MOD_23_18 Payment and Invoice Day Exchange Rates for Part A Currency Cost Calculations Post Cutover 16th August 2018.

Slides:



Advertisements
Similar presentations
MOD 326 – Allocation of Unidentified Gas Following the Appointment of the AUGE August 2010.
Advertisements

Sales day book & Sales ledger Chapter 14. Recap… When goods are paid for immediately they are described as ‘_________ sales’. We have received the ___________.
MOD_14_12 Reference to MO Status for VTOD. Context (1)  Mod_47_08 V2  Approved by the RAs in May 2009  Implemented in the SEM systems in November 2010.
Mod_03_12 Alignment of TSC with Revised VAT Arrangements 29 th May 2012.
Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
Unit 6: Financial Accounting Initialization Contents: Tax system. Currencies. Perpetual inventory/ non-perpetual inventory system.
Short Term Testing Mod 65_08 Modification Committee 25 th November 2010.
Long Term Entry Capacity & User Commitment Review Group th September 2008.
The Entry Capacity Transfer & Trade Methodology Statement Transmission Workstream
Reznichenko Ilya 10-B.  The use of plastic cards as a means of payment is firmly embedded in the economic turnover of organizations and individual entrepreneurs,
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
INTRA-DAY TRADING Modification Development 5 April 2011.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Standing Committee on Finance public hearings on the Draft Taxation Laws Amendment Bill, 2012 (22 August 2012) 1.
Mod_02_13 Registration of Charges Legal Spending Update.
BILLING SCHEDULES, CURRENCY, PROPOSALS APPROVAL. BILLING SCHEDULE XXXXX.
© 2014 Cengage Learning. All Rights Reserved. Learning Objectives © 2014 Cengage Learning. All Rights Reserved. LO1 Explain the purpose of entering the.
Overview: Code Modification Process Summary. PROPONENT Step 1 - Proponent has a code change in mind MODIFICATION (Mod) Step 2 - Proponent enters the mod.
INTERCONNECTION GUIDELINES
MOD_04_17 Solar in the SEM 9th June 2017.
Grid Code Development Forum – 6 September 2017
SUBMISSION ON AARTO BILL, 2015
© 2014 Cengage Learning. All Rights Reserved.
Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt Version 2
Agreed Procedure Updates
Part B Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt
Net Inter Jurisdictional Import Submission
Review of the requirements regarding Unsecured Bad Debt within I-SEM
Update to Unit Under Test Process
MOD_09_18 Interim Credit Treatment for Participants with Trading Site Supplier Units 13th March 2018.
MOD_21_18 Application of Settlement Reallocation Agreements to Market Operator Charges and Settlement Document Definition and Usage 21st June 2018.
Richard Fairholme Transmission Workstream, 2nd October 2008
The Necessary Criteria for a UNC Modification Proposal
MOD_10_18 Amendment to Capacity Settlement Statement Publication from Monthly to Daily 13th March 2018.
Ex Ante Quantities Deferral
Department of Rural Development and Land Reform
Notification of Suspension to SEM NEMOs
Mod_25_18 Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt
Interim Suspension Delay Periods
Mod_34_18 Removal of Make-Whole Payments for biased quantities and negative imbalance revenue, and small clarifications to determination of Start Up Costs.
Modification to Part B Agreed Procedure 17
© 2014 Cengage Learning. All Rights Reserved.
Mod_38_18 Limitation of Capacity Market Difference Payments to Loss Adjusted Metered Quantity. 12th December 2018.
CMC_04_19 Finalisation of Exchange Rate in Auction Information Pack
MOD_13_17 V2 Deferral of SEM NEMO Credit Reports and Non-acceptance of Contracted Quantities 13th March 2018.
Credit Cover Signage and Subscript Correction
Mod_37_18 Housekeeping 12th December 2018.
DN Interruption & Charging
Agreed Procedure Updates Version 2
Further Credit Modification Proposals
Summary Issue Modification Aim Effect of the mod Impacts
xoserve Theft of Gas Team
Richard Fairholme Transmission Workstream 4th September 2008
Modification 0448 – European Driven Change Process Flow Diagram
Entry Overrun Calculation
UK Link Replacement Programme additional supporting UNC modifications
Mod_21_18v2 Application of Settlement Reallocation Agreements to Market Operator Charges 16th August 2018.
MOD_03_19 Amended application of the Market Back Up Price if an Imbalance Price(s) fail to calculate Energia.
Part B Suspension When Suspended Under Part A
Amendments to the Rental Housing Act, 1999 (Act No. 50 of 1999).
Nexus Workgroup Mod 0473 Presentation
Gemini Code Contingency Review
Recovery of Costs due to Invalid Ex-Ante Contracted Quantities in Imbalance Settlement 25th January 2018.
Implementation Approach Distribution Workgroup – June 2014
Correction to No Load Cost - “and” vs “or”
Payment methods in international trade
Mod_10_19 Removal of Negative QBOAs Related to Dispatchable Priority Dispatch Units from the Imbalance Price 27th June 2019.
Correction to COP and clarification to CNLR
Market Back Up Price Reference Corrections
Capacity Market Code Modifications
Presentation transcript:

MOD_23_18 Payment and Invoice Day Exchange Rates for Part A Currency Cost Calculations Post Cutover 16th August 2018

Summary Information Under Part A the Trading Day Exchange Rate for the Invoice Day and the Payment Day are used to calculate Invoice and Payment Period Currency Costs in accordance with Agreed Procedure 15 For dates after the Cutover Time, there will not be a Trading Day Exchange Rate under Part A; however, it will still be necessary to calculate Currency Costs and this is not currently catered for This proposal seeks to specify that the rate used is the Part B Trading Day Exchange Rate which addresses the issue and avoids having differing rates under Parts A and B for the same date given that Part B is a D-1 Nordea rate and Part A is a D-2 ECB rate The proposal does this by specifying that the Invoice and Trading Day Exchange Rates under Part A Agreed Procedure 15 for dates after the Cutover Time are the Part B Trading Day Exchange Rate Note that under AP15 the Invoice Day Exchange Rate is defined as the Trading Day Exchange Rate for the relevant day in a specific definition and the Payment Day Exchange Rate is treated differently by specifying in the calculation that the Trading Day Exchange Rate applies

Legal Drafting

Modification Proposal Justification and Implications of not Implementing This proposal is required to ensure that Currency Costs for Part A can be calculated for Billing and Capacity Initial and Resettlement Periods which are Invoiced or for which payments are due after the Cutover Time If this proposal is not implemented then there will be no provision for exchange rates to use to calculate Invoice or Payment Period Currency Costs for such periods and it will therefore not be possible to calculate those Currency Costs