GEF Training for New Agencies 1 November 2013 Washington D.C. The System for Transparent Allocation of Resources (STAR) Sonja S. Teelucksingh.

Slides:



Advertisements
Similar presentations
Focal Area and Cross Cutting Strategies – Land Degradation GEF Expanded Constituency Workshop March 22 – 24, 2011 Kyiv, Ukraine.
Advertisements

International Waters and Land degradation replenishment in GEF 4 (including fees and SGP) Total IW - $355 million for OP 8, 9,10 RBEC IW target - $26,700.
M&E in the GEF Aaron Zazueta GEF Evaluation Office Expanded Constituency Workshop Dalat, Vietnam - April 2011.
Focal Area and Cross Cutting Strategies – multilateral REDD-plus financing program GEF Expanded Constituency Workshop April 5 – 7, 2011 Da Lat, Vietnam.
GEF Funding For Enabling Activities GEF Expanded Constituency Workshop 30 October to 1 November 2012 Arusha, Tanzania.
Schlosser & Pfirman, Nature Geosciences, 2012 Integrated Approach Pilots: Charting a New Frontier for the Global Environment.
Global Environment Facility GEF approach to synergistic action on global environment issues Espoo, Finland, July 2 – 3, 2003.
GEF Project Cycle GEF Expanded Constituency Workshop 22 to 24 March, 2011 Kyiv, Ukraine.
Focal Area and Cross Cutting Strategies – multilateral REDD-plus financing program GEF Expanded Constituency Workshop 25 – 27 October 2011 Nairobi, Kenya.
UNCCD COP10 Decisions on Collaboration with the GEF GEF Expanded Constituency Workshop 8 to10 May 2012 Antigua and Barbuda.
GEF Policies and Processes in GEF 4 Sub-regional Workshop for GEF Focal Points Europe and the CIS 7-8 March 2007, Istanbul.
GEF Project Cycle Sub-Regional Workshop for GEF Focal Points in the Pacific SIDS Auckland, New Zealand, September 2008.
GEF Project Cycle Sub-Regional Workshop for GEF Focal Points in Asia May 2008, Manila.
The GEF in Mexico Integrating GEF Programmes and Strategies at Country Level Cape Town, August, 2006.
System for Transparent Allocation of Resources: STAR GEF Expanded Constituency Workshop Windhoek, Namibia February 17-18, 2015.
GEF Funding For Enabling Activities GEF Expanded Constituency Workshop 25 to 27 September, 2012 Yerevan, Armenia.
Evaluation in the GEF and Training Module on Terminal Evaluations
GEF and the Conventions GEF Expanded Constituency Workshop 1 to 3 November 2011 Cape Town, South Africa.
Accessing the GEF and the GEF Project Cycle GEF Expanded Constituency Workshop Managua, Nicaragua March 3-4, 2015.
BY: MOSES MASSAH PROGRAMME MANAGER: UNDP ENERGY & ENVIRONMENT THE UNDP/GEF – Small Grant Programme.
Focal Area and Cross Cutting Strategies – Land Degradation GEF Expanded Constituency Workshop July 19 – 21, 2011 Monrovia, Liberia.
1 STAR. GEF–5 – STAR  Following the Mid-Term Review of the RAF, GEF Council made specific recommendations: (a) Scenarios (options) for an expansion of.
Kiran Pandey Global Environment Facility Secretariat Resource Allocation at the Global Environment Facility.
System for a Transparent Allocation of Resources - STAR GEF Expanded Constituency Workshop 11 – 13 October 2011 Tashkent, Uzbekistan.
SUB-REGIONAL WORKSHOP FOR GEF FOCAL POINTS IN THE MIDDLE EAST, NORTH AFRICA, AND WEST ASIA CAIRO, EGYPT, OCTOBER 2009 System for Transparent Allocation.
1 System for Transparent Allocation of Resources STAR.
Institutional Structure of the GEF William Ehlers, Head, External Affairs Team American University Seminar April 9, 2012 Washington, DC.
System of Transparent Allocation of Resources - STAR GEF Expanded Constituency Workshop March 1 – 3, 2011 Kyiv, Ukraine.
GEF Project Cycle GEF Expanded Constituency Workshop 1 to 3 November 2011 Cape Town, South Africa.
Sub-regional Workshop for GEF Focal Points Nairobi, Kenya May 2007.
System of Transparent Allocation of Resources - STAR GEF Expanded Constituency Workshop February 15-17, 2011 Hotel Memling, Kinshasa, DR Congo.
OPTIONS AND REQUIREMENTS FOR ENGAGEMENT OF CIVIL SOCIETY IN GEF PROJECTS presented by Ermath Harrington GEF Regional Focal Point.
Sub-Regional Workshop for GEF Focal Points in the Caribbean Bridgetown, Barbados, June 2009 RAF Allocations Update (Report on the Implementation.
Presented at UNCCD COP12, Ankara, Turkey by the Land Degradation Focal Area Team Global Environment Facility GEF-6 Programming Update & UNCCD Enabling.
SUB-REGIONAL WORKSHOP FOR GEF FOCAL POINTS IN ASIA HANOI, VIETNAM MARCH 10-12, 2010 GEF-5 System for Transparent Allocation of Resources 1.
GEF Project Cycle GEF Expanded Constituency Workshop March 1-3, 2011 Belize City, Belize.
William Ehlers Team Leader, External Affairs GEF Familiarization Seminar Washington, DC January 17 – 19, 2012 Institutional Structure of the GEF.
Mark Zimsky Biodiversity Coordinator Regional Program Manager, Latin America and the Caribbean Senior Biodiversity Specialist GEF Familiarization Seminar.
GEF Training for New Agencies May 2015 Washington D.C. The System for Transparent Allocation of Resources (STAR) Sonja S. Teelucksingh.
System for a Transparent Allocation of Resources - STAR GEF Expanded Constituency Workshop 15 to 17 February 2012 Dead Sea, Jordan.
Sub-Regional Workshop for GEF Focal Points in Eastern and Southern Africa Sandton, South Africa, 3-4 November 2010 System for Transparent Allocation of.
System of Transparent Allocation of Resources - STAR GEF Expanded Constituency Workshop March 1 – 3, 2011 Belize City, Belize.
Financing Opportunities for Sustainable Energy through the Global Environment Facility (GEF) and IDB Access to Sustainable Energy For LAC: Solutions to.
Fourth Overall Performance Study
GEF Expanded Constituency Workshop
GEF Expanded Constituency Workshop
GEF Expanded Constituency Workshop
GEF Expanded Constituency Workshop
GEF Funding For Enabling Activities
System for a Transparent Allocation of Resources - STAR
GEF Small Grants Program
GEF governance reforms to enhance effectiveness and civil society engagement Faizal Parish GEC, Central Focal Point , GEF NGO Network GEF-NGO Consultation.
Civil society demands for key changes in GEF 5 Faizal Parish GEC, Central Focal Point GEF NGO Network GEF-NGO Consultation Washington DC 9 November.
GEF Expanded Constituency Workshop
GEF Small Grants Program
System for a Transparent Allocation of Resources - STAR
GEF Small Grants Program
GEF Small Grants Program
LDCF/SCCF Climate Change Adaptation Strategy
System for a Transparent Allocation of Resources - STAR
GEF and the Conventions
Update on the Resource Allocation Framework (RAF)
GEF Project Cycle Sub-Regional Workshop for GEF Focal Points
LDCF/SCCF Climate Change Adaptation Strategy
GEF-5 Focal Area Strategies
By: Inthavy Akkharath, Ph.D. 12th February, 2019
The GEF-7 System of Transparent Allocation of Resources (STAR) GEF Expanded Constituency Workshop Nadi, Fiji July 2019.
Presentation transcript:

GEF Training for New Agencies 1 November 2013 Washington D.C. The System for Transparent Allocation of Resources (STAR) Sonja S. Teelucksingh

Outline Background The Workings of the STAR model An Example Calculation A Short Quiz

Background The STAR is the current mechanism by which GEF resources are allocated to three focal areas – Biodiversity, Climate Change, and Land Degradation The Resource Allocation Framework (RAF) was adopted for GEF-4; The STAR updated the RAF and was implemented for GEF-5; implementation began in July 2010 When the STAR model is applied, this yields allocation amounts for countries for each of these focal areas

Objectives STAR aims to allocate scarce GEF resources within and among focal areas in order to: maximise impact on the global environment promote sound environmental policies and practices meet convention requirements match country driven priorities

Calculating STAR Allocations 1 Determine Available Focal Area Funds 2 Calculate Country Scores 3 Calculate Preliminary Country Allocations 4 Adjust for Floors and Ceilings 5 Obtain Final Allocations 6 Determine post-allocation Flexibilities

Available Focal Area Funds

Calculating STAR Allocations 1 Determine Available Focal Area Funds 2 Calculate Country Scores 3 Calculate Preliminary Country Allocations 4 Adjust for Floors and Ceilings 5 Obtain Final Allocations 6 Determine post-allocation Flexibilities

The Main Indices Global Benefits Index: measures a countrys relative share of GEF potential benefits that can be generated by a fixed amount of resource input into a focal area Country Performance Index: measures a countrys performance and capacity to deliver potential global environmental benefits GDP Index: designed to increase allocation of countries with a low GDP per capita

COUNTRY SCORE Global Benefits Index BiodiversityClimate Change Land Degradation Country Performance Index GDP Index The Country Score Country Score = GBI 0.8 CPI 1.0 GDP -0.04

Calculating STAR Allocations 1 Determine Available Focal Area Funds 2 Calculate Country Scores 3 Calculate Preliminary Country Allocations 4 Adjust for Floors and Ceilings 5 Obtain Final Allocations 6 Determine post-allocation Flexibilities

Preliminary Country Allocations Country Share = Country Score / Sum of Country Scores for all eligible countries Preliminary Allocation = Country Share * Focal Area Resources (less 20% set- asides

Calculating STAR Allocations 1 Determine Available Focal Area Funds 2 Calculate Country Scores 3 Calculate Preliminary Country Allocations 4 Adjust for Floors and Ceilings 5 Obtain Final Allocations 6 Determine post-allocation Flexibilities

Floors and Ceilings Focal Area Floor (US Mn) Ceiling Percentages Ceilings (US Mn) Climate Change 211%149.6 Biodiversity1.510%121 Land Degradation 0.510%40.5

Calculating STAR Allocations 1 Determine Available Focal Area Funds 2 Calculate Country Scores 3 Calculate Preliminary Country Allocations 4 Adjust for Floors and Ceilings 5 Obtain Final Allocations 6 Determine post-allocation Flexibilities

Final Allocations Adjustments for floors and ceilings means there is a surplus or deficit relative to the preliminary allocation This is then allocated among countries using the country scores Process iterates until the full amount has been allocated among countries

Calculating STAR Allocations 1 Determine Available Focal Area Funds 2 Calculate Country Scores 3 Calculate Preliminary Country Allocations 4 Adjust for Floors and Ceilings 5 Obtain Final Allocations 6 Determine post-allocation Flexibilities

Flexibilities and Marginal Adjustments Flexibilities relate to the utilization(not allocation) of GEF resources Countries are allowed to adjust their focal area allocations (but not their total envelope) according to different rules Total Allocation XAllowed Marginal Adjustment X 7 millionunlimited 7 < X 20 million < X 100 million1 million X > 100 million2 million

Example Calculation: Trinidad and Tobago BIODIVERSITYCLIMATE CHANGELAND DEGRADATION GBI CPI3.62 GDPI COUNTRY SCORE (GBI 0.8 CPI 1.0 GDP ) SUM OF COUNTRY SCORES COUNTRY SHARE FOCAL AREA ALLOCATION PRELIMINARY COUNTRY ALLOCATION FINAL COUNTRY ALLOCATION TOTAL ALLOCATION = 6.92 MILLION (FULLY FLEXIBLE COUNTRY)

Question 1 Given the following values, calculate the Country Scores for Country A for each of the three focal areas. BIODIVERSITY CLIMATE CHANGE LAND DEGRADATION GBI CPI3.60 GDPI COUNTRY SCORE???

Question 2 Country B has the following STAR allocations: Biodiversity = 10 million Climate Change = 6 million Land Degradation = 6 million (a)Does this country have full flexibility in the use of its resources? Why, or why not? (b) Is this country allowed any marginal adjustment across focal areas? If so, how much?

Question 3 During the STAR model simulations, Country C has preliminary allocations as follows: Comment on these values. (hint – floors!) BIODIVERSITY CLIMATE CHANGE LAND DEGRADATION PRELIMINARY ALLOCATIONS 110.7

Thank You Sonja S. Teelucksingh