Final Design CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE.

Slides:



Advertisements
Similar presentations
CR7-FMD, 19 March 2007Jens Jørgen Gaardhøje, Niels Bohr Institute 1 Forward Multiplicity Detector FMD 1 FMD 3 FMD 2 Outer ring Inner ring.
Advertisements

Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
PANDA Mechanical Workshop Backward Endcap Calorimeter Geometry David Rodríguez Piñeiro GSI Darmstadt PANDA Mechanical Workshop GSI
CERN, the 9th of Nov FEA Updates on Structures (overall ID model) University of Geneva: G. Barbier, F. Cadoux, A. Clark, D. Ferrère, M. Weber.
PKI-Anwendungen 6/2/ Base framework. PKI-Anwendungen 6/2/ Bottom frame.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
SPACE FRAME Interface between the LGT and the IST 21/06/2011 Marco Ciapetti.
JLC CDC The total numbers of wire : The total wire tension : 50 t Material : outer cylinder mm thick CFRP end-plates mm thick aluminum.
1 SBS Spectrometer / GEP5 Conf.. 2 Tracking Requirements Requirements Tracking Technology DriftMPGDSilicon High Rate: MHz/cm 2 (Front Tracker)
Ans Pardons 30/11/2006CNGS Reflector Technical Review CNGS reflector: Status Work remains to be done… 30/10 Introduction Drain connection Event analysis.
CGEM-IT project update Gianluigi Cibinetto (INFN Ferrara) on behalf of the CGEM group The BESIII Winter Collaboration Meeting Huangshang University - November.
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
1 CLAS12/Central Tracker review. Saclay 12/09 Stéphan AUNE Central Tracker review Micromegas central & forward tracker  R&D and prototypes  CAD implantation.
Itzhak Tserruya, BNL, Aug. 11, Itzhak Tserruya Weizmann Institute, Israel BNL, Upgrades Meeting, Aug. 11, 2004 HBD: Infrastructure and Integration.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
Zian Zhu Magnet parameters Coil/Cryostat/Support design Magnetic field analysis Cryogenics Iron yoke structure Mechanical Integration Superconducting Magnet.
New BESIII Inner Tracker Possible layouts A. Calcaterra, LNF, Apr 2013.
The new set of MWPCs for CB Collaboration Meeting Glasgow March 2006 A. Braghieri, P.Pedroni.
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
Argontube Detector design Laffranchi Marco, Meregaglia Anselmo, Messina Marcello, Rubbia Andre’ Bern,
VLVnT11 - Erlangen 12-14/10/ Giorgio Cacopardo NEMO Phase2 mechanical design G. Cacopardo on behalf of NEMO collaboration.
Mechanics and granularity considerations of a Tile hadronic calorimeter for FCC hh barrel Nikolay Topilin/Dubna+ Sergey Kolesnikov/Dubna Ana Henriques/CERN.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
Bubble Chamber Radiator Thermal Analysis 5.0 MeV, 9.5 MeV Beam Energy Fredrik Fors Mechanical Engineering 8/20/2015.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
Redesign of LumiCal mechanical structure W.Daniluk, E.Kielar, J.Kotula, K.Oliwa, Wojciech Wierba, L.Zawiejski Institute of Nuclear Physics PAN Cracow,
LSTs in the IFR gaps Workshop on IFR replacement SLAC November 14, 2002 L. Piemontese INFN Ferrara.
Results on a Large Area triple-GEM Detector at LNF 5 th RD51 Collaboration Meeting Freiburg, 25 May 2010 D. Domenici - LNF.
1 David Santoyo sLHC OXFORD 17/06/2010 EC Structure Review ? ? ? ? ? ? IFIC-Valencia.
FGT Magnet C Assembly metric tons (59 US tons) -100mm thick steel plates -6.6m high x 3.1m wide x 1m deep (outer dimensions) -5m high x 2.25m wide.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
Central Tracker Cabling and Mechanics Paola Gianotti26/4/111.
Overview of the MEG * CDCH * one of the following ( MEG UP MEG2 MEG + ) Marco Grassi on behalf of the CDCH Group.
Large GEM prototype production NS2 technique. Reminder NS2 technic 10 to 15mm Readout connector O-ring Drift electrode Free to slide External screws to.
14-oct-2014 GEM detector configuration 1 12 stations: Z = 30 – 45 – 60 – 80 – 100 – 130 – 160 – 190 – 230 – 270 – 315 – 360 Stereo angles: 0 – 7.5 deg.
14-oct-2014 GEM detector configuration 1 12 stations: Z = 30 – 45 – 60 – 80 – 100 – 130 – 160 – 190 – 230 – 270 – 315 – 360 Stereo angles: 0 – 7.5 deg.
Concept for LOKI detector system. Rear Detector 2 Spider Cob (central detector) Octant (Out detector) Maybe subdivided in two parts.
1)– CENTRAL TRACKER INTEGRATED ITEMS: > Central Tracker, “Assembly & Insertion Auxiliary Structure”. > “CSF”- Central Tracker Support Frame (In collaboration.
Rosier Ph. – IPNO – Detector Dpt. – 30/10/2012GASPARD Padova meeting 1/13 Mechanical engineering for GASPARD Unité mixte de recherche CNRS-IN2P3 Université.
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
“CENTRAL SUPPORT FRAME” -
STRAW TRACKER SYSTEM CAD STATUS :
Major Changes in D27DT Engine
MECHANICS OF THE FORWARD STRAW TUBE TRACKER (preliminary) Federico Evangelisti INFN - Ferrara GSI - 7/11 dicember 2009.
new straw end plug: D=10.6 mm straws support frame Levan option
Entrance Muon Counter (EMC)
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
KEK IR status Shuji Tanaka KEK DEPFET workshop 2011/2/7-9 1.
PANDA Yoke of the Magnet
Preliminary Y-chamber specifications – First draft
BoNuS: Radial-Drift TPC using Curved GEMs
Mauro Savrie' INFN Ferrara
Integration issues at IHEP
Requirements of the support mechanics
(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1
First of all we will remind some numbers:
Numerical simulations on single mask conical GEMs
SIT AND FTD DESIGN FOR ILD
ILD-0 overall dimensions C.Clerc ILD meeting, Seoul 17/02/09
SiD Engineering Status Report
CDC Structure S. Uno KEK
Challenges for FCC-ee MDI mechanical design
GEM-based Digital Hadron Calorimetry for SiD
GEM-based Digital Hadron Calorimetry for SiD
CDC structure Shoji Uno (KEK)    July-8, 2009.
Covering a Large Area ILC-TPC endplate
Single Detector Design
BGC Collaboration Meeting –
Presentation transcript:

Final Design CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE

Layer_3 East Side West Side Anode Permaglas Rings Readout Electronics Gem_3 East Side Gem_2 West Side Gas Connector Gem_1 Cathode H.V. board Sevice Flange In the Layer_3 the electronic readout size has been reduced and we have changed the geometry of the Service Flange. Now a total length of detector is 1036.6 mm. CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE

Layer Assembly Connecting Bracket to connect L2 to L3 The three layers are mechanically fixed by flanges and brackets Connecting Flange to connect L1 to L2 CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE

Fixing Detector East Side West Side Supporting Flange Supporting The detector is fixed by two Supporting Flanges that have a dual function: the outer diameter fastening the detector and the beam pipe the inner diameter aligns the beam pipe with beam Beam Pipe CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE

Supporting Flange Assuming a total weight (detector + beam pipe) of 200 Kg we get a max Stress of 22 Mpa and a Total Deformation of 0,19 mm Safety Factor 𝛾= 𝜎 𝑠 𝜎 𝑒𝑞 ≅10 Material: Permaglas EPGC203 𝜎 𝑦 =240 MPa CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE

West Side Space Available New ring thickness 2mm In the West side we have 2,6 mm from the board to the New Ring Sealing cylinder New Ring Remained west flange CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE

East Side Space Available First ring of outer chamber East flange East flange In the East side we have 4,6 mm from the board to the East flange Sealing cylinder East flange CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE

Radial Space Available Sealing cylinder Considering a thickness of 1 mm sealing cylinder we get a gap of 1.8 mm from detector to cylinder CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE