Presents. Clubhouse lower level Renovation December 2013.

Slides:



Advertisements
Similar presentations
Health Care Building Available for Sale! Immediate Delivery from our Bristol, IN plant. Call Don See Floor Plan and Specifications.
Advertisements

PARKVIEW APARTMENTS 20 Unit Rehabilitation & Site Work ISLA VISTA, CA. Joint Cities-County Affordable Housing Task Group October 23, 2008.
(Builder Marketing Message) (Builder Logo) Consider adding your logo to the master slide.
Quality Renovations. Welcome! New ceramic tile flooring, new light fixture and freshly painted.
CURRENT WORK West Wing - Exterior: Masonry and shingles finished, fascia and soffit work ongoing - 1 st Floor: Final coat of paint, casework installed,
Cathedral of the Immaculate Conception Project Information Session.
A Duplex Conversion the First Time Sandra Shuffler Change Manager, Investor, Mom.
WOOD LIGHT FRAME CONSTRUCTION
WEEKLY PHOTO REPORT WEEKLY PHOTO REPORT Week of: June 24 th, 2013 – June 28 th, 2013.
The 1990s & 2000s Church Building 1992 Church Platform.
Shiva Shakthi Realtors presents A Premium apartment at Pondicherry.
Kitchen New sandwich prep table. Kitchen New pizza prep table.
4/30/20151 Universal Design – Remodel Kitchen and Bath Tom Muxie.
2 Existing building 1 story metal 1972 Water Street CFA TechWorks! - Site Plan - Photo Index Number indicates photographer location Caption describes.
October 2009 Construction Progress. University City School District Bond Wolfe Architects – architect McCarthy Construction – construction manager Barbara.
Hogan Residence Bathroom Remodel Valued Repeat Customer Kitchen Remodel (see other presentation) Basement Bathroom Addition (see other presentation) Upstairs.
Padgett & Freeman Architects, PA Architecture Planning Interiors Haywood County North Carolina Adaptive Renovation Project for the Haywood County Department.
FAMILY ROOM & STAIRS Entertainment center & projection TV With pullout drawers Maximize under stairs space Half-wall, railing & spindles NOTES: Open room.
Welcome to 843 Long Hill Road Gillette, NJ Renovated Cape Cod With Incredible Vistas!
IET 120 CONSTRUCTION PROJECT Name: David Marcum. Dwelling  Number of Floors 2 Place image of your floor plan in this space.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 03.
Knights for hire is a full service insured and Class C licensed contractor licensed to do business in the state of Virginia. This Slide presentation captures.
Riverside Community Schools Overview of Summer Maintenance Projects.
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
University of Toronto Mississauga Campus Capital Projects University of Toronto Mississauga Campus: Capital Projects Erindale College Council | March 9,
General Contractors  Over 10 years of Service  Commercial  Military Institutions  Government Agencies  Female Owned and Operated Firm  Teamed with.
Chapter 26 Millwork and Cabinet Technology, Cabinet Elevations, Fireplace Details, Interior Wall Details Types of Millwork (Finish Work) Cabinet Layout.
Wall Framing Grimsby Secondary School Technology Dept.
Chapter 24 Millwork and Cabinet Technology, Cabinet Elevations, and Layout.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 04.
St. Peters School Carpeting and Refresh project October 5,6 and 7 th St. Peters School Carpeting and Refresh project October 5,6 and 7 th
Abney Enterprises L.L.C. Concessions International Cooler Addition Phase II Project.
INTERIOR PAINT & DRYWALL REPAIR Identify the tools needed to paint interior ceilings & walls Learn to repair damaged drywall Learn how to prepare rooms.
POV Renovations November 14,2014. Repairing the East Wall.
NMH – Bldg 16 – Combat Medic Bldg Pictures taken 6 Jul 2010 See also MS Word document titled, “REPAIRS AND IMPROVEMENTS NEEDED IN BLDG 16 - COMBAT MEDIC.
By Angela Forte, Michelle Gagnon, Kerri Morse, & Sam Oosterman.
Project Status The project is progressing well with both grading aspects and building components. The mason has erected many walls to “scaffold high”
Building for Learning Project Photo Progress Report 5 December 2009 – February 2010 Project commencement 21 st September 2009.
Prof Ralph V. Locurcio, PE CON 2001 CVE Sequence Single Family House - 3,000 square feet Duration 1 General Conditions 21 2 Apply for Permits.
CHATSWORTH HIGH SCHOOL. LOCNSNAMTASK_NAME 8583CHATSWORTH HSPURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD CHATSWORTH HSChatsworth.
Knights for hire is a full service insured and Class C licensed contractor licensed to do business in the state of Virginia. This Slide presentation captures.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Located strategically at the City of Flag, Imus Cavite.
Home looks better with us. Not staged Staged Start your home selling or remodeling project with a few questions…... Why do you think your house is not.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 02.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
Sauriol Bohde Wagner architects and associates, inc Garfield Road Macomb, Michigan ph fx.
TRIGON, INC ARDMORE CITY SCHOOLS 2013 BOND ISSUE PROJECTS.
Things to Know about Remodelling a Small Bathroom Ph. No.(914) or (888)
Rosemead.
Accessible Environment
TOBY ZACK DESIGNS LA MER
What’s with Time Square West? No. of Floors 43 Retail 1st and 2nd floor Parking 5 floors(2 basement, 3rd to 5th floor) No. of units 738 No. of parking.
Old world craftsmanship... timeless beauty.
* 07/16/96 Site Development Plan * ##.
Assembly And Installation Of Ikea Kitchen Cabinets
Come see this special home today!
The Steps for Basement Renovations
FLOOR PLANS CHAPTER 7 – PART 1.
Thank You! For More Details Visit us at Automotive Interiors Market.pptx Follow Us On.
1 Semester Project Design A Multi Story Office Building
INTD 503- Materials Topic: Wall Coverings
New White Lake Township Library
Minuteman Vocational Technical Regional High School Progress
WES Renovation Update Photo Gallery
Pacific Real Estate Solutions
$915, Mountain Vista Dr. Seattle, WA, Derek Williamson
Tile Installation Company in Dubai MI Empire Electromechanical Works.
Pacific Real Estate Solutions
Governors club interior renovation
Presentation transcript:

Presents

Clubhouse lower level Renovation

December 2013

Work Begins The following slides show the progression of work during the project of work during the project

Demolition Demolition of Men's washroom

Plumbing Relocation New Men's Washroom Existing Men's Shower

New Framing Framing of closet and new women's washroom New men's washroom entrance

New Framing Steel framing of ceilings to maximize height.

Drywall Drywall installation in progress Rounded corners on traffic exposed areas

Flooring Commercial grade Laminate flooring installation

Flooring Ceramic tile added to washrooms

Paint and trim Trim and paint completed

Kitchenette Cabinet installation

Storage New closet area New under-stair storage area

Before & After The following slides are before and after photos taken from after photos taken from approximately the same position approximately the same position.

Before

After

Before

After

Before

After

Before

After

Before

After

Before

After

Final Look The following slides show the completed Project and some fine details

Thank You Newson Interiors would like to thank all of the owners of Tweedsmuir on the Park for selecting us to complete this project. We hope years of enjoyment and entertainment are to come in the new space. Jeff.

Jeff Newson Owner/operator, Newson Interiors. newsoninteriors.com