Linac Test Area Instrumentation

Slides:



Advertisements
Similar presentations
Liquid Hydrogen Absorber
Advertisements

MTA Instrumentation M. Haney University of Illinois at Urbana-Champaign 25 February 2004.
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Parameter List Edda Gschwendtner Introduction Parameter list for sub-systems of MICE.
Feb. 9, 2002 Mucool FNAL LH2 Absorber R & D Mary Anne Cummings NIU Illinois Consortium for Accelerator Research (IIT, NIU, UC, UIUC), U Miss Oxford U.
8/12/2002 Bob/RolAbsorber Review/GH2 status1 Gaseous H 2 Absorber Status IIT and Muons, Inc. Chuck Ankenbrandt, Ed Black, Kevin Cassel, Bob Hartline, Rol.
Cooling Channel Count Recap Cooling channel components # Engineering? Absorber: temperature 8*3 yes pressure 2*3 yes He temp 2*3 level 8*3 yes length (optical)
GlueX Solenoid Recent progress and Coil cold tests Paul Brindza September 9, 2004.
LH2 Absorber Design Mary Anne Cummings MICE Safety Review LBL Dec 9, 2003.
Paul drumm daq&c-ws august/september Cooling Channel.
The issue: A non-standard thin window design  No closed form expression for maximum stress vs. volume pressure  FEA (finite element analysis): geometry.
MICE LH2 Operating Parameters Mary Anne Cummings MICE October ‘02 LBL Oct. 24, 2002.
MICE Safety System DE Baynham TW Bradshaw MJD Courthold Y Ivanyushenkov.
MICE AFCSWG Safety Review Summary Mary Anne Cummings Dec. 17, 2003 MICE Video Conference.
Slow controls and instrumentation of MICE 1.Physics and systematics 2.How the state of the cooling channel gets defined 3.Engineering for the signal readout.
MICE LH2 Absorber Instrumentation - What is necessary/ desirable? (physics calibration) Temperature inside the the absorber Temperature inside the absorber.
LH2 Absorber Heat Load and Homeostasis. What has happened before… 1.Huge LH2 volumes, low heat deposition: Bubble chambers 2.Small LH2 volumes, low heat.
11/26/2002Edgar L Black IIT MICE Video Conference November 27, 2002 Summary of safety implementation for proposal.
MuCool Test Facility Instrumentation Update M. Haney, D. Errede, Z. Conway University of Illinois at Urbana-Champaign 12/13 August 2002.
Controls Review  Want to record a full configuration of the experiment at every possible “event”, including controls data.  Event trigger = accelerator.
LH2 Absorber Design Mary Anne Cummings MICE Safety Review LBL Dec 9, 2003.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
Goal of MICE:   out /  in of   Assuming a standard (or agreed to) definition of 6-D cooling.  We can also assume that the tracker can give.
LH2 Absorber Design Mary Anne Cummings MICE Safety Review LBL Dec 9, 2003.
Mucool LH2 Absorber Progress and Pauses Mary Anne Cummings FNAL August 12, 2002.
Feb Absorber/coil instrumentation and controls  Subsystems Absorbers RF Magnets  Monitoring/safety  Data acquisition: Information on system.
Absorber Design Details Mary Anne Cummings MICE MEETING Columbia June 13, 2003.
Internal Cryomodule Instrumentation Sensors, Actuators, Heaters, and Wiring ERL Main Linac Cryomodule 9/5/2012 Peter Quigley Internal Design Review.
17 March 2005Edda Gschwendtner1 MICE Cooling Channel: Can we predict cooling to ? Edda Gschwendtner Challenge Systematics Cooling Channel Beam Line.
Cooling Channel Instrumentation Update M. Haney University of Illinois at Urbana-Champaign 6 February 2004.
Linac Test Area Instrumentation Update M. Haney, D. Errede, Z. Conway University of Illinois at Urbana-Champaign 14 June 2002.
MICE CM February 08Jean-Sébastien GraulichSlide 1 Detector DAQ Hardware Status o Introduction o Preliminary list o Plan for action o Summary Jean-Sebastien.
MTA Cryogenics: Where We Are The Work of Fermilab AD/Cryo Barry Norris, Christine Darve and a host of wonderfully talented Cryogenic Personnel John Thompson,
Internal Cryomodule Instrumentation ERL Main Linac Cryomodule 10/10/2015 Peter Quigley, MLC Design Review.
Vacuum system.
Instrumentation and Controls Test Plan Review 17 th February 2012 Roy Preece (STFC RAL)
MP Questions for LE eCooling. Why talk about this now? Is there additional equipment needed, not yet considered? (nor costed) Interfaces to systems that.
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
Controls for Particle ID/tracking in MICE 1.Physics and systematics 2.Controls types 3.Controls list 4.Needed for particle ID/tracking M. A. Cummings May.
Booster and Collider SC magnets. Design & prototyping of UHV and cryostat systems for Booster and Collider A.Smirnov JINR, Dubna, Russia NICA Machine Advisory.
1 HIGH ENERGY ACCELERATOR RESEARCH ORGANIZATION KEKB Review Committee/ NAKAI Hirotaka KEK Crab Cavity - Cryogenics - KEKB Crab Cavity Group - presented.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber.
Definition of Work Area H. Hayano, KEK EDR-KOM-cavity at DESY Issues of Cavity and Cavity Package, Work Package discussion.
Developments of the FETS Ion Source Scott Lawrie.
MICE LH2 Absorber Safety Mary Anne Cummings Edgar Black (IIT) Abingdon, UK Oct. 30, 2003.
Controls and monitoring in MICE 1.Physics and systematics 2.Controls types 3.Controls list 4.Data record M. A. Cummings April 2004 CERN.
LEPTA: Low Energy Particle Toroidal Accumulator Presented by: Mkhatshwa S. L. Nkabi N. Loqo T. Mbebe N. Supervisor: A. Sidorin SA STUDENT PRACTICE 2010.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Systematic studies on pellet beam production M.Büscher, A.Gerasimov, V.Chernetsky, P.Fedorets, A.Dolgolenko,V.Balanutsa, A.Boukharov, L.Gusev, S. Mineev,
Extra / Discussion Slides. 2 1.Helium Top Fill Port Add extra CF/ISO flange as collar so that the weld-region is not disturbed 2.Helium bottom FillCF.
LCLS-II Prototype Cryomodule Darryl Orris 21 January 2015 Final Design Review: Instrumentation.
SC Activities at IAP Frankfurt
Instrumentation for status monitoring of SST-1 superconducting magnets
Existing Prototype Test Facility (PTF) and planned Series Test Facility Schroeder, Claus Cryo-Review Darmstadt
MuCool Test Area Dedicated facility built at the end of the Linac to address MuCool needs RF power 805MHz, 201MHz)
Integration of the e+ elements
Recent developments in the Vacuum Control Software
XFEL Vacuum System Commissioning
Mathew C. Wright October 2016
Linac Test Area Instrumentation
SHMS Cryogenics and Q2(Q3Dipole) Cool Down
UITF MPS system requirements
MuCool Test Facility Instrumentation Update
SNS PPU Cryomodule Instrumentation
Installation and Beam Test Schedule
ISRC and LEBT Vacuum System Design
UITF Conduct of Operations Review
SNS PPU Cryomodule Instrumentation
ACCSYS Collaboration Board Triestre, 3rd october 2017
Presentation transcript:

Linac Test Area Instrumentation D. Errede, M. Haney (UIUC) M. Shea (FNAL) MuCool Feb 6, 2002

Problem: What are the signals to be readout from the LTA? Beam Line (Carol Johnstone) Beam Properties Measurements (CJ) Cryogenics (Barry Norris) A. H2 B. He Experiment A. Absorbers (Mary Anne Cummings, Edgar Black) B. RF Cavities (Al Moretti) C. Solenoid (Al Moretti) 2/17/2019

Beam Line Elements 750 KeV Chopper 1 dipole magnets currents 5 # signals 750 KeV Chopper 1 dipole magnets currents 5 quad magnet currents 13 stripping foil 1 collimater positions - 2 units 8 ion chamber 1 (in front of beam dump) 2/17/2019

Beam Properties Measurements # signals Tune Parameters ? data set Beam Position Monitors 20-40 Toroid Beam Current Monitor 1 (slow response) Fast Beam Current Monitor 1 (fast response) Beam Loss Monitors 5-10 2/17/2019

Cryogenics Helium # signals inlet temp (carbon) 1 outlet temp (carbon) 1 inlet temp (platinum) 1 outlet temp (platinum) 1 inlet pressure 1 outlet pressure 1 He level 2 N2 level 1 solenoid coil temperature (platinum) 4 2/17/2019

Cryogenics Hydrogen inlet temp(carb) 1 outlet temp(carb) 1 inlet temp (plat) 1 outlet temp (plat) 1 temperature other 6 inlet pressure 1 outlet pressure 1 pump delta press 1 H2 supply press 1 H2 vent press 1 H2 vent pipe press 1 cryo vacuum press 2 pump status (run/not) 1 pump voltage 1 pump current 1 pump speed 1 heater voltage 1 heater current 1 heater power 1 beam permit 1 hazardous gas 10 O2 deficiency hazard 8 2/17/2019

Experiment - Absorber #signals temperature 12 pressure transducers see under cryo photogrammetry (??) 2 laser occlusion sensor (??) 4 piezo vibration sensors 2 strain gauges 2 bolometry ?? O2 sensors 3per each of 5 flanges 15 H2 sensors on exhaust line 10 CCD camera 2 images MICE channels ?? 2/17/2019

Experiment - RF, Solenoid #signals solenoid current 1 rad level on chipmunks 10? Cavity forward power 1 cavity reflected power 1 cavity RF level (E-field?) 2 cavity vacuum level 2 timing channels 10? 2/17/2019

Picture of cryo/absorber assembly 2/17/2019

Time schedule 2/17/2019