TGy January Closing Report

Slides:



Advertisements
Similar presentations
Doc.: IEEE /1444r4 Submission Jan 2013 Adrian Stephens, Intel CorporationSlide Jan 2013 Motions Date: Authors:
Advertisements

Doc.: IEEE /0420r0 Submission March 2008 Bruce Kraemer, MarvellSlide Marvell Lane, Santa Clara, CA, TGn Closing Report Orlando, FL,
Oct 2007 Richard Paine, BoeingSlide 1 doc.: IEEE /2662r0 Submission 11k San Jose Ad Hoc Agendas Date:
Doc.: IEEE /1583r1 Submission November 2011 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac November 2011 Closing Report Date: Authors:
Doc.: IEEE /2263r1 Submission July 2007 Peter Ecclesine, Cisco SystemsSlide 1 TGy July Closing Report Date: Authors:
TGv Closing Report March 2008
IEEE TGv March 2010 Agenda Date: Authors: March 2010
Jan 2013 Motions Date: Authors: Jan 2013 May 2006
TGs Process, November Date: Authors: November 2007
IEEE TGz Vancouver Agenda
TGs Process, July Date: Author: July 2009 July 2009
TGaf San Francisco Closing Report
TGy January Chair’s Report
Closing Report Date: Authors: March 2010 March 2010
TGaf Waikoloa Closing Report
Closing Report Date: Authors: July 2010 March 2010
Closing Report Date: Authors: March 2010 March 2010
IEEE TGw May Closing Report
TGv redline between Draft 1.0 and 1.01
Closing Report Date: Authors: January 2008 January 2008
Closing Report Date: Authors: May 2008 May 2008
802.11REVmc Editor’s Report – May 2014
TGaf Geneva Closing Report
802.11REVmc Editor’s Report – Jan 2014
JTC1 Ad Hoc January 2009 Closing Report
TGs Process, July Date: Author: July 2009 July 2009
TGaf San Francisco Closing Report
IEEE TGaf Dallas Closing Report
TGaf San Antonio Closing Report
TGy March Closing Report
TGs Process, September Date: Author: September 2008
TGs Process, November Date: Authors: November 2007
Video Transport Streaming SG Orlando Opening Report
802.11REVmc Editor’s Report – Jan 2013
IEEE TGaf Singapore Closing Report
TGy March Report Date: Authors: March 2008 March 2008
TGs Process, November Date: Authors: November 2007
TGy Jan Opening Report Date: Authors: January 2008
TGaf Waikoloa Closing Report
IEEE TGaf DRAFT Meeting Plan and Agenda
TGs Process, July Date: Author: July 2009 July 2009
802.11REVmc Editor’s Report – Sept 2014
Closing Report Date: Authors: May 2010 March 2010
TGs Process, September Date: Author: September 2009
IEEE TGaf Palm Springs Closing Report
TGad March 2011 Closing Report
TGy Jan Opening Report Date: Authors: January 2008
11k Taipei Agendas Date:
TGs Process, September Date: Authors: September 2007
September 2009 Closing Report
TGad May 2011 Closing Report
Nov 2011 Closing Plenary Motions
November 2010 Closing Report
2019 March TGba Closing Report
TGs Process, March Date: Author: March 2009 March 2009
TGaf Orlando Closing Report
TGaf Nanjing Closing Report
TGs Process, January Date: Authors: January 2007
TGy March Report Date: Authors: March 2008 March 2008
TGi Final Report for the May 2004 Session
IEEE TGv November 2010 Agenda
TGaf San Antonio Closing Report
May 2008 Closing Plenary Motions
IEEE TGz Jacksonville Agenda
Closing Report Date: Authors: November 2007 November 2007
TGs Taipei Closing Report
IEEE mc Closing Report for May 2016
TGs Process, March Date: Authors: March 2008 March 2008
Closing Report Date: Authors: January 2010 January 2010
TGax November 2017 Closing Report
Presentation transcript:

TGy January Closing Report doc.: IEEE 802.11-08/0123r1 January 2008 TGy January Closing Report Date: 2008-01-15 Authors: Peter Ecclesine, Cisco Systems Peter Ecclesine, Cisco Systems

January 2008 doc.: IEEE 802.11-08/0123r1 January 2008 Abstract This submission summarizes the TGy activity for IEEE 802.11 Taipei (January 2008) meeting Peter Ecclesine, Cisco Systems Peter Ecclesine, Cisco Systems

January 2008 Motions (3) To authorize an 802.11y ad hoc Sponsor Ballot comment resolution meeting on February 11th and 12th in San Jose, CA starting at 12:00 ET Moved: Rich K (ETS-Lindgren) Second: Brian H. (Cisco Systems) Vote: Unanimous approval Motion: Passes Peter Ecclesine, Cisco Systems

January 2008 doc.: IEEE 802.11-08/0123r1 January 2008 Motions (4) Motion: Move to approve the comment resolutions for the 802.11y Sponsor Ballot, conditional on that ballot passing, and to reaffirm all comment resolutions in the opening meeting of 802.11's next plenary. Moved: Rich K (ETS-Lindgren) Second: Doug Chan (Cisco Systems) Vote: 5-0-0 Motion: Passes Peter Ecclesine, Cisco Systems Peter Ecclesine, Cisco Systems

Schedule Projected at Taipei (Jan) January 2008 doc.: IEEE 802.11-08/0123r1 January 2008 Schedule Projected at Taipei (Jan) January 2008 (Taipei, Taiwan) In Sponsor Ballot until Jan 30th Feb 11, 12 Ad Hoc SB Comment resolution, start 1st SB re-circ March 2008 (Orlando) Sponsor Ballot Comment Resolution, 2nd SB Re-circ ExCom Conditional Approval to end May 2008 (Jacksonville) WG Approval June 2008 RevCom Approval Peter Ecclesine, Cisco Systems Peter Ecclesine, Cisco Systems

Attendance Tuesday AM1: Peter Ecclesine (Cisco Systems) January 2008 doc.: IEEE 802.11-08/0123r1 January 2008 Attendance Tuesday AM1: Peter Ecclesine (Cisco Systems) Rick Kennedy (ETS-Lindgren) Doug Chan (Cisco Systems) Brian Hart (Cisco Systems) Eldad Perahia (Intel Corp) Dorothy Stanley (Aruba Networks) Peter Ecclesine, Cisco Systems Peter Ecclesine, Cisco Systems