISOE Joint Secretariat)
Fertilizer Industry Safety Information Analysis and Sharing Program
Yes, Nuclear can be Bold and Innovate
BASIC PROFESSIONAL TRAINING COURSE Module XX Regulatory control Case Study Version 1.0, May 2015 This material was prepared by the IAEA and.
Maintenance Opportunities
Fission Simple diagram of nuclear fission. In the first frame, a neutron is about to collide with the nucleus of a U-235 atom. In the second frame, the.
Asset Management Plan Development and Implementation Support
Program Introductions Who we are, what and where Clients and Systems
Presentation transcript:

EQUIPMENT RELIABILITY AT KOEBERG Susan van Wyk Reliability Engineering Manager Koeberg Nuclear Power Station

Outline Setting the Scene: Koeberg Nuclear Power Station Integration of Equipment Reliability Processes – The INPO AP-913 Equipment Reliability Process Our Equipment Reliability Journey Timeline Integration of Existing Processes Equipment Reliability Tools Conclusion 2019/02/22

1. Setting the Scene: Koeberg Nuclear Power Station Unit 2 Unit 1 Turbine Hall Intake Basin Only Nuclear Power Station in Africa Two Framatome 920 MWe Units 3-loop Pressurised Water Reactors (PWR) Unit 1 began operating in 1984 Unit 2 began operating in 1985 Provides approx. 6.5% of South Africa’s electricity Sister plants: Tricastin and Blayais (EDF) 2019/02/22

1. Setting the Scene: Koeberg Nuclear Power Station Primary System: Water as moderator and coolant. Boric Acid and Control Rods for reactivity control. Secondary System: Steam / Water cycle. Steam drives Turbine-Generator sets. Ultimate Heat Sink: Cold Sea Water 2019/02/22

1. Setting the Scene: Koeberg Nuclear Power Station 3 Steam Generators Containment 3 Steam lines taking steam to the turbine Reactor Vessel 3 Reactor Coolant Pumps Basic PWR Nuclear Island Layout 2019/02/22

1. Setting the Scene: Koeberg Nuclear Power Station Systems, Components & Maintenance Number of Systems = Approx. 200 systems Number of Preventative Maintenance (PM) Tasks = Approx. 62 620 (Online and Outage) Outage 218 Duration Target ≤ 45 days Outage ALARA Dose Target ≤ 720 mSv South Africa’s Electricity Demand vs. Generating Capacity Challenges during winter and unplanned plant outage periods Equipment Reliability paramount to availability of plants Strong Demand Side Management programme to reduce wasteful use of electricity 2019/02/22

What is our common enemy? Unexpected Corrective Maintenance of Critical Equipment 2019/02/22

2. Equipment Reliability Guidelines for Nuclear: INPO AP-913 Background INPO = Institute of Nuclear Plant Operators INPO developed ER process guidelines INPO first issued AP-913 “Equipment Reliability Process” in March 2000 INPO AP-913 provides guidelines to maintain a high level of safe and reliable plant operation in an efficient manner AP-913 Guides the integration and coordination of Equipment Reliability activities into one process to: Evaluate important station equipment Monitor equipment performance and condition Make continuing adjustments to the maintenance tasks and frequencies based on equipment operating experience (OE). Develop and implement long-term equipment health plans 2019/02/22

2. Equipment Reliability Guidelines for Nuclear: INPO AP-913 Background To make sure that: We are working on the right equipment – Critical Component Determination We are doing the right maintenance – Maintenance Tasks At the right time – Maintenance Task frequency While planning ahead – Life of Plant Planning And Continually Making Improvements by: Performance and Condition Monitoring Recording “As-found” conditions and feeding back to PM programme Using feedback from the Corrective Action Programme Having a “Living” Maintenance Programme 2019/02/22

2. Equipment Reliability Guidelines for Nuclear: INPO AP-913 Top Level Diagram 2019/02/22

3. Our Equipment Reliability Journey: Timeline Mid-2007 - Development of “Equipment Reliability” group (3 ppl). Focus on improving PHC (Plant Health Committee) and System Health Reporting Oct 2008 - EPRI AP-913 Gap Analysis – Improvements identified for existing RCM Maintenance Basis EDF / Eskom Contract. EDF fully adopts AP-913, including PM Templates. 2002…. 2006 2007 2008 2009 2010 2011 2002 /3: Organisational Change - Set up for Sys Eng & Comp Eng, SHR,RCM MB, Separate ER Processes Strategy development for further partnerships with EDF and AP-913. Process Integration Maintenance Basis Optimisation Project –identification of failure modes, PM templates 2007 WANO Equipment Reliability Technical Support Mission. 2019/02/22

Existing processes require further integration: 3. Our Equipment Reliability Journey: Integration of Existing Processes Review of Component Criticality using EDF classifications as input for improved alignment of maintenance strategies Maintenance Basis Project to review plant maintenance tasks and frequencies based on Industry and plant OE. Existing processes require further integration: System Health Reporting Component Health Reporting Performance Monitoring and Trending Component Failure Assessments, Intrusive Task Assessments, Root Cause Analysis, Corrective Actions Life of Plant Plans (LOPP) Maintenance Task and Frequency Optimisation based on real plant maintenance feedback 2019/02/22

3. Our Equipment Reliability Journey: Equipment Reliability Tools Individual software systems have grown over time, e.g: system health database, component health database, Life Cycle Management system, Work management systems, Problem Reporting databases, Corrective Action management, RCM software, Maintenance Basis Database. Integration of Equipment Reliability software for: Improved processes Limiting duplication of data entries Improved monitoring and trending to become more proactive instead of reactive Avoiding gaps that may exist between processes Efficiency Ease of comparison to Industry peer stations with similar software 2019/02/22

4. Conclusion Our goal is to eliminate unexpected corrective maintenance of critical components Integration of Equipment Reliability processes for a truly LIVING MAINTENANCE PROGRAMME Koeberg is continually improving its equipment reliability using the Nuclear Industry guidelines for Equipment Reliability, Industry peer benchmarking, Operating Experience (e.g. EPRI) and partnerships with EDF. 2019/02/22

Any Questions? 2019/02/22