EN/STI investigations during LS1 in TDC2 and TCC2 TDC2: -TCSC (collimator) to be replaced if … TCC2: -Targets Stations T2-T4-T6 *Monitors and Target equipment.

Slides:



Advertisements
Similar presentations
Amateur Radio Technician Class Element 2 Course Presentation ELEMENT 2 SUBELEMENTS T1 - FCC Rules, station license responsibilities T2 - Control operator.
Advertisements

TDC2TCC2 Réunion de chantier In sharepoint: workspace/tcc2wg/LS1%20worksite%20meeting/
TCC2/TDC2 consolidation WG ALARA COMMITTEE PREPARATION for Xmas stop activities S. Evrard T. Wijnands
NA YETS: schedule week by week S. Evrard.
Disadvantages Inefficient (only 30% efficiency).
Backwards Compatibility L4 – L2 W. Weterings LBCC - 14.
Radiation Protection aspects of the Switch-Yard operation V. Donate, G. Dumont, Joachim Vollaire on behalf of DGS-RP.
Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
February 12, ENGINEERING Landfills Transfer Stations Hazardous Waste Landfills Non Solid Waste Civil Design CONSTRUCTION Leachate Systems Tanks.
1/03/09 De 89 à 98. 1/03/09 De 89 à 98 1/03/09 De 89 à 98.
TraceTek Flashers. 2 Two simple units for visual leak detection In some applications it makes sense to eliminate wiring and expensive control room equipment.
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
Handling of radioactive material and waste M. Magistris and L. Ulrici (DG/SCR)
S. Evrard — EN/MEF IEFC Workshop, March 08, 2012 TCC2/TDC2 Shutdown Activities and Consolidation Plans On behalf of the TDC2/TCC2.
Problem Description The process of saucemix delivery is high in Non-Value Adding (NVA) activity (98%). The process highlights long distances travelled.

Alcohol’s Effects on the Mind and Body 8 th grade Lesson 2 Pages D12-D17.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
- Hearing Session - Marion Picard - July 28 th, 2011 S TATUS OF H I R AD M AT S AFETY F ILE Outline  Safety file Descriptive part Hazard inventory  Demonstrative.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
N-TOF review HVAC and cooling systems YB-JIG 15/06/07.
STATUS REPORT: ALIGNMENT OF COLLIMATORS P. BESTMANN /O. ABERLE Collimation Working Group 26/09/2011.
Energy efficiency With energy consumption rising, it is important that industry, transportation and consumers in their homes use of energy more efficiently,
NA YETS: schedule week by week S. Evrard.
SPS Dump relocation Radioactive Dump storage alternatives JL GRENARD EN-HE
LHC-YETS Coordination meeting #9 24 th November, 2015.
Working Group 3 Murmansk. SC structure – Assessment context has to be more elaborate and detailed – Optimization. Provide justification based on the document.
System of control of radioactively contaminated metal scrap in Lithuania Gendrutis Morkūnas Radiation Protection Centre Kalvarijų 153, LT-08221, Vilnius,

3:00. 2:59 2:58 2:57 2:56 2:55 2:54 2:53 2:52.
The HiRadMat Facility Outline  Location  Status  WANF dismantling  Beam line  Experimental area  Schedule  Project management S. Evrard – EN/MEF.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
TCDI Project Budget Update François-Xavier Nuiry May 10 th 2015 EN-STI-TCD.
。 33 投资环境 3 开阔视野 提升竞争力 。 3 嘉峪关市概况 。 3 。 3 嘉峪关是一座新兴的工业旅游城市,因关得名,因企设市,是长城文化与丝路文化交 汇点,是全国唯一一座以长城关隘命名的城市。嘉峪关关城位于祁连山、黑山之间。 1965 年建市,下辖雄关区、镜铁区、长城区, 全市总面积 2935.
Test beam check list Michael JECKEL EN-EA-EC. Content: Safety & Radiation Protection Arrival Access Installation Departure Michael JECKEL EN-EA-EC.
Repair of MCWV magnets (TT84 – M2). Works on three magnets : MCWV 693, MCWV 697, and MCWV 701 and the associated XABS Cause of the repair : XABS jam into.
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
Environmental protection
I. Bergevoet - Training preparation
ENVIRONMENTAL PROTECTION External EHS Expert Panel Workshop
Linac4-PSB 160 MeV connection readiness review
Test beam check list Michael JECKEL EN-EA-EC.
Identification of the unused cables
Space Management and Logistics during LS2
Forecasts for waste and radioactive material storage
a smooth sea never made a skilled sailor
n_TOF “Draft” plans for YETS and LS2
EN-HE SPS works during EYETS
SPS EN-CV Planning LS (initial draft)
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
EN-STI activities in LHC during EYETS
Disadvantages Inefficient (only 30% efficiency).
EYETS 2016/2017 Activities SPS Access system Maintenance and Evolutions Access system EYETS 2016/2017 EDMS:
Test beam check list Michael JECKEL EN-EA-EC EDMS:
GIS Portal Racks Project
Disadvantages Inefficient (only 30% efficiency).
Top Fire Protection Services Ottawa available on Dubinskyconstruction
مدیریت استراتژيک منابع انسانی
Report to the select committee ON APPROPRIATIONS infrastructure delivery in the wced fourth quarter 2017/18 30 May 2018.
Experimental Areas – LS2 planning
Ռազմավարական կառավարում
Disadvantages Inefficient (only 30% efficiency).
Implementation of RP training ranks in SPS and NA_target
Ulf Odén WP Manager Target System
Example: Designing an asynchronous prod. line
LS3 Study & Readiness Meetings
East Hall under construction
n_TOF Target #3 Baseline Design
Presentation transcript:

EN/STI investigations during LS1 in TDC2 and TCC2 TDC2: -TCSC (collimator) to be replaced if … TCC2: -Targets Stations T2-T4-T6 *Monitors and Target equipment *Cabling *Flow meters Annual maintenance To keep in mind for each operation: waste, contamination

TCSC in TDC2 To be replaced only if budget is allocated and dripping acid is stopped from falling onto the TCSC!! Needs: -RP -Transport -VSC -STI Conflicts: -Large radioactive vessel to transport

TARGET Stations T2-4-6 in TCC2 Moniteur TBIUBACMoniteur TBID Moteur blindage mobile Patch Panel Ventilateur Switchs Blindage mobile

Monitors and Target to replace Needs: -RP -Transport -STI Conflicts: -Large amount of radioactive assemblies to transport (x9) Only if BI budget accepted!

Cabling on Targets to replace Needs: -RP -BI -VSC -STI To replace To remove To keep

Flow meters to replace on T2-4-6 T2-T4 T6 Needs: -RP -CV -STI

Annual maintenance AccèsLigneDirec.Elec.Equipement Déplacement Fin de course RefroidissementVideRemarques Hor.Vert.Hor.Vert.DébitTemper. BA 80TCC2DBA 80BAC T2/ / /// TBIU T2 / /// TBID T2 / /// Eau T2//// / Ventilateur T2//// // Blindage D T2 / //// Blindage G T2 / //// BA 80TCC2DBA 80BAC T4/ / /// TBIU T4 / /// TBID T4 / /// Eau T4//// / Ventilateur T4//// // Blindage D T4 / //// Blindage G T4 / //// BA 80TCC2DBA 80BAC T6/ / /// TBIU T6 / /// TBID T6 / /// Eau T6//// / Ventilateur T6//// // Blindage D T6 / //// Blindage G T6 / //// Palan pont/ / /// TDC2G TCSC //// // TDC2G TCSC //// //