1 State of play of PRB activity within WG B

2 The minutes of the PRB kick-off meeting on
4 July 2005 pointed out that 12 PRB were willing to take part in WG B activities.

3 Bilateral collaboration with RTD projects Pilot RBMP planning process
PRB CEA Water scarcity Bilateral collaboration with RTD projects Pilot RBMP planning process Cecina (It) Gascogne (F) Harju (Est) Jucar (Sp) Krka (Slo) Neisse (G,Po,CR) Odense (Dk) Pinios (Gr) Suldal (No) Tevere (It) Weser (G) Zagyva-Tarna (Hu)

4 Gascogne PRB (Fr)  The main objective of the PRB is to support the identification and the implementation of adapted measures to reduce the impact of agriculture concerning water pollution. In this framework, PRB managers intend to provide contributions on : cost-effectiveness analyis draft programme of measures in a collaborative and Iterative process Detailed timetable to be defined, depending on WG B deadlines

5 Odense PRB (Dk) Main environmental problems are related to discharge
of nutrients into the aquatic environment from grown fields and from sewage outlets causing eutrophication of surface waters. Planned tasks are : Integrated programme of measures Provisional RBMP Standardized data (key indicators) of pressure, impact and programme of measures.

6 Odense PRB (Dk)  In the preparation of the programme of measures,
several analyses will be carried out, of which : -Scenarios on measures to reduce nutrient-pressure, organic load of small streams and physical impact of surface waters 2nd half 2005 and 1st trimester 2006 -Cost-effective analysis for the programme of mesures  Odense PRB outcomes will be included into WG B reports.

7 Suldal PRB (No)  The Suldal PRB is representative for the topography,
hydrology, settlement patterns and human influences prevailing in the North Atlantic coastal region of Norway.  The river basin is heavily impacted by hydropower regulation.  Focused topics are: -CEA with special emphasis on effects of measures implemented in regulated rivers and lakes. -Proposal for important elements in a RBMP for Suldal RB.  Detailed timetable to be defined

8 Weser PRB (G) Main water management issues are : restoring river
continuity, fish spawing areas and juvenile habitats.  Planned objectives are : to refine the main water management issues to develop measures in watercourses, transitional and coastal waters to define measures in order to achieve the good ecological potential in HMWB -to develop a catalogue of different measures, especially for municipal surface waters  Detailed timetable to be defined

9 Next steps WG B will provide the 12 PRB with WG B draft documents :
PRB will be invited to give their comments by end 2005 PRB will be invited to provide inputs by January 2006 at the latest, in order to illustrate WG B draft documents with concrete case studies.