ASAS-TN2 5th Workshop Toulouse 17 September 2007 Jörg Steinleitner

Slides:



Advertisements
Similar presentations
Air / Ground Communications in Europe
Advertisements

The CASCADE Programme From Concept to Operations ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
ASAS TN Second Workshop, 6-8 October 2003, Malmö ASAS-TN Implementation Strategy Plan Tony Henley BAE SYSTEMS.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-85/PIA-3 Air Traffic Situational Awareness (ATSA) Workshop on preparations.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-86/PIA-3 Improved Access to Optimum Flight Levels through Climb/Descent.
CNS/ATM SG #42 ADS-B - CASCADE Presentation Material Cologne, 15 October 2008 Jörg Steinleitner, CASCADE Infrastructure WP Lead.
Surveillance in Europe: status and plans
Direction générale de l’Aviation civile direction de la Technique et de l’Innovation direction des services de la Navigation aérienne 21/06/2005 ADS-B.
Advanced Safe Separation Technologies and Algorithms (ASSTAR) Project ASAS-TN2 Workshop #1 Malmö 26 th -28 th September 2005 ASSTAR is a Specific Targeted.
1st ASAS-Thematic Network 2 Workshop Malmoe 26th-28 th September 2005 “Implementation planning and future packages” Session Moderator: Giorgio MATRELLA.
EDEP as Tool for ADS-B Validation eDEP User Group, 9 June 2008 Leo van der Hoorn, CASCADE Programme.
CASCADE From Concept to Implementation SUR Division Meeting Brussels, 17 December 2007 Alex Wandels, Jörg Steinleitner, Sorin Muresean CASCADE Programme.
EASA Airborne Separation Assistance Systems (ASAS) Certification
The CASCADE Programme Validation Status and Plans ASAS-TN2 Workshop 3-5 April 2006 Christos Rekkas CASCADE Deputy Programme Manager European Organisation.
April 2003ASAS TN April 2003 Workshop1 ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Towards Implementation of ASA/GSA Package I” Pieter van der.
CRISTAL ATSAW Project Sep 2007 ASAS TN Christelle Pianetti, DSNA Simona Canu-Chiesa, Airbus.
Clustering ASAS Applications ASAS-TN2 First Workshop, Malmö 26 to 28 September 2005 Fraser McGibbon BAE Systems.
CRISTAL ITP European Organisation for the Safety of Air Navigation CRISTAL ITP ASAS-TN, Paris Johan Martensson CASCADE CRISTAL ITPJohan Martensson ASAS-TN.
ASAS-TN Workshop Glasgow 11 September 2006 Alex Wandels CASCADE Programme Manager EUROCONTROL European Organisation for the Safety of Air Navigation CASCADE.
ASAS TN2 WP3: Assessing ASAS Applications Maturity Eric Hoffman EUROCONTROL.
1 EUROCAE EUROCAE Dedicated to Aviation Standardisation ASAS Standards: “From concept to equipment” David Bowen (Technical Secretary) April 24 th 2007.
3rd ASAS TN Workshop 19 April – 21 April rd ASAS TN Workshop Session 4: Strategy and Implementation Package I Requirements Focus Group (“Rapid.
Session 1: Progress and Status of Implementation and Standardisation CASCADE & RFG ASAS-TN2 5 th Workshop Toulouse 17 September 2007 Jörg Steinleitner.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-84 Initial Capability for Ground-based Cooperative Surveillance SIP/2012/ASBU/Nairobi.
1 RFG Overview ASAS-TN Malmö September 2005 Jörg Steinleitner CASCADE Infrastructure WP Leader, EUROCONTROL European Organisation for the Safety.
08 June 2006 Portland 2006: aircraft certification session Yves Morier The EASA Advance -NPA for UAV systems Certification Presentation by: Y Morier EASA.
ASAS WORKSHOP Roma April 2003 Airlines’ perspective Nicolas Zvéguintzoff Assistant Director- Technical / Financial Liaison – Europe.
The CASCADE Programme From Concept to Operations ASAS-TN Malmö September 2005 Alex Wandels CASCADE Programme Manager, EUROCONTROL European Organisation.
ASAS-TN 3rd Workshop - Airbus ASAS Vision ASAS-TN 3 rd Workshop AIRBUS and Airborne Surveillance ASAS-TN 3 rd Workshop - Airbus and Airborne Surveillance.
1 ADS-B-NRA Status ASAS-TN Malmö September 2005 Jörg Steinleitner (prepared by Gilles Caligaris) CASCADE Infrastructure WP Leader, EUROCONTROL European.
1 Presentation to ASAS TN2 17 th September 2007 Mel Rees Head of Surveillance EUROCONTROL EUROCONTROL SURVEILLANCE STRATEGY.
The CASCADE Programme Validation Results ASAS TN2 27 September 2005 Christos Rekkas CASCADE Deputy Programme Manager, EUROCONTROL European Organisation.
Airbus Status on ADS-B In / Out Update
Aircraft Manufacturer Plans - Airbus Stéphane Marché – Airbus ASAS TN Glasgow, September 2006.
1 Airborne Separation Assistance Systems (ASAS) - Summary of simulations Joint ASAS-TN2/IATA/AEA workshop NLR, Amsterdam, 8 th October 2007 Chris Shaw.
Certification Considerations for the Implementation of ASAS Applications on Aircraft Kevin Hallworth: UK CAA ASAS-TN Seminar – October 2004.
Session 1: Progress and Status of Implementation and Standardisation RFG Status ASAS-TN2 4 th Workshop Amsterdam April 2007 Jörg Steinleitner CASCADE.
ASAS TN Session 4 summary Billy Josefsson, LFV Rob Ruigrok, NLR.
The CASCADE Programme Blueprint for ADS-B Deployment ASAS-TN2 Workshop – Amsterdam April 2007 Christos Rekkas CASCADE Deputy Programme Manager, EUROCONTROL.
ASAS-GN Rome November 2008 Alex Wandels, CASCADE Programme Manager.
ADS-B Out, In and GNSS Requirements Update
Workshop on preparations for ANConf/12 − ASBU methodology
ASSTAR Overview Jean-Marc Loscos, DSNA
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
Juan Vázquez Sanz EUROCONTROL SRU
ADS-B Regulations, Standards and Guidance
Workshop on preparations for ANConf/12 − ASBU methodology
ADS-B OUT - IATA VIEW ADS-B SITF/11 – Jeju, Korea 24 – 27 April 2012
SIP/2012/ASBU/Nairobi-WP/19
ASAS Thematic Network ASAS Now!.
Chris Shaw, EUROCONTROL Experimental Centre
Workshop on preparations for ANConf/12 − ASBU methodology
Rome November 2008 Johan Martensson, CASCADE
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization
Chris Shaw, EUROCONTROL Experimental Centre
Ground System implication for ASAS implementation
EUROCONTROL SURVEILLANCE STRATEGY
Safety Management in Europe
IBAC – CNS/ATM Datalink Briefing
ASSTAR Project Overview & User Forum Objectives
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
RNAV-RNP CERTIFICATION SUMMARY RNAV-RNP EVOLUTION RNAV-RNP CERTIFICATION SUMMARY2 On-Board Navigation Monitoring 2016.
Towards ASAS Implementation The Role of the CASCADE Programme
XRN 4954 – MiR Drop 5 - Status Update
Presentation transcript:

Session 1: Progress and Status of Implementation and Standardisation CASCADE & RFG ASAS-TN2 5th Workshop Toulouse 17 September 2007 Jörg Steinleitner CASCADE Infrastructure WP Leader, EUROCONTROL European Organisation for the Safety of Air Navigation

Overview CASCADE Programme: CASCADE Validation: Scope, Implementation Policy, Worldwide Co-ordination CASCADE Validation: Status: ADS-B out & ADS-B in, Pioneer Airlines, Monitoring Requirements Focus Group: Within CASCADE, Status, Planning Timeline: Standardisation, Certification, Rulemaking

CASCADE Programme

CASCADE Scope 2008 2011 Ground Surveillance Applications (ADS-B-out) In a non-radar environment In a radar environment On the airport surface Airborne Derived Data 2008 ADS-B Receiver Airborne Surveillance Applications (ADS-B-in & TIS-B) Situational awareness on the surface Airborne situational awareness Visual separation on approach In Trail Procedure 2011

The Bigger Picture voluntary implementation in pocket areas certified existing equipage IR based implementation in wider areas upgraded equipage 2015

The ADS-B Implementation Policy

ADS-B in other Continents Worldwide Co-ordination

CASCADE Validation

First “ADS-B out” Implementation Sites LVNL (Netherlands) implements ADS-B NRA with WAM (2009 in N. Sea) LFV Sweden implements ADS-B NRA (2008, Kiruna) ADS-B RAD (2009, Ostgota) 7 ANSPs (CRISTAL MED:Cyprus, France, Greece, Italy, Malta, Portugal, Turkey) validate ADS-B NRA & RAD towards implementation decision by 2008 DFS has included ADS-B (and WAM) in its SUR Strategy Target date is 2015

Certification target date: 2009 ADS-B-in: Emerging implementation CRISTAL Sweden (ATSAW trials for GA) completed: Implementation by 2009 (Ostgota) CRISTAL ATSAW (simulations of ATSA VSA, SURF, AIRB) to be completed in Oct 2007 CRISTAL ITP (simulations and trial in N. Atlantic) ongoing CRISTAL Germany (TIS-B feasibility for ATSAW) ongoing Certification target date: 2009

ADS-B Implementation Roadmap 2007 2008 2009 2010 2011 ADS-B-NRA Pre-ops Validation Implementation ADS-B-RAD ATSAW-VSA ATSAW-ITP Initial Validation ADS-B-APT ADS-B-ADD ATSAW-AIRB ATSAW-SURF NRA: In Non-Radar Airspace RAD: In Radar Airspace VSA: Visual Separation on Approach ITP: In Trail Procedure APT or SURF: On the Airport Surface ADD: Aircraft Derived Data for ground tools AIRB: During flight operations

ADS-B Pioneer Airline Project Target: “ADS-B out” Certification 17 Airlines - 400 Aircraft – 500.000+ flights/year CASCADE has been put in place to continue to exploit the potential of air ground data links It reuses the infrastructures put in place by other programmes and in doing that minimises the cost for airlines and ANSPs alike Data link is the key to the future, CASCADE hopes to become one of a handful of programmes worldwide that does not just talk about it, but makes it happen. In doing that we keep our eyes open for the fact that aircraft need to operate everywhere in the world and that everything we do needs to be seen in that light.

Pioneer Airline Project Monitoring & Certification Statistical Evidence Avionics Design Possibly supporting means of compliance demonstration (in-flight statistics) Primary means of compliance demonstration (design assurance, tests) Airworthiness Approval

“ADS-B Certification Workshop” Timeline “ADS-B Certification Workshop” 21+22 Nov in Palma (hosted by Air Europa) EASA AMC JAA NPA ED-126 EASA NPA NPA: Notice of Proposed Amendment AMC: Acceptable Means of Compliance Comments Deadline: 7 Sep Certification Application 2006 2007 2008 Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov D1: high-level fleet info D2: detailed D3: 1st Pioneers Certified

Requirements Focus Group

High-level RFG Planning Dec 06 Apr 07 Aug 07 Dec 07 Apr 08 Aug 08 Dec 08 Apr 09 Aug 09 ADS-B-RAD ATSA-ITP ATSA-VSA ADS-B-RAD: Enhanced ATS in Radar Areas ATSA-ITP: In-trail Procedure in Oceanic Airspace ATSA-VSA: Enhanced Visual Separation on Approach ADS-B-APT ATSA-AIRB ATSA-SURF ATSA-APT: Airport Surface Surveillance ATSA-AIRB: Enhanced TSA During Flight Operations ATSA-SURF: Enhanced TSA on the Airport Surface ADS-B-NRA (ED-126, DO-303) Enhanced ATS in Non-Radar Areas TBD: ASPA-S&M Enhanced Sequencing & Merging Operations (advanced as background task – feasibility check in Jan 08) ADS-B-ADD – Aircraft Derived Data for Ground Tools

Application Status ADS-B-RAD, ATSA-VSA & ATSA-ITP OSEDs are “frozen”: Apart from ATSA-VSA “enhanced procedure” Assessments are concluding: Safety (incl. surveillance risk modelling), Performance & Interoperability SPR/INTEROP document Integration to commence Critical step to facilitate wider review Target dates for EUROCAE/RTCA approval: ATSA-ITP – April 2008 ATSA-VSA – April 2008 (tbc) ADS-B-RAD – July 2008

RFG – 2007/2008 Meetings Week of 15 October 2007 (Europe, Toulouse) Week of 21 January 2008 (USA, Melbourne) Week of 07 April 2008 (Europe, Brussels)

Overall Timeline: Standardisation, Certification & Rulemaking

Overall Timeline: Standardisation, Certification & SES Rulemaking Standardisation, Certification & Rulemaking Overall Timeline: Standardisation, Certification & SES Rulemaking ADS-B in (voluntary) Initial Implementations – Pioneer Phase existing avionics ED102A DO260A+ Towards Joint MOPS INTEROP Validation Implementation ADS-B out Mandate avionics upgrade EC SES IR Rulemaking SPI IR MoC EASA/FAA Rulemaking EASA ‘RFG’ AMC EASA NRA AMC EASA/FAA (E)TSO-166x Towards Joint Transponder TSO FAA TSO C166A NRA RAD, VSA, ITP APT, other ? AIRB, SURF RFG SPR/INTEROP EUROCAE/RTCA 1090 ES Transponder MOPS ED102/DO260 DO260A >2015 2008 2009 2010 2011 2012 <2007

Summary “ADS-B” out rulemaking on its way World-wide co-ordination ADS-B Pioneer Airlines & Monitoring Projects … … ED102/DO260 certification for early deployment RFG key to rulemaking baseline

Thanks

Backup

Scope of ADS-B Airborne Monitoring 1090 ES “ADS-B out“ Transponder Control Panel Callsign SPI-ES Performance Analysis (incl. latency) Consistency (Mode A/C/S) ALL: “counting” statistics GNSS Position HPL HFOM Velocity Mode S Transponder 24-bit address NUC-NIC/NAC Extended Squitter BDS 0,5 BDS 0,8 (BDS 0.9) (BDS 6,1) (BDS 6,5) Correctness Consistency (Performance) Barometric Altimeter FL

RFG within the CASCADE Context Simulations, Trials & Monitoring ASA/GSA SPR-INTEROP Procedures ATC Manual Aircrew Manual Ground Infrastructure Avionics System Standards Preliminary Safety Case EC SES Regulation EASA & JAA Regulation Airworthiness Approval Operational Approval