Presentation is loading. Please wait.

Presentation is loading. Please wait.

WIS Project Office WMO wis-help@wmo.int Managing WIS WIS Project Office WMO wis-help@wmo.int.

Similar presentations


Presentation on theme: "WIS Project Office WMO wis-help@wmo.int Managing WIS WIS Project Office WMO wis-help@wmo.int."— Presentation transcript:

1 WIS Project Office WMO wis-help@wmo.int
Managing WIS WIS Project Office WMO

2 Managing WIS (WMO Information System)
Manuals Guidance material Changing the rules for WIS 2

3 Manual on WIS Manual on GTS Manual on Codes
Manuals Manual on WIS Manual on GTS Manual on Codes

4 Manual on WIS Organization and responsibilities Designation procedures
Functions of WIS Technical Specifications WIS Discovery Metadata

5 Manual on WIS Organization and responsibilities Designation procedures
1.1 GISC, DCPC, NC 1.2 Comply with requirements 1.3 WIS Core Network & AMDCNs 1.4 Part A and Part B 1.5 Discovery, Access Retrieval 1.6 Robust and reliable 1.7 Collect and disseminate Organization and responsibilities Designation procedures Functions of WIS Technical Specifications WIS Discovery Metadata

6 Manual on WIS Organization and responsibilities Designation procedures
Functions of WIS Technical Specifications WIS Discovery Metadata 2.1 General 2.2 Designating GISC 2.3 Designating DCPC 2.4 Designating NC 6

7 Manual on WIS Organization and responsibilities Designation procedures
Functions of WIS Technical Specifications 3.1 General 3.2 Procedure for GISC formal tests 3.3 Procedure for DCPC demonstration 3.4 Procedure for NC PR notification

8 Manual on WIS Introduction Organization and responsibilities
Designation procedures Functions of WIS Technical Specifications GISC Receive information Exchange with GISCs 24h Cache (global) Metadata catalogue Networks (AMDCN) Recovery Performance monitoring

9 Manual on WIS Introduction Organization and responsibilities
Designation procedures Functions of WIS Technical Specifications DCPC – for Programme Collect/produce data Data - global exchange Disseminate - Prog Request/reply Metadata Recovery Performance monitoring

10 Manual on WIS Introduction Organization and responsibilities
Designation procedures Functions of WIS Technical Specifications WIS Discovery Metadata NC – Programme role Collect data, Products Produce information Provide data, Products Create Metadata Performance monitoring

11 Manual on WIS Introduction Organization and responsibilities
Data and products should be handled as specified in the Manual on the Global Telecommunication System (WMO-No. 386), Volume I, Part I, 1.3, Design principles of the GTS, and other WMO manuals, specific to the relevant programme See also (Disseminate information to the GISC area) and (Provide information intended for global exchange). Introduction Organization and responsibilities Designation procedures Functions of WIS Technical Specifications _________________________________ e.g. WIS-Tech-Spec-12 This specification requires that data or products downloaded shall be represented and communicated in a manner appropriate to the relevant programme.

12 Manual on WIS 2013 edition added
Section 5 – WIS Discovery Metadata (v1.3) Rules for managing metadata standard Rules for metadata content and format Cg-17 approved CBS Ext 2014 addition of many further sections

13 Manual on Codes Defines Traditional Alphanumeric Codes (discouraged)
Table Driven Code Forms GRIB BUFR CREX Code tables to support these Recently: Logical Data Model, XML representations …

14 GTS as Part A of WIS GTS - continued consolidation and further improvements for data and products delivery Time-critical and operation-critical delivery based on real-time “push” via dedicated telecommunications Timely delivery based on delayed mode “push” via combination dedicated + public networks

15 Relevance of Manual on WIS
Rules for operating WIS Part A Conventions used in WIS File naming Abbreviated Header Lines

16 Formal Guides and WIS wiki WIS help
Guidance material Formal Guides and WIS wiki WIS help

17 Guidance material - http://www.wmo.int/wis
WIS GTS …/GTS-manual …/GTS-security …/GTS-VPN Tech Reg 49 …/TechReg49

18 WIS help Each GISC offers a help desk Exeter/Toulouse: from “help” tab
Offenbach: from “You need help?” at bottom of page Tokyo: Beijing: under “user registration” Questions on implementing WIS can be sent to the WMO team using

19 Changing the rules for WIS
Operational information Developing changes to WIS Approving changes to WIS

20 Operational Information
Now: WMO No 9, Vol C1 (bulletins) RTH tells WMO of planned changes Discovery metadata records must be updated Planned: Information in Vol C1 extracted from discovery metadata Responsibility passes to data originators to notify changes by updating discovery metadata

21 Developing changes to WIS
Requirements assessed by OPAG-ISS and its expert teams Expert Team develop and test solutions Proposals recommended by ICT-ISS CBS-Management Group CBS Approved by EC (for changes to Manuals) “Fast track” for codes and metadata changes Fast track approved by Cg-17 for all CBS tech regs

22 Exercise You are responsible for implementing a WIS NC at your centre. What do you have to put in place? Consider both equipment and work procedures.

23 Sources of information
Manual on WIS Guide to WIS

24 Topics you may have discussed

25 Implementing a National Centre
Agree DCPC/GISC Metadata Describe all data to be published Procedures, including authorisation, for maintaining metadata Metadata editing tool Data Production Formats Delivery Training Staff Users Publicity Internal External

26 Summary Formal documentation of WIS Guidance and support material
Making changes to WIS standards


Download ppt "WIS Project Office WMO wis-help@wmo.int Managing WIS WIS Project Office WMO wis-help@wmo.int."

Similar presentations


Ads by Google