Agenda 3.5 Manual on GTS cbs-16@wmo.int.

Slides:



Advertisements
Similar presentations
WMO TR (WMO-No. 49) WMO; OBS, Wenjian Zhang and Miroslav Ondráš.
Advertisements

World Meteorological Organization Working together in weather, climate and water Other Cross-Cutting Matters WMO Polar Activities and Global Cryosphere.
Enhanced Security Through Human Error Awareness PNNL-SA
© 2009 IDBI Intech, Inc. All rights reserved.IDBI Intech Confidential 1 Information (Data) Security & Risk Mitigation.
International Cyber Warfare & Security and B2B Conference Participation of Brazilian Cyber Defense Centre ( )
WMO WIS strategy – Life cycle data management WIS strategy – Life cycle data management Matteo Dell’Acqua.
ICG-WIGOS-6 Report from the Commission for Basic Systems
WIGOS regulatory and guidance material
WIGOS IMPLEMENTATION LEAD BY WORKING GROUP ON INFRASTRUCTURE
A proposed Security Incident Management Process for WMO Member States
How to keep WIS performance healthy
WIGOS Data Quality Monitoring System (WDQMS)
In partnership with GCOS
OPAG on Integrated Observing Systems
Outcome of the ET-CTS Meeting (Toulouse, May 2008)
Training, Documentation and Manpower needed at ROC
Agenda Item 3.4 Manual on WIS
Agenda 5.10 CBS Working Structure
California Cybersecurity Integration Center (Cal-CSIC)
Regional Basic Observing Network Concept
Regional Basic Observing Network Co-chair, CBS/OPAG-IOS
RA II Regional priorities
Agenda 5.11 General Regulations
WIS overview Submitted by: Secretariat (Doc 02b)
Strategy on Service Delivery
WIGOS Pre-operational Phase
Agenda item 2.3 Report of OPAG ISS Matteo dell’Acqua
WMO IT Security Incident Process
سيستم مديريت امنيت اطلاعات
5. STATUS OF THE PRIORITY AREAS IMPLEMENTATION OF THE PLAN FOR THE WIGOS PRE-OPERATIONAL PHASE (PWPP) 5.2 WIGOS Regulatory Material complemented with necessary.
REPORT BY THE CHAIR OF THE OPEN PROGRAMME AREA GROUP ON THE DATA-PROCESSING AND FORECASTING SYSTEM Ken Mylne
Secretariat 12 to 16 February 2017 Abu Dhabi, UAE
AGENDA ITEM 4.1: DISASTER RISK REDUCTION, RESILIENCE AND PREVENTION FOCUSING ON IMPACT-BASED DECISION SUPPORT SERVICES 4.1(3) FLOOD FORECASTING WMOI RA.
Overview of the WMO Integrated Global Observing System (WIGOS)
Doc (1) Vision for WIGOS in 2040
Dr Sue Barrell, Australia
Secretariat 12 to 16 February 2017 Abu Dhabi, UAE
Decisions on CBS activities to support WMO priority activities
WIS Strategy – Toward WIS 2.0
Review of the WMO Guide to Public Weather Services Practices
Decisions and Recommendations for the
WIS Strategy – WIS 2.0 Submitted by: Matteo Dell’Acqua(CBS) (Doc 5b)
ICG-WIGOS January 2017 CAeM Report Jitze van der Meulen
Doc 4.1(4) – Severe Weather Demonstration Projects in RA-II
Decisions on the development of WIGOS and the Space Programme
Terms of Reference WWW, PWS, Space
Terms of Reference WWW, PWS, Space
INNOVATION AND RESOURCES
Module 5 Improvement/upgrade plan
Status of RA II WIS Implementation Plan
Decisions on the development of WIGOS and the Space Programme
Status of Existing Observing Networks
Doc 4.6(1): Seamless Data-processing and forecasting System
ET-CAC Report Kevin ALDER Agenda item 6-3 (1)
Decisions and Recommendations for the
ICT-ISS July 2014 WMO; OBS/WIS.
Audit Criteria Mark Francis ET-WISC/TT-DC Agenda item 10
ET-WISC structure and work plan
Working with Regional Associations
WIGOS regulatory and guidance material
Doc 4.6(2): Implementation of Forecast verification activities, High Resolution NWP and Impact-Based Forecasting and Warning Xu Tang D/WDS
SCREENING SCOPING SEA QUALITY CONTROL DECISION
Introduction to CBS-16
Dr Anthony Rea, Australia, Chair, OPAG IOS
Cg-18 Special Sessions Topic 4; Infrastructure -
Item V.11 – Discussion Managing WIS
Information Management Framework
WIS Project Office WMO Managing WIS WIS Project Office WMO
Highway Infrastructure Safety Inspections
4. STATUS OF THE PRIORITY AREAS IMPLEMENTATION OF THE PLAN FOR THE WIGOS PRE-OPERATIONAL PHASE (PWPP)   4.4 Development and implementation of the WIGOS.
Presentation transcript:

Agenda 3.5 Manual on GTS cbs-16@wmo.int

Rec 3.5/1 – Amendments to GTS Manual WIS RTH routeing Roadmap Only MTN RTH were defined in Vol I Non MTN RTH were listed in Vol II Vol I now lists all RTHs and area of responsibilities Routeing to utilise WIS core network Major step in WIS evolution Essential for All Hazards Warning Network 2 minutes end to end distribution cbs-16@wmo.int

Rec 3.5/1 – Update Security Practices Manage Risk – reduce likelihood Maintain Physical and Cyber Security Update Guide to IT Security Update GTS VPN Guide Mitigate impact Incident response process See Annex 3 to draft Decision 5.5(2)/1 on WIS Security Incident Management Process CBS-16 Doc 5.5(2) cbs-16@wmo.int

INTEGRATED WWW MONITORING (IWM) Decision 3.5/1 & Annex 1 Maintain WWW and WIGOS QM systems in parallel Necessary to assess trends in GOS Continue IWM at 4 times/year Synop @00,06,12,18z & Upper @00,12z Centres encouraged to include hourly synop and all upper air in IWM reports Update Guide to IWM cbs-16@wmo.int

Thank you Merci cbs-16@wmo.int