J bathroom/ hi bedroom/ I kitchen

Slides:



Advertisements
Similar presentations
Drive-Up Appeal Shrubs & trees Landscaping Front door Outside paint.
Advertisements

Punch! Pro Platinum Home Design
ADA Enhanced Condo Client: Kelly Heller Blind 48 years of age Sculptor
By: Stephanie Marquette Kishwaukee College To begin designing my own house, I started researching some floor plans online. After looking at some.
INTD 59 bathroom design basics. five basic steps in bath design 1.gathering client & project information 2.setting priorities 3.researching and selecting.
4/30/20151 Universal Design – Remodel Kitchen and Bath Tom Muxie.
Chapter 20 Plumbing Plans.
Wilson School Construction 2014 Tearing out the old courtyard to put in the new sewer line.
Hogan Residence Bathroom Remodel Valued Repeat Customer Kitchen Remodel (see other presentation) Basement Bathroom Addition (see other presentation) Upstairs.
DGET 1360 Nielson Homes Shady Meadows Design Competition Finished Sq. Ft. Rambler.
House Plans and Home Design. House Plan Symbols Wall: Window: Door: Shower: Tub: Toilet:
IET 120 CONSTRUCTION PROJECT Name: David Marcum. Dwelling  Number of Floors 2 Place image of your floor plan in this space.
7.02 Bathrooms.
Bathrooms SHI 7.02 Explain the essentials of home baths.
BATHROOMS Objective Bell Ringer 11/4  Work with your table groups to brainstorm and make a list of at least 10 technological “gadgets” used in.
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
Week 3. Electrical Code 1. all electrical outlets run off a pigtail from main line 2. Each Circuit is wired directly into circuit panel - no junction.
Room Relationships and Sizes
Chapter 12 Sleeping Areas Types of Sleeping Areas Bedrooms Average size – 100 to 200 square feet 3 items must accommodate a minimum size bedroom –Single.
BRVFD & RS Training Facility Proposal 05/07/2009.
St. Peters School Carpeting and Refresh project October 5,6 and 7 th St. Peters School Carpeting and Refresh project October 5,6 and 7 th
Affordable housing project
Final Assignment part 1: revise stairs Some minor markups.
Bathroom Notes Chapter 24. Types of bathrooms: Master Bath –A full bath –Part of the master bedroom area.
By Angela Forte, Michelle Gagnon, Kerri Morse, & Sam Oosterman.
KITCHEN LAB DUTIES. YOUR RESPONSIBILITIES Our kitchen works as a team, between your own classmates and the four other classes that use it every day. You.
Introduction to Plan of a building Instructor Engr Kamran Khan Department of civil engineering City University Peshawar.
MY DREAM APARTMENT Well, this is my dream apartment. It is in the skyscraper in the centre of the city. My apartment is two-room flat with a big terrace.
Kitchens, Laundry Areas and Baths Chapter 22. Objectives 1. Explain basic principles for designing efficient kitchens, laundry areas and bathrooms. 2.
7.02 Bathrooms. Types of Baths _________________/powder room - sink & toilet only _________ bath - sink, toilet, ______________/shower ________ bath –
House Project.
BAY AREA, CA HOME CLEANING TIPS CONTACT US:
Standard  Students will prepare residential floor plans.
FD Iskandar Sell Your Home Quickly And Lucratively
Rosemead.
7.02 Bathrooms.
Safety – Child proofing at home
Dream Home Designing Process
MICROSOFT PROJECT MODULE 2 - BUILD A HOUSE.
Drawing Floor Plan.
Assembly And Installation Of Ikea Kitchen Cabinets
TOT SPOT proposal.
Wasatch County Junior Turkey Program
Basement Renovations - Solutions and Ideas
Take Out Trash Laundry Dust Bedroom Big Bad Outdoors!
Features, Renovations and Improvements
Amazing Natural Light & Great Outdoor Living
Objective 7.02: EXPLAIN the essentials of home baths
Bathroom Fixtures and Design
Electrical Gas Plumbing Heating & Cooling
Your Bathroom Remodeling Priority? CALL (888) AND WEBSITE IS
A Guide To Renovate Your Bathroom & Kitchen
realestatemarket.com.
F Bathroom and E bedroom wall
Both D bathrooms and e kitchen What makes you special!
Consulting Captains, LLC
RISER PROJECT L, m, l/m kitchen.
G kitchen What makes you special!
Kitchen Cleaning Jobs.
L.E.A. Data Technologies Introduction.
n/o back to back kitchens
A/B and h/i TIER back to back bathrooms
RISER PROJECT F bathroom.
C bathroom/AB and B Kitchens
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Building standards Mr. Da Silva.
Floor Plans and Symbols
Welcome to Middle School Art
Forestbrook Middle School
CREEKWOOD FARMS INCLUDED FEATURES
Presentation transcript:

J bathroom/ hi bedroom/ I kitchen RISER PROJECT J bathroom/ hi bedroom/ I kitchen

Why you are special! Where there is an “HI” combined unit, entry to the j kitchen will be thru the “I” bedroom Where there is an “I” kitchen, entry will be thru the “j” bathroom

The lay of the land HI J J

Wall opening for pipe exposure Bathroom

Bathroom fixtures out with the old! Not to city of Chicago code To city of Chicago code

Throne/water closet/commode, by any other name, is still a toilet! before after

Sloan valve Toilet replacement We can provide a two piece toilet with a round bowl that is comfort (ada) height The cost for this is $220 If you prefer to get your own toilet, let the office know and we will have the plumber come to your unit to measure the rough-in dimension. You can then order it with that information it must be in your unit the day that we start your plumbing The association will provide the installation for the one you purchase , as long as there is no feature requiring wiring

Tile replacement In each unit, where we will remove a wall with tiles on it, the association will Reimburse that owner up to $187 to buy tiles of their own choice. The condo owner will make sure the tiles are in their unit at the time the contractor is ready to install them. Provide an invoice to be reimbursed.

Tile replacement continued The association will pay for the removal and the installation of 55’ of ceramic tile surrounding the tub. If you choose to not use the association contractor/want to install tiles of other material, or want more square footage, A reimbursement check will be provided for up to $995. provide a copy of your invoice.

TILE REPLACEMENT continued if you have re-done your bathroom, and still have enough extra tiles left over, from your remodel, have them in your unit when the riser work is finished there. The selected contractorS will install ceramic tiles, ONLY. If you have glass or stone (marble, granite, etc.) tiles then, the owner will need to negotiate with the contractor for the installation. Submit an invoice and, the association will reimburse up to $995.  

Some positives… Cleaner water Hotter water Better water pressure Shut-off valves are concealed No more sloan valve toilet noises in the middle of night!

General information Work will be done from 8am until 5pm, Monday thru Friday Water will be shut off, on that riser throughout the workdays At the end of each day there will be water in the bathroom fixtures for “j” and in the kitchen of “I” There will be a lot of noise The service elevator will be used intermittently to bring in pipes, etc. When riser is complete, the walls affected will be patched and prime coated

Time line (using the term loosely) The contractor will start removing the wall sections from the top floor down, on Monday October 29, 2018 Soon after, the plumbers will follow them. the plumbing and construction will take approximately 4 weeks This estimation does not include any tile replacement

How to prepare Provide a copy of your unit key. Not providing a key is not an option If you do not have a duplicate key – have one made All keys will be kept until after that riser is complete – you may not pick them at the end of each day Keys will be kept in the management office

How to prepare - continued Plumbers and contractors will be coming in and out of your units throughout the project If you have pets - who want to bolt out the front door - put them behind a closed door or gate Put a post-it note on your door saying how many and what type of animals that you have, that are ambulatory Cover the furniture in the area where work is being done

How to prepare - continued All of these ‘Housekeeping’ items should remain, in place, for the duration of the project This applies to all bathrooms whether the wall has been removed or not! Remove items in and on your vanity cabinets Remove everything in the shower/tub that is on the plumbing wall (shampoo caddy etc.) Remove everything on or around your toilet

How to prepare - continued “I” kitchen remove everything from under your sink Remove everything from your dishwasher Clear the counter around your sink If your bathroom wall is being removed, move any over-the- toilet storage units or artwork from the plumbing wall Clean out medicine cabinet Clear a 42” wide path from your entry door to your bathroom

How to prepare - continued HI Units REMOVE ARTWORK FROM THE BEDROOM WALL COMMON TO THE “J” bathroom Remove any furniture on that wall Clear a path from your entry door to the bedroom wall Remove any furniture on the bedroom wall common to “J” bathrooms Leave a clear path 40”-48” next to that wall

After… When the plumbers and contractors are finished in your unit- the demolished walls will be patch and prime coated. If your tile was removed, The association will not be responsible for scheduling/coordinating the tile work. Only you know what your schedule is. We have supplied the names of two contractors we have worked with many times. Because of so many unexpected delays, we don’t recommend you reaching out to a contractor until all of the work is complete.