RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E.

Slides:



Advertisements
Similar presentations
LOAD RATING TRAINING Hand Calculations Tim Keller, PE Amjad Waheed, PE
Advertisements

ODOT Structure Project Manager Seminar Specifications
Project Development Process (PDP) Structures. PDP – Three Project Levels Major Project ~ 14 Steps Major Project ~ 14 Steps Minor Project ~ 10 Steps Minor.
STRUCTURES PROJECT MANAGERS SEMINAR. HOUSEKEEPING.
Overview of New Practices & Policy Deck Issues. Topics Stakeholder Responsibilities Stakeholder Responsibilities Deflection Control Measures Deflection.
Potential Solutions Goals for Design – What are we concerned about? –Primary Goal: Get the deck on successfully Stability during deck pour Stability during.
ODOT Structure Project Manager Training
Bridge Design Manual Whats New?. Waters of the United States Placement of fill material below Ordinary High Water Mark (OHWM) requires 401/404 permit.
ODOT Structure Project Manager Seminar Concrete Decks
Structural Steel Construction
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
FRP COMPOSITES FOR INFRASTRUCTURE APPLICATIONS
July Training Outline Part 1 Cost-per –SF and Detailed Estimate Pay Item Detailed Estimate Segments Bridge Level Data Segment Level Data Supports.
St. Croix River Crossing S. P
Indianapolis Airport Interchange Bridges Presented to: TRB Bridge Aesthetics Subcommittee January 11, 2005.
Design of Steel Flexural Members
Cost Estimating Workshop March 14-17, Project Phase Update Phase 1 and 3 Brad Hyre, P.E. Transportation Manager HDR Phase 2 Manoj Sethi, P.E. Executive.
3D Analysis with AASHTOWare Bridge Design and Rating
Bridge Engineering (6) Superstructure – Concrete Bridges
By : Prof.Dr.\Nabil Mahmoud
Bridge over BNSF Railroad 7 km East of Windham - East Bridge Replacement Project Using Accelerated Bridge Construction.
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
Chapter 34 Bridge Construction.
Bridge Engineering (7) Superstructure – Reinforced Concrete Bridges
Reconstruction of the Eads Bridge Highway Deck
Module 15: Railway Structures
Montana Truss Rehabilitation Projects Lozeau Bridge over the Clark Fork Dearborn River High Bridge Van Buren Street over the Clark Fork.
Lunch. Bryan District Average Construction Cost Grade Separation –$ 10 Million 2 Lane to 4 Lane –$ 2.3 Million/ Mile 2 Lane to Super 2 (passing zones)
Competency: Draw wall sections and details. Objective: Apply concepts of wood sill and floor construction.
Region One Bridge Design – Robert Jose Tovar “If I have seen further it is by standing upon the shoulders of giants” – Isaac Newton.
Schematic Design of an Accelerated Bridge Construction Project Michael P. Culmo, P.E. Vice President of Transportation and Structures CME Associates, Inc.,
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.
RM Product Update October 2009 Alexander Mabrich, PE, Msc Senior Engineering Consultant.
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
Module 13: Highway-Rail Grade Crossings (HRGC)
State Rail Partnerships. State Rail Partnerships Colorado DOT (CDOT) Project Coordination Ronnie Dickey CDOT Railroad Program Manager, Project Support.
White River Bridge Replacement The Indiana Rail Road hosted AREMA Committee 18 on May 13 th and 14 th. This included a field trip to allow the committee.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
Mid-States Highway-Rail Grade Crossing Safety Conference May 20, 2008
Introduction of Open Web Steel Joist, Deck and Composite Steel Joist
Folded Plate Bridge: Steel Alternative for Short Span Bridges Maury Tayarani Accelerated Bridge Program MassDOT.
1 Differences Between BRASS and AASHTO Standard Spec Engines Virtis Opis BRIDGEWare Users Group Meeting 2011 Helena, Montana.
2009 ACEC/ODOT CONFERENCE ODOT’S 1R PROGRAM Liz Hunt, P.E. ODOT Pavement Services Engineer.
LRFD Now! Andy Zickler VDOT Structure and Bridge Division Central Office April 10, 2006
St. Croix River Crossing S.P Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction.
“Get in, do it right, get out, and stay out.”
C. C. Fu, Ph.D., P.E. The BEST Center
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
Overview of New Practices & Policy Skewed Bridges.
1 Differences Between BRASS and AASHTO LRFD/LRFR Engines Virtis Opis BRIDGEWare Users Group Meeting 2011 Helena, Montana.
VT 100 over the Mad River Bridge Replacement July 13, 2015.
Lecture 2: Ship structural components
James C. Renick School of Education PSU AE Senior Thesis 2006 Mick Leso - Structural North Carolina A&T State University - Greensboro.
4/26/061 presents Project Crimson April 26, 2006 Sarah Grace Cade Harrelson Cochrane Jamison Libby Probst Justin Williams.
Lunch. Estimates Ballpark Accountant Typical Stages Conceptual (Alternatives) Schematic 30% Plans 60% Plans % Plans.
. Client: City of Pittsburgh, Brighton Heights Community Objectives : Develop a pedestrian/bicycle bridge reconnecting Brighton Heights to Riverview park.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
TOTAL BRIDGE REPLACEMENT OF M-13 OVER CHEBOYGANING CREEK
Offsite manufactured Bridges
High Bridge Re-Deck Project
Required Drawings and Info for Formwork or Scaffold Design
New Bridge Construction
Advisor: Professor M. Kevin Parfitt
Competency: Draw wall sections and details.
Rutgers University Law School Building Addition and Renovation Nathan E. Reynolds Advisor: M. Kevin Parfitt Structural Option The Pennsylvania State.
Mitre III Building McLean VA Debra Schroeder Structural Option.
Rail Program Management Services Review Grade Separation Recommended Ideas Palo Alto Rail Committee Meeting ……..
Presentation transcript:

RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E.

Coordination with Railroad Meet with Railroad Early in Project Development to Discuss Railroad Track Operations are Very Important Minimize Impact on RR Operations LOA and RR Agreement

Structure Type Selection and Bridge Design

Superstructure Considerations Safety –Highway Users –Railroad Required Span for Horizontal Clearance –Column Protection Adequate Vertical Clearance

Preferred Railroad Grade Separations 1. Overpass 2. UPRR Steel Deck Girder Standards 3. Deck Plate Girder w/ Steel Deck 4. Steel Girder w/ Conc Deck 5. Prestressed Beam w/ Conc Deck 6. Thru-Girder w/ Steel Deck

UPRR Deck Girder Standard Depth-Top / Rail to Low Chord = 5-5 Steel Deck 69 ft Max Span Length

Thru Girder Depth-Top / Rail to Low Chord = 4-6 Steel Deck 155 ft Max Span Length

Superstructure Considerations TxDOT Design Requirements UPRR-BNSF Design Guidelines KCS Design Guidelines Composite and Non-Composite Design No Sacrificial Beams Design for 30 Ballast Ballast Depth for Concrete Tie

Vertical Clearance Steel Deck Girder16.5 ft Steel Thru Girder-Bolt Bot Fl17.5 ft Prestressed Conc17.5 ft Hwy Over RR23.33 ft

Design Development and Review Process with Railroads

Railroad Underpass 30% Submittal - Exhibit A 60% Submittal 90% Submittal 100% PS&E Plans RR Agreement with Exhibit B

30% Submittal - Exhibit A Preliminary: –Bridge Layout –Track Plan and Profile –Track Typical Sections Structure Type Selection Report –Thru Girder LOA Facilitate RR Review

Structure Type Selection Report Required for Thru-Girder Design Factors Considered –Underpassing Roadway Width –Clear Zone –Vertical Clearance Consider All Options for Railroad

RR Requirements Sheets

60% Submittal Complete Bridge Plans Complete Mainline and ShooFly Track Plans and Profiles Railroad Track Standards Mainline and ShooFly Typical Sections

60% Submittal, ctd Track Sections every 50 ft Division of Labor Sequence of Work

90% Submittal Revised Complete Bridge Plans Revised Complete Mainline and ShooFly Track Plans and Profiles Mainline & ShooFly Typ Sections

90% Submittal, ctd Track Sections every 50 ft All Parts of PS&E that Affect the Railroad All Specifications

100% Submittal Complete PS&E That Affects RR Complete Bridge Plans Complete Mainline and ShooFly Track Plans and Profiles Mainline & ShooFly Typ Sections Sequence and Division of Work RR Agreement w/ Exhibit B Attachment

Mainline Bridge Replacement Shoo-Fly Construction

Track Plans & Sequence of Work Bridge Replacement on Mainline Longer Span and Increased Clearance Track Raise Shoo-Fly Construction Best Maintains RR Operations

Track Design Speed Railroad Operating Dept Determines Speed Mainline & ShooFly Same Speed ? –Existing Conditions –Future Upgrades –Design Speed Agreement

Railroad Track Grade Raise No Grade Raise is Desirable 6 Max Raise with Ballast Only Use Subballast for Greater Raises ShooFly Profile Grade Ballast Delivery May Be an Issue

Bridge Design and Track Design Resources

Bridge and Track Design Resources TxDOT and Individual Railroad Use TxDOT Annotated Guidelines –TxDOT Website BRG Project Development Web Page –BRG FTP Site AREMA and AASHTO

Bridge and Track Design Resources UPRR, BNSF, KCS Guidelines and Standards Updated Requirements and Standards TxDOT Bridge FTP Site: –Railroad Bridge and Track Design

Ballasted Track Construction Specification Bridge Division has a Reference Spec Available for Project Use Bridge Division is Working to Develop Statewide Special Spec

Thank You

Lloyd M. Wolf, P.E

Estimated Costs 2008 Bridge and Track

Estimated Railroad Costs 2008 Steel Deck Girder =$350 / SF with Steel Deck Steel Thru Girder =$450 / SF with Steel Deck Prestressed Beam =$225 / SF with Concrete Deck

Estimated Railroad Costs 2008 ShooFly Bridge with Open Deck = $350,000 / EA Temp Special Shoring = $60 / SF

Estimated Railroad Costs 2008 Ballasted Track =$240 / LF with 1 ft Raise Ballasted Track =$170 / LF No Raise Ballasted Track =$45 / LF Removal

Estimated Railroad Costs 2008 Turnout / Switch =$85,000 / EA Signal for Switch =$50,000 / EA Including Circuit

Estimated Railroad Costs 2008 Engineering Design Review = $ ,000 And Construction Inspection Railroad Flagging =$900 / Day

Mainline Track Raise at Turnout

Mainline Track Raise with Ballast Retainer