Design of Structural Systems CIE-600

Slides:



Advertisements
Similar presentations
EcoTherm Plus WGB-K 20 E 4,5 – 20 kW.
Advertisements

AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Worksheets.
Slide 1Fig 25-CO, p.762. Slide 2Fig 25-1, p.765 Slide 3Fig 25-2, p.765.
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
CHAPTER 18 The Ankle and Lower Leg
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
2.11.
The 5S numbers game..
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
Structural Analysis and Design of a Composite Steel/RC Multi-Storey Building United Arab Emirates University College of Engineering Department of Civil.
Introduction to composite construction of buildings
A BYU Civil and Environmental Engineering Capstone Project by: Charles Connors, Andrew Luna, and Jonathon Archer Parallel Engineering Seattle Temple: Bearing.
Dummy Dealers welcome !. euroCADcrete Step 1: General data euroCADcrete: Educational software according EC2.
Biology 2 Plant Kingdom Identification Test Review.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Plain & Reinforced Concrete-1 CE3601
When you see… Find the zeros You think….
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Before Between After.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
25 seconds left…...
Subtraction: Adding UP
Static Equilibrium; Elasticity and Fracture
SECTION 8 - RACKING (BRACING) AND SHEAR FORCES WEEK 13
1 Design and drawing of RC Structures CV61 Dr. G.S.Suresh Civil Engineering Department The National Institute of Engineering Mysore Mob:
Outline CH1.Introduction CH2.Preliminary Design CH3.3D Model.
Chp12- Footings.
Reinforced Concrete Design-8
Lecture 9 - Flexure June 20, 2003 CVEN 444.
Overview Waffle Slab.
Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option.
Design of Cantilevered Retaining Walls
ONE-WAY SLAB. ONE-WAY SLAB Introduction A slab is structural element whose thickness is small compared to its own length and width. Slabs are usually.
Chp.12 Cont. – Examples to design Footings
Torsion in Girders A2 A3 M u = w u l n 2 /24 M u = w u l n 2 /10M u = w u l n 2 /11 B2 B3 The beams framing into girder A2-A3 transfer a moment of w u.
Express Team University of New Mexico February 24, 2006.
Retaining Walls.
Lecture 11 Advance Design of RC Structure Retaining walls
Footings.
Code Comparison between
University of Palestine
Plain & Reinforced Concrete-1 CE-313
Reading Structural Drawings
FOOTINGS. FOOTINGS Introduction Footings are structural elements that transmit column or wall loads to the underlying soil below the structure. Footings.
Supervisor: Dr. Mahmoud Dweikat.. Outline: 1. Introduction. 2. Static design 3. dynamic design 4. Conclusion.
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
Chapters Project title : Hirbawi Center A building lies in the east side of Tulkarm, this building consists of five stories of ( m 2 ) A building lies.
Tulkarem Multipurpose Sport Hall Prepared by: Moatasem Ghanim Abdul-Rahman Alsaabneh Malek Salatneh Supervisor: Dr. Shaker Albitar.
◦ Ar-Rafedain building is 8 stories reinforced concrete building,located in Nablus city and used as commercial and residential building. ◦ The basement.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Shear Stresses in Concrete Beams
Footing.
CESL Hotel Unique – Toronto Chris O’Brien Eric Fraser Scotia Mabury
An-Najah National University Faculty of Engineering
786 Design of Two Way floor system for Flat Plate Slab
Structural Design of Technology College in Hebron University
Outline: Introduction: a ) General description of project b) Materials
An-Najah National University
Lecture 39 - Design of Two-Way Floor Slab System
786 Design of Two Way Floor System for Slab with Beams
Outline CH1.Introduction CH2.Preliminary Design CH3.3D Model.
Supervisor: Dr. Mahmoud Dweikat.
An Najah National University Submitted to : Dr.Munther Diab .
An-Najah National University
بسم الله الرحمن الرحيم RaRami Abu Baker An- Najah National University
Presentation transcript:

Design of Structural Systems CIE-600 A PRESENTION ON THE DESIGN OF AN OFFICE BUILDING By Kalpesh P.

Presentation Outline General information about the building Design of Slabs Design of Beams, columns and Foundation Design of shear and retaining walls Design of Stair case Green Engineering and Aesthetics Aspect Material (concrete) Usage Estimation References

General Information Building Retaining wall – Height of 10 ft An office building Located in Syracuse A three-story of 58 ft high building Has three buildings separated by an expansion joint Two freight, Two passenger elevators Two stair cases Retaining wall – Height of 10 ft Materials used Concrete -6000psi and Steel-60000psi ACI and International building codes adopted

Top View 10 Shear Walls 2 s

Views of the building Parapet 1’ 16’ 16’ Flat Plate Flat Slab 26’ 2 Freight elevators Staircase 2 Passenger elevators Parapet 1’ Staircase 16’ 16’ Flat Plate 26’ Flat Slab Slab with beams 25’ 25’ 25’ 25’ Slab on ground 25’ 25’ 25’ 25’ 25’ 25’ 25’ 25’ 25’ 25’ 25’ 25’

2. Slabs Design Flat plate Flat Slab Slab with interior beam Slab on Ground

Location of Design Slabs 25’ 25’ 25’ 25’ 16’ 16’ Flat Plate 26’ Flat Slab Slab with beams 25’ 25’ 25’ 25’ Slab on ground 25’ 25’ 25’ 25’ 25’ 25’ 25’ 25’

Top View

The use of expansion joint

The use of expansion joint Source by Design Handbook: section 4 http://www.copper.org/homepage.html

Design Procedure Using Two-way slabs, Direct Design Method (ACI Code) Find a load combination Find a slab thickness Obtain a static moment (Mo) Distribution of a static moment Percentage of design moment resisted by column strip Find As , and Select steel for reinforcement Shear check

Panel Assignment

Strip Design W W B C 7 9 8 25 ft 25 ft 25 ft

Combination Loads U = 1.2(D + F + T) + 1.6(L + H) + 0.5(Lr or S or R) Dead load (D) = 150 psf x thickness of slab Topping load (T) = 20 psf Live load (LL) = 50 psf Finishing load (F) = 20 psf Rain load (R) = 62.5 psf Snow load (S) = 46.2 psf Roof live load(Lr) = 12.0 psf

Design Numerical Values Types of Slab Flat Plate Flat Slab Slab with Beams Slab Thickness 9” 8” 7” Load combination (U) 226.25 psf 224 psf 203 psf Static Moment (Mo) 401.61 ft-k 397.62 ft-k 370.90 ft-k

Flat plate 1 2 3 4 5 E C D A B CT1y MT1 CB1y CT1 MT CT2y CB CT2 CT CB1 MB CTy CT2y CT2 CT CBy CB1y CB CB1 MT MT1 CT3 CB2 CB3 1 2 3 4 5 E C D A B Flat plate

Flat plate 6 7 8 9 10 F D E B C v MT1 C B1y CT1y CB1y M B CT1 CT2y MT CBC1y MT MTC CTcy C BCy F D E B C v M B C B1y CTC Flat plate

Flat plate Type Strip Placed @ Specification Bar No. Spacing (in), Length and type CT column top 5 CT1 CT2 CTY CT1Y CT2Y CB bottom 4 CB1 CBY CB1Y MB middle MT MT1 L= 15.4ft c/c 15 in L= 10.6 ft c/c 15 in L= 9.5 ft c/c 13 in L= 7.2 ft c/c 13 in L= 15.4 ft c/c 16in L=10.6 ft c/c 16in L= 15.4 ft c/c 14in L=10.6 ft c/c 14in L= 15.4 ft c/c 15in L=10.6 ft c/c 15in L= 7.5 ft c/c 12 in L= 25ft c/c 12 in L= 25ft c/c 20 in L= 26.5ft c/c 20 in L= 25ft c/c 11.5 in L= 25ft c/c 21 in L= 26.5ft c/c 21 in L= 12 ft c/c 12in L= 25.5ft c/c 24 in L= 17ft c/c 24 in L= 9.5 ft c/c 12in L= 7.2 ft c/c 12 in MTC is the same as MT but with bar #5 c/c 13.5 in CTCY is the same as CT1Y but with bar #4 c/c 12 in CTC is the same as CTY but with bar # 5 c/c 10 in CBC1Y is the same as CB1Y but with bar # 5 c/c 16 in

Flat Plate 9’ 3 1 2 Column Strip 9’ 3 1 2 Middle Strip #5 bars@ 15’ , L = 15.4’ #5 bars@ 15’ , L = 10.6’ #4 bars@ 12’, L = 7.5’ #5 bars@ 13’ , L = 9.5’ #5 bars@ 13’ , L = 7.2’ #5 bars@ 15’ , L = 15.4’ #5 bars@ 15’ , L = 10.6’ #5 bars@ 16’ , L = 15.4’ #5 bars@ 16’ , L = 10.6’ 9’ #5 bars@ 21’ , L = 25’ #5 bars@ 21’ , L = 26’ #4 bars@ 12’, L = 25’ 3 1 2 #5 bars@ 20’ , L = 25’ #5 bars@ 20’ , L = 26’ #4 bars@ 24’ , L = 17’ #4 bars@ 24’ , L = 25’ Column Strip #5 bars@ 15’ , L = 15.4’ #5 bars@ 15’ , L = 10.6’ #4 bars@ 12’, L = 7.5’ #4 bars@ 12’, L = 7.5’ #4 bars@ 12’, L = 12’ #4 bars@ 12’, L = 12’ 9’ 3 1 2 #4 bars@ 24’ , L = 17’ #4 bars@ 24’ , L = 25’ #4 bars@ 24’ , L = 17’ #4 bars@ 24’ , L = 25’ #5 bars@ 20’ , L = 25’ #5 bars@ 20’ , L = 26’ #4 bars@ 24’ , L = 17’ #4 bars@ 24’ , L = 25’ Middle Strip

Flat Slab 1 2 3 4 5 E C D A B CT1y MT1 CB1y CT1 MT CT2y CB CT2 CT CB1 MB CTy CT2y CT2 CT CBy CB1y CB CB1 MT MT1 CT3 CB2 CB3 1 2 3 4 5 E C D A B Flat Slab

Flat Slab 6 7 8 9 G F v E D C B 10 MT1 C B1y CT1y CB1y M B CT1 CT2y MT CBC1y MT MTC CTcy C BCy F D E B C v M B C B1y CTC 9 10 G Flat Slab

Flat Slab Type Strip Placed @ Specification Bar No. Spacing (in), Length and type CT column top 5 CT1 CT2 CTY CT1Y CT2Y CB bottom 4 CB1 CBY CB1Y MB middle MT MT1 L= 17ft c/c 13 in L= 11 ft c/c 13 in L= 9.1 ft c/c 12 in L= 6 ft c/c 12 in L= 17 ft c/c 14in L=11 ft c/c 14in L= 17 ft c/c 12in L=11 ft c/c 12in L= 17 ft c/c 13in L=11 ft c/c 13in L= 6.5 ft c/c 12.5 in L= 25ft c/c 11 in L= 25ft c/c 17 in L= 26.5ft c/c 17 in L= 25ft c/c 10 in L= 25ft c/c 19 in L= 26.5ft c/c 19 in L= 12 ft c/c 12.in L= 25ft c/c 27 in L= 22ft c/c 27 in L= 9.1 ft c/c 10 in L= 6 ft c/c 10 in MTC is the same as MT but with bar #5 c/c 13.5 in CBC1Y is the same as CB1Y but with bar # 5 c/c 16 in CTC is the same as CTY but with bar # 5 c/c 10 in MB1 is the same as MB but with bar #4 c/c 24 in CTCY is the same as CT1Y but with bar #4 c/c 12 in

Flat Slab 8’ 3 1 2 Column Strip 8’ 2’ 3 1 2 Middle Strip L = 4.2’ #5 bars@ 10’ , L = 9.1’ #5 bars@ 10’ , L = 6’ #4 bars@ 12.5’, L = 6.5’ #5 bars@ 12’ , L = 9.1’ #5 bars@ 12’ , L = 6’ #5 bars@ 13’ , L = 17’ #5 bars@ 14’ , L = 17’ #5 bars@ 14’ , L = 11’ 8’ 3 1 #5 bars@ 19’ , L = 25’ #5 bars@ 19’ , L = 26.5’ 2 #4 bars@ 11’, L = 25’ #5 bars@ 17’ , L = 25’ #5 bars@ 17’ , L = 26.5’ #4 bars@ 27’ , L = 22’ #4 bars@ 27’ , L = 25’ Column Strip #5 bars@ 10’ , L = 9.1’ #5 bars@ 10’ , L = 6’ #4 bars@ 12.5’, L = 6.5’ #4 bars@ 12.5’, L = 6.5’ #4 bars@ 12’, L = 12’ #4 bars@ 12’, L = 12’ 8’ 2’ 3 1 2 #4 bars@ 27’ , L = 22’ #4 bars@ 27’ , L = 25’ #4 bars@ 27’ , L = 22’ #4 bars@ 27’ , L = 25’ #5 bars@ 17’ , L = 25’ #5 bars@ 17’ , L = 26.5’ #4 bars@ 27’ , L = 22’ #4 bars@ 27’ , L = 25’ Middle Strip L = 4.2’ L = 4.2’

Slab with Beams 1 2 3 4 5 E D C B A CT1 CT1 CT2 MT1 CB CT2 MT1 CT1 CT MB1 MB MB1 MB MB1 MT1 CB1 MT1 CB1 CB1 CB1 D MT CT MT CTy MT CT CT CB CT CB CT CB1 CT1 CB1 CT CT1 CBy MT MT MT CB MB MB1 Slab with Beams CB MB MB MB MB1 CB CB MT1 MT1 CT CT C CT MT CT MT CT CT1 CB1 CT CB CT CB CT CB1 CT1 CB MT MT MT CB MB MB1 MB CBy CB MB CB MB MB1 MT1 MT1 CT CT CT CT CT B MT MT CT1 CB1 CT CB CT CB CT CB1 CT1 MT MT MT CB1 CB1 MB1 MB1 MB MB1 MB CB1 CB1 CB1 MB1 MT1 MT1 A CT1 CT1 CT1 CT1 MT1 CT MT1 CT1 MT1 CB1 CT CB CB CT MT1 CB1

Slab with Beams 6 7 8 9 G F v E D C B 10 MT1 MT1 MT1 MT1 MT1 CB1 CT CB MB MB1 MB MB C B1 MB MB1 CB1 CB1 CB1 MT1 MT1 CT2 CT F MT CT MT MT MT CB1 CT CT CTy CB1 v CB CB CT MT MT M B MB1 MT1 MB MB MB MB1 MT1 Slab with Beams CB CB CB MT1 CB CB E CTy MT CT MT CT CT MT CT MT CB CT CB CT CB1 CT1 CB1 CT CT1 CB MT MT MT CB MB MB1 CB MB CB MB CB MB MB1 MT1 MT1 CT MB MB D CT CT2 MT CT MT CT CT1 CB1 CT CB CT CB CT CT CB1 CT1 CBy MTw MT MT CBy MB CBy MB MBw CB MB MBw CBy MB MT1 MT1 CTy C CTy CTy MT CT MT CT CT CB1 CT MT CT1 MTC CT CB CT CB CT CB1 MT MT MT CT1 C BC CBC MB MB MBw MB1 CB CB1 CBC MB MB1 MT1 MT1 B CT1 MT1 CT1 MT! CT1 MT1 CT1 CT1 CT CT MT1 CB1 CB CT CB CB1

Slab with Interior Beams Type Strip Placed @ Specification Bar No. Spacing (in), Length and type CT column top 3 CT1 CB bottom CB1 MT middle MT1 MB MB1 L= 15.4ft c/c 17 in L= 10.6 ft c/c 17 in L= 9.5 ft c/c 17 in L= 7.2 ft c/c 17 in L= 25ft c/c 8.5 in L= 25ft c/c 17 in L= 26.5ft c/c 17 in L= 12 ft c/c 6.5 in L= 7.5 ft c/c8.5in L= 25.5ft c/c 17 in L= 17ft c/c 17 in L= 25.5ft c/c 15 in L= 17ft c/c 15 in MTC is the same as MT1 but with bar #5 c/c 10.5 in MTW is the same as MT but with bar # 4 c/c 20 in MBW is the same as MB but with bar #4 c/c 24

Slab with Beams 7’ 3 1 2 Column Strip 7’ 3 1 2 Middle Strip #3 bars@ 17’ , L = 9.5’ #3 bars@ 17’ , L = 7.2’ #3 bars@ 8.5’, L = 7.5’ #3 bars@ 17’ , L = 9.5’ #3 bars@ 17’ , L = 7.2’ #3 bars@ 15’ , L = 15.4’ #3 bars@ 15’ , L = 10.6’ #3 bars@ 17’ , L = 15.4’ #3 bars@ 17’ , L = 10.6’ 7’ #3 bars@ 17’ , L = 25’ #3 bars@ 17’ , L = 26.5’ #3 bars@ 8.5’, L = 25’ 3 1 2 #3 bars@ 17’ , L = 25’ #3 bars@ 17’ , L = 26’ #3 bars@ 15’ , L = 17’ #3 bars@ 15’ , L = 25.5’ Column Strip #3 bars@ 17’ , L = 9.5’ #3 bars@ 17’ , L = 7.2’ #3 bars@ 8.5’, L = 7.5’ #3 bars@ 8.5’, L = 7.5’ #3 bars@ 6.5’, L = 12’ #3 bars@ 6.5’, L = 12’ 7’ 3 1 2 #3 bars@ 15’ , L = 17’ #3 bars@ 15’ , L = 25.5’ #3 bars@ 17’ , L = 17’ #3 bars@ 17’ , L = 25.5’ #3 bars@ 15’ , L = 17’ #3 bars@ 15’ , L = 25.5’ #3 bars@ 17’ , L = 25’ #3 bars@ 17’ , L = 26’ Middle Strip

Slab on ground Slab thickness = 6” Using minimum shrinkage and temperature reinforcement (As = 0.0018bh) Rebar # 3 @ 10” on center in two directions Placing rebar at 2” lower the top of the slab

Design of Beams,Columns and Footings Edge beams Interior Beams Columns Column at a corner Exterior Columns Interior columns Footing Footing under a corner column Footing under an edge column Footing under an interior column Common footing

Graphical Representations

Beam Design Loading on beams: Depends on The loads may include their location in a floor and along a story The loads may include Loads from Slabs Self weight of beams Weight of walls or attachments that directly lie or attached on the beams Parapet Walls Curtain walls Partition walls

Load Transfer to beams Load transfer from curtain walls slabs Load transfer from slabs

Summary of Loading on Edge Beams Floor level Factored Design loads Due to parapet wall Udl- k/ft Due to self weight of beam stem/web Due to glass curtain walls Udl – k/ft Weight from slabs ( triangular) w (k/ft) Flat plate 0.09 0.11 0.072 2.82 Flat slab 0.125 0.144 2.79 Floor with beams 0.141 0.189 2.61 Grade beams 0.251 0.117

Loaded Edge frame for analysis of Edge Beam actions SAP 2000 is used for analysis

Loaded frame for analysis of Interior Beam actions Loading diagram (axis 1B-2B-3B-4B-5B) for the purpose of calculating additional moments due to self weight of beam Loading diagram (axis 1B-2B-3B-4B-5B) for the purpose of calculating shear in internal beams due to loads from slab

Design Actions and sections Shear Reinforcment Vertical shear Torsional shear ( for the case of edge beams) Longitudinal Reinforcement(edg e beams) Bending ( two types of sections need to be considered) Moments (kips-ft) Beams @level A1 support A1-A2 span A2 A2-A3 A3 A3-A4 A4 A4-A5 A5 Flat plate 66.75 76.01 118.74 59.64 103.49 Flat Slab 90.53 65.43 110.00 60.2 105.26 110 Slab w/beams 74.42 68.6 111.71 57.58 100.73 57.88 Ground 18.21 9.77 19.5 9.45 19.29

Procedures of Beam Design Check depth for moment and shear capacity Calculate reinforcements Longitudinal reinforcement ( for moment and torsion if applicable) Shear reinforcements for ( vertical shear and torsion if applicable) The max torsion in the beams was found to be smaller than the torsion capacity requirement for the x-section for torsion to be neglected The shear reinforcement was found to be governed by the max spacing as per ACI requirement i.e. for #3 double leg stirrups @ 6.75 in on center- to-center

Reinforcement summary for edge beams for frame shown earlier Longitudinal Reinforcement bw(in)= 12 d(in)= 13.5 Beam (bw=12 in; d=14.5in) A1   A2 A3 A4 A5 Support Moment -66.18 -119.6 -103 Span Moment 76.56 59.8 Req'd reinf.(in2), supp 1.1912 2.1528 1.854 1.19124 Req'd reinf.(in2), span 1.2939 1.01062 1.293864 Min. reinf 0.54 Reinf Provide Bar # used 7 8 area of bar 0.6 0.79 #bars req'd 1.9854 2.1564 2.7250633 1.68437 2.346835 1.684367 2.725063 2.15644 bars used 2#7 2#7+1#6 3#8 2#8 + 1 #6 2#8 +1#7 Note: Similar tabular calculations are made for all beams

INTERIOR BEAMS

Column Design Loads Frame is braced Check slenderness of the column Moments and axial forces from frame analyis Self-weight of columns Frame is braced Check slenderness of the column Calculated magnified moments Design for Reinforcement is made using STAAD.etc , using the ACI code

Column Attachments Third story corner column Third story edge column First story interior column

Column loadings & Reinforcements Column@ level Column type Design actions Magnified actions Reinforcement required P (kips) Mx(k-ft) My(k-ft) Third st. short 41.1 66.75 8#8 bars Second st. 84.44 49.75 4#8 bars First st slender 127.67 24.26 foundation 141.39 4.88 CORNER COLUMN Column@ level Column type Analysis actions Magnified actions Reinforcement required P (kips) Mx(k-ft) My(k-ft) Third st. short 81.04 114.89 7.43 6#8 bars Second st. 163.65 4.12 56.87 13.9 4#8 bars First st slender 244.14 2.35 28.48 28.66 Foundation 255 .48 21.65 EDGE COLUMN Column@ level Column type Design actions Magnified actions Reinforcement required P (kips) Mx(k-ft) My(k-ft) Third stor. short 144.67 13.1 4#8 bars Second st. 287.93 27.68 first slender 425.2 75.17 8#8 foundation 427.5 44 8#8 bars INTERIOR COLUMN

Column Reinforcement Corner Column Edge Column Interior Column

Footing Loading &Design Loading from Column Surcharge load Floor loading Soil load resting on the footing

Critical Sections Bearing pressure distribution Loading Critical section for two way shear Critical section for one way shear Critical section for bending

FootingReinforcement

Retaining wall Purpose Behavior of wall Components Design Sequence Drainage System Reinforcement Detailing

Purpose Behavior of Retaining wall Retaining structures hold back soil or other loose material where an abrupt change in ground elevation occurs. Behavior of Retaining wall Wall – T at rear face & C at front face. Heel - T at upper face & C at bottom face. Toe - T at bottom face & C at upper face. Shear Key – provides to resistance to sliding.

Design Sequence Loads: Due to surcharge - 0.363 kip/ft2 ( Acting Downward) Active earth pressure – 2.4kip/ft2(Acting Horizontally) Determined the dimensions of retaining wall. Checked length of heel & toe for stability against sliding & overturning. F.O.S against overturning =3.92>2 F.O.S against sliding = 2>1.5 Calculated base soil pressure. Base Soil Pressure: Pmax = 1.66 Ksf Pmin = 0.62 Ksf Provided Shear Key. Checked Stem thickness. Checked Heel & Toe thickness. Reinforcement: Component Main Reinforcement Distribution Reinforcement Shrinkage Reinforcement Stem #5@8” #3@11” #3@12” Heel #4@8” #4@12” Toe

Footing Detailing

Drainage System Purpose To release the hydrostatic pressure. Provided perforated 8” diameter pipe laid along the base of the wall &surrounded by gravels(stone filter)

Shear wall Introduction Specification of Elevator Design Consideration Shear wall slab & footing Reinforcement detailing

Introduction Elevator Specification To resist lateral forces due to wind To provide additional strength during earthquake Shear walls often are placed in Elevator or Staircase areas Elevator Specification No. of person Rated capacity(kg) Rated speed(m/s) Car internal Ceiling height Passenger Elevator 15 1000 1.5 5.9’x4.92’ 7.3’ Freight Elevator - 1200 7.22’x7.4’

Design Consideration Calculated wind load which is 26psf by using ACI code( Ps =λ I Ps30) Vu< φVn Calculated maximum shear strength permitted by φVn = φ 10 √fc hwd Calculated shear Strength provided by concrete is Vc = 3.3 √fc hwd + Nu d/4 lw Vu<<φVc (No Shear reinforcement required) Calculating Area of steel which is governed by Minimum Reinforcement in wall in our case Section has been checked by PCAcol. Provided Minimum wall Reinforcement governed by ACI. Vertical reinforcement Ast = 0.0012.b.d Provided #3@ 10 Horizontal reinforcement Ast = 0.002.b.d Provided #3@ 6’

Shear wall detailing

Shear wall Slab & footing Design Design Steps Load – 250k As = Reinforcement provided #5@ 6” (Both Direction) Footing Loads & moments calculated at the base of footing Calculated factored Soil pressure = Factored load/Area Desiged footing as a strip Integrated 3 beams

Machine room Slab detailing

Shear wall Footing

Footing& Shear wall connection

Design Staircase Shear Wall Footing for shear wall

Design Steps Staircase is designed as cantilever Stairs Load Calculated using Total Load= (L.L+ Floor to Floor Finish + Self Weight of Waist Slab + Weight of Step) Moment was calculated and tension is on the top Steel Area = Ast =Mu/ φ Fy (d-0.5a) Shrinkage and Temperature reinforcement is calculated using Area of Shrinkage = 0.0018 x b x d Development Length Check was made by using formula

Bar size designation & Spacing Reinforcement Description Bar size designation & Spacing Location Main reinforcement in Tread #7 @ 4.5” In the Tension zone of tread Main reinforcement in Midlanding #4 @ 4.5” In Midlanding Span Shrinkage Cracking and temperature reinforcement #3 @ 7” In Tread & Waist slab in both direction Shrinkage Cracking and temperature reinforcement is provided to minimize the cracking and tie the Structure together and achieve Structural integrity Development Length is provided because to develop the required stress in bar

Shear Wall SHEAR WALL IS A STRUCTURAL ELEMENT USED TO RESIST LATERAL/HORIZONTAL/SHEAR FORCES PARALLEL TO THE PLANE OF THE WALL

Design Steps Calculation of wind load which is 26psf by using ACI code Ps =λ I Ps30 Vu< φVn Calculating maximum shear strength permitted by φVn = φ 10 √fc hwd Calculating shear Strength provided by Vc = 3.3 √fc hwd + Nu d/4 lw Vu<<φVc (No Shear reinforcement required) Calculating Area of steel which is governed by Minimum Reinforcement in wall in our case Minimum Reinforcement Wall Vertical Reinforcement Ast = 0.0012 x b x d Therefore providing # 3@ 7” Horizontal Reinforcement Ast =0.002 x b x d Therefore providing #3@ 10”

Footing for Shear Wall Loading Loading from Wall Surcharge load Soil load resting on the footing

Loading at the Footing

Footing for Shear Wall Design Steps Loading Moment calculated at the base of footing Find Area required =Load/Net Pressure Calculating factored Net Pressure Check for shear for the depth Vu < ø Vc Calculated Steel area using Ast= Mn/fyjd Comparing with the minimum steel we get the minimum reinforcement in the footing as #5 @ 7” Here we are providing the shrinkage temperature reinforcement #5 @ 7” Checked for Development Length is done

What is Green engineering? Green building is the practice of increasing the efficiency with which buildings use resources energy, water and materials Helps in Minimizing Environment aspect like generation of pollution at the source risk to human health and the environment

What Aspect we have considered in Green Engineering & what function does it play? Materials Function Application Glazing Curtain Wall System Weather protection & Insulation Glass on all exterior surface Roof Garden Plantation & Aesthetics On Roof Sewage Treatment Plant To Generate Methane as an energy Drainage Treatment of Building Paints Environmental Friendly All interior portion Lighting Less Energy Consumption Both Interior & Exterior Water Proofing Water proof structure For Concrete & Masonry

Glazing Curtain wall system Function & Control Airtight and weather resistant Air leakage control Rain Penetration Control by Pressure plate Heat Loss by Cap connection Condensation Control Fire Safety

Fixing System & Components Basically consist of component like Mullions vertical Frame & rails horizontal mullions Vision Glass, insulation Hardware components – Anchors, Aluminum connector, Settings blocks, Corner blocks, Pressure plates, caps, gaskets

Glass Size Specification

Roof Garden Function Environmental Friendly Fixing System Modules with Plantation Slip Sheet /Root Barrier Water Proof roof deck http://www.liveroof.com/ Load Consideration Load due to Modular system live roof plantation in the roof is taken consideration in slab design as 20 Psf

Sewage Treatment Plant Advantage It generates Methane which can be used as a Source of Energy. We can use the piping to send to appropriate location It is an Custom make and modular in size Maintenance and Operation cost is economical It maintains the BOD & COD level of Water is obtained

Schematic Representation of STP

Other Green Engineering Component Paint Using low voltaic organic components paint is beneficial. Lighting Using T5 Lamps, low mercury lamps helps in reduction in energy consumption Waterproofing Aquafin-IC is used a penetrating, inorganic, cementitious material used to permanently waterproof

Concrete Estimation Components Quantity in (ft3) Slabs Beams Columns 75000 Beams 6973 Columns 5488 Staircase 1750 Shear Wall with Staircase 5667 Shear Wall with Elevator(2) 11861.54 Footing for Shear Wall with Staircase 1200 Footing for Shear Wall with Elevator (2) 2434.86 Footing Under Column 7232 Retaining wall 15688.52 Total 133294.9 cft