WG Integrated Testing in Pilot River Basins

Slides:



Advertisements
Similar presentations
River Fish Intercalibration group Coordination: D. Pont,Cemagref, France) N. Jepsen (JRC Ispra)
Advertisements

European Commission, DG Environment Unit B.1: Water, the Marine and Soil TAIEX Seminar « Management of Water Resources: River Basin Management in the Baltic.
European Commission, DG Environment Unit B.1: Water, the Marine and Soil Joachim D’Eugenio Slide 1 The Common Implementation Strategy (CIS) for the Water.
DISTRIBUTION AUTOMATIC - GENERATION
Pilot River Basin Network: Environment Directorate
Background CRiteria for the IDentification of Groundwater thrEsholds BRIDGE Project Presentation Contract N° (SSPI) Co-ordinator: BRGM (Fr)
Working Group on Data, information and knowledge exchange
WG B Progress report Water Directors meeting Mondorf May 20 and 21
New Work Programme and mandates 2005/2006
Support to National Helpdesks
WG 2.B Integrated River Basin Management
WG 2.B Integrated River Basin Management
Support to National Helpdesks
Patrick Staes and Ann Stoffels
HEDIC Health expenditures by diseases and conditions
Horizontal Guidance on Wetlands
CAF Activities.
Twelfth Meeting of the Management Group on Statistical Cooperation
DG Environment, Unit D.2 Marine Environment and Water Industry
1st Implementation Report of the Water Framework Directive
Proposed CIS Workshop on WFD Economic Issues
Pilot River Basin Workshop Common Implementation Strategy
INTEGRATED TESTING OF GUIDANCE DOCUMENTS IN PILOT RIVER BASINS
Marine Strategy Framework Directive: Transposition and Implementation
SSG on WFD and agriculture
JRC-Institute for Environment and Sustainability
Development of a protocol for identification of reference conditions, and boundaries between high, good and moderate status in lakes and watercourses (REFCOND)
Activity on WFD and Agriculture
Water Directors’ Meeting Common Implementation Strategy
Proposal Mandate Increased networking Sharing of Experience
London Water Directors Meeting
Discussion on compliance checking
Pilot River Basin Outcome Report of Phase 1b.
Horizontal Guidance on Wetlands Rome, 12nd June
Outcome and Perspectives Pilot River Basin Workshop
Cost Effectiveness Analysis Questionnaire Results
Activity on environmental objectives and exemptions
"Financing Natura 2000 Guidance and Workshops”
Horizontal Guidance on Wetlands What happened since the last Meeting
Update on progress since last WG meeting (13-14 June 2002)
Meeting of the WFD CIS Working Group 2A ECOSTAT Introduction & objectives Presented by Anna-Stiina Heiskanen Joint Research Centre The Institute.
Horizontal Guidance on Wetlands
Outcome of 2^ Seminar of the WG 2.7 Roma, January
INTEGRATED TESTING OF GUIDANCE DOCUMENTS IN PILOT RIVER BASINS
REPORTING ON DELIVERY OF EU BIODIVERSITY ACTION PLAN
Marine Strategy Framework Directive: Transposition and Implementation
Agenda item 6.1 MID-TERM REPORT OF THE EU 2020 BIODIVERSITY STRATEGY
on a protocol for Intercalibration of Surface Water
WFD, Common Implementation Strategy  Water Scarcity and Droughts Expert Group Madrid, February 17, 2010.
Project 2.7 Guidance on Monitoring
WG 2.B Integrated River Basin Management
Research as a new activity of the CIS WG 2B
Debate on Climate Change and Water Water Directors’ meeting Slovenia June 2008 Marieke van Nood, Unit D.2, DG Environment, European Commission.
Water Directors’ Meeting Working Group D (Reporting) activities
Fitness Check EU Water Policy
Pilot River Basin exercise.
Pilot River Basin Water Framework Directive.
Integrated Testing in Pilot River Basins
Water scarcity & droughts
State of play of PRB activity within WG B
Common Implementation Strategy for the Water Framework Directive
WG Integrated Testing in Pilot River Basins
Water Science-Policy Interface (CIS-SPI) Progress report
Evaluation of Public Administrations‘ Added Value to the Lisbon Strategy Goals Dr Gordana Žurga.
River Fish Intercalibration group D. Pont,Cemagref, France)
Water Director's Meeting December 2013, Vilnius DG Environment
Thierry davy Representative of the french water agencies
Prodcom Statistics in Focus
Horizontal Guidance on Wetlands Brussels, 5th May
Why are we reviewing reference conditions in intercalibration?
Presentation transcript:

WG 4.1 - Integrated Testing in Pilot River Basins Water Directors Meeting November 2002 Project description (Task Packages): TP1. Co-ordination TP2. Selection of Pilot River Basins TP3. Exchange platform among MS TP4. Integrated testing of various guidance approaches Integration of GD Evaluation of PoM Development of RBMPs TP5. Dissemination of results

TP2. Selection of Pilot River Basins Proposals endorsed by the Water Directors at the June 2002 meeting in Valencia B, F, NL (Scheldt), D, F, Lux (Moselle-Sarre) France (Marne) Ireland (Shannon) Denmark (Odense) Finland (Oulujoki) Portugal (Guadiana) Spain (Júcar) Greece (Pinios) Hu, Ro (Szamos) CZ, D, PL (Neisse) New proposals November 2002: Italy (Tevere, Cecina) Norway ( Suldalsvassdraget)

The Suldalsvassdraget River Basin The Suldalsvassdraget (Western and Northern Norway) representative of the characteristics of the Nordic region. (large pristine areas, ecological complexity heavily impacted by hydropower production) Small to medium catchment area (1.460 km2). The PRB closely related to ongoing river basin management programmes at national and regional level Co-ordination and integration with other Nordic PRB Compliance with all criteria

The Mediterranean Dimension Tevere: Size of the catchment 17.400 km2. Integration of national regional and local authorities. Cecina: Size of the catchment 903 km2. The RB is involved in several national programmes regarding renaturalisation of the riverbed and recovery of the fluvial ecosystems.  Compliance with all criteria

The Szamos International River Basin The Szamos river shared by Romania (15.740 Km2) and Hungary (141 Km2). Represents ecoregion 10 and 11. The Romanian partners agreed on commitment and resources. GD to be tested have been identified. Co-ordination with Hungary

General Overview Moselle-Sarre: December 2002. ICPMS. External workshops. WB testing. Marne: WB testing. Co-ordination and interaction activities. 2003 Shannon: December 2002 (familiarisation with GD) Odense: 2003. Preliminary results: April 2003 Oulujoki :(2002 - 2003) Preliminary results: April 2003 Jucar: (2003 - 2005). GW quantitative/chemical status Cecina : End 2002 Suldalsvassdraget: January 2003. Preliminary results: April 2003

Issues to be clarified For the Scheldt: Situation of the INTERREG proposal For the Szamos and the Neisse: Present situation concerning the commitment of the countries concerned (Hungary, Romania, and Poland, Czech Republic, Germany) For the Tevere, Cecina and Suldalsvassdraget: Approval for the WD

TP3. Organise an Information Exchange Platform Action I Overview of projects carried out in each country on testing at river basin scale Questionnaire sent to authorities and institutions Action II “Establishing the Basis for Testing in Pilot River Basins” Reviewed the PRB proposals Discussed how to conduct an integrated validation of the Guidance Documents (involvement of co-ordinators of PRB activities and WG leaders).

TP3. Organise an Information Exchange Platform Description of PRBs (team resources, envisaged work, major pressures). What integrated testing of GD means? Organisation of information exchange (feedback mechanism - expert network) Integration into WFD CIS process. What are we expecting from the output of the PRB testing? How do we ensure the build-up of PRB network interactions? Terms of reference

Terms of Reference (ToR) The Integrated Testing is a front-runner of the actual implementation (focus on Key Issues of particular relevance). The objectives of the integrated testing are set around two deadlines: the first covering the 2002-mid 2004 period, the second aiming at the end of 2005.

Terms of Reference (ToR) A phased approach: Phase I: Focus on testing of Key Issues, set up an on-line dynamic feedback and information exchange, and identify new Issues The time frame: till mid 2004 Concentrating primarily on issues in the Guidance Documents related to the reporting commitments on Article 5 due March 2005.

Terms of Reference (ToR) A phased approach (cont.): Phase II: Develop a comprehensive manual (experience gained, problems faced and solutions proposed leading to a potential revision of the GDs). Continuation of information exchange. The second phase will end during the third quarter of 2005.

Terms of Reference (ToR) A phased approach (cont.): Phase III: Extend the integrated testing to issues in the Guidance Documents not considered in the previous Phases. Contribute to producing a Program of Measures and a River Basin Management Plan. The work envisaged during this Phase would initiate during the second half of 2004.

Terms of Reference (ToR) Timetable: Finalise ToR Platform information exchange by the end of the year 2nd Workshop early 2003

PRBs in the Candidate Countries Some Candidate countries have presented a PRB or mentioned their intention to submitt a proposal: Nitra (Slovakia), Harju (Estonia) Daugava (Latvia) Hungary Slovenia Romania Czech Republic Issue to be clarified Relationships with the ISPA initiative (preparation of the ToR) and relative timetable

TP3. Organise an Information Exchange Platform Workshop 2: The objective of the Workshop “State of art of the Pilot River Basin testing exercise” is to review activities in ongoing PRB projects share information. Moreover establish the starting point for the PRB in candidate countries (Ispa funded).

Issues for comment by the WD Clarification on several PRBs proposed by Member States and Candidate Countries: the Scheldt, Neisse, Szamos. Approve the proposals: Tevere, Cecina and Suldalsvassdraget Point of view on ToR document. Pilot River Basin proposed by Candidate countries through Ispa funds to be formally presented.