LHC dry-runs (BE-BI view)

Slides:



Advertisements
Similar presentations
Guy Crockford AB/OP OP Days, 7/2/2007 LHC Specific BI Systems This presentation reviews the status of the specific BI systems for the LHC. The work plan.
Advertisements

Tuesday 10 th April - morning Access for:  point 3 Jerome Landaro TCSG one jaw didn't move  point 5 Qps expert on RPMBB.UJ56.RCBXH1.R5  point 6 TCDQ.
E. Hatziangeli – LHC Beam Commissioning meeting - 17th March 2009.
Distributed BI Systems BLM, BPM, BTV and BRAN Laurette Ponce & Fabio Follin Thanks to: Anthony Rey, Enrico Bravin, Rhodri Jones, Bernd Dehning, Mariusz.
V. Kain, G.H. Hemelsoet AB/OP1Nov 08, 2007 LHC Injection System V.Kain, G.H. Hemelsoet, AB/OP Input from: E. Carlier, B. Goddard, J. Wenninger What do.
LHC Utilities & Facilities WAO Daejeong 12/04 – 16/04/2010 Markus Albert on behalf of LHC Operations.
BCT for protection LHC Machine Protection Review April 2005 David Belohrad, AB-BDI-PI
LHC Sector Test1 LHC Sector Test - Beam IntroductionMike LamontIntroductionMike Lamont Proposed tests with beamBrennan GoddardProposed tests with.
LHC BLM Software revue June BLM Software components Handled by BI Software section –Expert GUIs  Not discussed today –Real-Time software  Topic.
Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
BP & RS: BIS & SLP for AB/CO Review, 23 h Sept Realisation of the interlocking between SPS, LHC and CNGS and open issues Beam Interlock Systems.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Nominal Workflow = Outline of my Talk Monitor Installation HWC Procedure Documentation Manufacturing & Test Folder Instantiation – NC Handling Getting.
Real time performance estimates of the LHC BPM and BLM system SL/BI.
Last night Lhc closed 15:00 Beam on Ti 8 /Ti2 Prepulse check synchronisation ok with LHCb /RF 17:00 Open Point 4 PC’s and RF 19:00 LBDS energy tracking.
Post Mortem Workshop Session 4 Data Providers, Volume and Type of Analysis Beam Instrumentation Stéphane Bart Pedersen January 2007.
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
The Dashboard The Working Conditions The Common Chapters State What’s Next.
E. Hatziangeli – LHC Beam Commissioning meeting - 3 rd March 2009.
RF acceleration and transverse damper systems
LHC Beam Commissioning Meeting V. Kain & R. Alemany
DRY RUNS 2015 Status and program of the Dry Runs in 2015
LHC Commissioning with Beam
Outcome LBDS Dry Run – week 7
BE-BI Software for LINAC4
Saturday 24 March 2012.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
eLTC - Controls Summary
Mike Lamont on behalf of the LSA team
Monday 14th March Second fill with pilot + 3 nominal bunches
Operational Issues L. Ponce.
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
Thursday morning – optics correction
Summary of Week 11: 14 – 21 March
LHC Status Su Morning 17-April R. Assmann, B. Holzer et al
Distributed BI Systems
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
Dry Run 0 Week 13: BI test of...everything circulating beam: all fixed displays and BI applications OP directories for 2009, concentrators running Need.
Lost at 12:05 to power converter (RTQX2.R1) problem
Tuesday 20 March 2012.
Week 35 – Technical Stop and Restart
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Conditions Cool-down of remaining sectors
Wire almost entirely through beam before BLM triggers dump
450 GeV Initial Commissioning with Pilot Beam - Beam Instrumentation
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Summary Thursday h21: Stable beams fill #1303.
Aims for the week Recover from technical stop and precycle at 10A/s
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
1v1.
Can operation put the MPS in a unsafe state?
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
LHC BLM Software audit June 2008.
Beam Interlocks for Detectors and Movable Devices
Thursday 17/3 Morning: evaluation of the origin of the timing problem occurred over night and the implication on machine protection 09:00 – 12:00 Dry ramp.
Global System Overview
Monday :15 fill 3523 dumped by BPMs IP6
LHC Morning Meeting - G. Arduini
Sat 18/3 - Ramp to 4 TeV Again glitch on the safe beam flag for beam 2. Cause identified: noise on BCT2B giving values above the safe beam limit (2.4×1010.
Summary Tuesday h23: Machine closed. Precycle started.
New page for summary of test status
Tuesday End of fill 1393 Movement of suspicious Roman pots OK
15/12/2009 Vacuum interlock in sector 78 understood  out-gassing of a Penning gauge ignited as a result of ionization or dust arcing In conclusion: NO.
LHC Systems Providing Post-Mortem Data
Daniel, Gianluca and Belen (for the Collimator team)
What systems request a beam dump? And when do we need them?
Monday 152 bunch operation summary
Tuesday
Presentation transcript:

LHC dry-runs (BE-BI view) Should start look seriously at: What to test and how (some things are simple, others very much not) How to determine ‘success’ ? “OK” The screen moved, C.O. position logged, BLM threshold = f(E) inside FPGA !! How to document 1) and 2) Reasonably ‘light-weight’ Short dedicated meetings (OP/ABP/ABT/CO/BI) when applicable Important subjects to not forget: Full logging deployment (Oracle, SDDS) Being looked at presently (meeting next Tuesday) Full RBAC deployment Must be carefully planned (F.E. SW re-link needed) CO aims for ‘strict’ policy during 2009 All applications must authenticate (provide login) for CMW access Access maps agreed, deployed and tested (for critical properties) CMW proxies deployment Necessary for certain systems(implications for applications) See more during presentation 03 February 2009 Lars K. Jensen BE-BI-SW LCWG

Dry-runs 2009 (proposal) Beam Instrumentation for circulating beam Ramp Squeeze Inject and dump CIBU tests Post-mortem 03 February 2009 Lars K. Jensen BE-BI-SW LCWG

BI for circulating beam BPMs (Closed Orbit @1Hz) (feedback service unit) Interlocked BPMs (Closed Orbit @1Hz) BLMs (Running Sums @1Hz) (LSA concentrator) BCTFR (Total + bunch intensities @1Hz) BCTDC (Total intensity @1Hz) Tune (Tune ++ @1Hz) PLL (Tune ++ @1Hz) Requires only BPNM event (GMT) distributed (automatic) Goal: Provide training, ensure tools are available and perform as expected Date: Anytime (some F.E. may be OFF -> warn us) 03 February 2009 Lars K. Jensen BE-BI-SW LCWG

Energy ramp Use Bruno Puccio’s « Fake Generator » to generate energy ramp to 7 TeV at some realistic rate (repeated on demand) Transmit energy information SMP -> GMT -> LHC BST Use LHC DC BCT systems to transmit (simulated) intensity values: BCT 1/2 -> MTT -> SMP -> GMT -> LHC BST 1/2 Would allow testing (BI): Safe-beam flag behaviour (interlock masking ON/OFF) LHC BLM threshold handling (E) Abort-gap system (E + I) Luminosity systems (E) Wall current monitor (E) FFT and PLL excitation amplitude (E) BWS SW interlock (E + I) BST (1+2) message transmission (E+I) Beam feedbacks (function of E) Ralph &Jorg dixit: only minor problems expected (!) Squeeze discussed next slide Date: “TBD” (not before 3rd week of March) 03 February 2009 Lars K. Jensen BE-BI-SW LCWG

Squeeze (R.S., J.W.) To be tested before the first squeeze with beam: Setting of the reference orbit/bumps via YASP/LSA Definition and upload of the squeeze sequence Q: Are the complete optics defined/ready in LSA? Q: How many optics and how fast are they changed ? 160 optics in 6 minutes (…) 50 optics in 20 minutes (tight, but OK) Response matrix re-computation on BPM, COD, and optics changes Q: How to we change optics: Timing event (to be defined) ? LHC Sequencer -> FESA property Smart operator FB loop? Most of pending work depends on the answers Date: TBD 03 February 2009 Lars K. Jensen BE-BI-SW LCWG

Inject and/or dump BI systems linked to injection: Date: “TBD” BTV (CMW proxies needed) BLM (LSA concentrator) BPM (LSA concentrator) BCTFR (CMW proxies needed) Injection related events (+BPM/BLM CAP) tables to be played Injection pre-pulses Date: “TBD” BI systems linked to beam dump “XPOC”: BCTFD BPMSE, BPMD Interlocked BPMs XPOC related events table to be played 03 February 2009 Lars K. Jensen BE-BI-SW LCWG

CIBU test (BIC) Bruno Puccio (MPWG) requests low-level software implementation for each front-end connecting to CIBU BTV, BLM, Interlocked BPM (2009) Task to be added to LHC sequencer (run before each fill?) Date: June/July 2009 (lab tests before long) 03 February 2009 Lars K. Jensen BE-BI-SW LCWG

Post-mortem Date: “TBD” (June 2009 proposed) BPM (OK, to be tested) BLM (OK, to be tested) Luminosity (OK, to be tested) BCTDC (implement and test) BCTFR (implement and test) BSRT SLOW/FAST (implement and test) Tune and PLL (implement and test) Abort Gap (implement and test) Date: “TBD” (June 2009 proposed) 03 February 2009 Lars K. Jensen BE-BI-SW LCWG