TSF Upgrade Project Overview Resources Plans and Timetable

Slides:



Advertisements
Similar presentations
State Milestones Subsidized Insurance Workgroup High Level Timeline 2011 Jan 2011 Feb 2011 Mar 2011 Apr 2011 May 2011 Jun 2011 Jul 2011 Aug 2011 Sept 2011.
Advertisements

NuMI Offaxis Costs and Whither Next Stanley Wojcicki Stanford University Cambridge Offaxis workshop January 12, 2004.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
1 Warm Magnets Work Package Status J. Bauche, TE-MSC Technical Meeting, 9th January 2014.
AGATA Pre-processing team report AGATA Week, July 2008.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
Deliverables, Cost, Manpower, Schedule & Maintenance Su Dong CSC Readout Replacement CDR Oct/8/
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
Proposed LCLS-II SCU Schedule Soren Prestemon (LBNL) SCU 3-Lab Review Meeting December 16, 2014.
UK Project Plan (Finance & Risk) Alan Grant STFC DL RLSR 5 th April 2016.
Overview B A B AR L1 DCT Upgrade FDR Masahiro Morii Harvard University Scope of the Project Current Status Schedule  Commissioning.
ALICE Trigger Upgrade CTP and LTU Design Review ALICE CTP and LTU Upgrade Design Review CERN 27 th January 2016 Budget, time schedule, resources David.
CBETA Project ALD’s Cost and Schedule Review February 6, 2017
Chris Booth Sheffield 29th March 2006
Recommendation of Texas Test Plan Team to RMS
【New Draft】 France -Japan International Co-funding Joint call Schedule (revised version) APR. 11, 2017 Bpifrance / NEDO final meeting (week of 18/9) Announcement.
ALICE Muon Tracking Upgrade
HFT Overview Flemming Videbæk BNL 3/14/12 F2F LBNL.
Brief Status SPS Prototype PSB Prototype Installed in LS1
Status of the Planning Working Group’s (PWG) Efforts
SCHEDULE Nov 1st - Assembly Table Complete
NASPL Standards Initiative (NSI)
LLRF Controls Outline Requirements External Interfaces Schedule Design
CDR Project Summary and Issues
MicroMegas Mechanical Meeting --- Cern April 2014
Su Dong L1 DCT Upgrade Final Design Review Apr/11/03
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
CMS Goal of the experiment
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
ATLAS: Level-1 Calorimeter Trigger
13-block rotation schedule
LEGISLATIVE APPROPRIATIONS REQUEST (LAR) CALENDAR [2016‐2017]
2018/2019 School Calendar July August September October November
Iowa College Aid Processing System (ICAPS)
Due Dates subject to change. Watch for dashboard updates.
Planning Process Strategic Plan Operational Priorities
McDonald’s Kalender 2009.
CMX scope and functionalities
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
April May April May June July July June August Sept August
McDonald’s calendar 2007.
Strategic Planning Timeline Overview
Overall Project RAG Status:
XRN Nov 19 Release - Status Update
Release 3 Scope & Proposed Plan
Tropical cyclones movement
February 2007 Note: Source:.
Overall time schedule of SRF activities
XRN Nov 19 Release - Status Update
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
Proposal Organisation
XRN Nov 19 Release - Status Update
CALICE(-UK) Status Paul Dauncey 7 Oct 2004 Paul Dauncey.
McDonald’s calendar 2007.
PLAYMATES LEARNING CENTER CALENDAR
XRN Nov 19 Release - Status Update
XRN 4954 – MiR Drop 5 - Status Update
XRN 4927 – MiR Drop 4 - Status Update
SNS-PPU upgrades the existing accelerator structure
XRN Nov 19 Release - Status Update
2015 January February March April May June July August September
Cryogenic upgrade of B163, B165 & B253 Status Meeting 19th December 2018
Outsourcing for the BGC
Presentation transcript:

TSF Upgrade Project Overview Resources Plans and Timetable Hardware + Tests : Scott Kolya VHDL + Tests: Marc Kelly Bristol – Manchester - RAL Nicolo de Groot 11th April 2003 Final Design Review

From … To …

History September 2001: First proposal to PPRP. Based on daugthercards. Estimated costs £200k. Decision postponed. December 2001: Approval for prototype funding (£27k). Up to 60k for production. 2002: Trigger Upgraded postponed by one year, use this to make a cheaper board, no daughtercards, only 5 FPGAs. December 2002: New Proposal to PPRP

Funding Full production costs, estimated at £75k are approved by the PPRP, after we have demonstrated a working prototype An amount of £23k has been released to order components with a long lead time (FPGAs)

Current Status: Prototype 3 Chips, complete functionality needed for testing Boundary Scan OK Currently under test at SLAC (see Scott’s and Marc’s presentation)

UK Manpower Physicists / Management Roger Barlow, Manchester Nicolo de Groot, RAL Technical effort Jamie Boyd, Postdoc, Bristol, 100% Dave Mercer, Engineer, Manchester, 50% Scott Kolya, Postdoc, Manchester, 50% Marc Kelly, Bristol, 100% These are time integrated averages.

Schedule Item Target Date Prototype completes electrical tests Prototype System function tests (UK) Jan + Mar + Apr 2003 Full firmware for Fast Control/DAQ/Op Control Full firmware for Input Formatter Full firmware for Engines Apr 2003 System Test (SLAC) Apr + 1st Week May 2003 Parallel System Test at SLAC (with prototypes) June 2003 Final design complete Full System Test at SLAC Preseries tested at SLAC Early Sept 2003 Final delivery Oct 2003

Test Timetable The schedule represents our most optimistic timetable. It is dictated by the need to have a full system test before the end of the run (July) using a pre-series. In order to be able to do so we will instrument 6 of our prototype boards for the system tests. The test schedule will look like this: Last week April: completion engine firmware, completion test VHDL First week May: system tests at SLAC End of this week: start assembly of 6 test boards: 2 weeks End of May: boards to SLAC for full system test June: testing This assumes the prototype boards will be usable for the full system test. (so far, so good)

Production Timetable End June: final design, start production End August: pre series ready Early September: test at SLAC September: production October: delivery Currently beam back on September 5th. Can we speed things up ?

Summary Complete redesign of TDF completed. Prototype is there, testing. Confident that we can deliver. Some worries about the schedule. Maybe on time but under budget