South African Wind Market Entry Study Presentation by David Williams, 24 June 2013.

Slides:



Advertisements
Similar presentations
STELLENBOSCH UNIVERSITY your knowledge partner New Centre for Renewable and Sustainable Energy Studies (CRSES) Thomas Harms - Department of Mechanical.
Advertisements

Division: EIDD WTO TBT Workshop on Good Regulatory Practice March 2008 Focus on Transparency and Consultation.
INTERNATIONAL FINANCIAL CONSULTING EGTT Workshop, September 27-29, 2004 Montreal, Canada Are Export Credit Agencies and Other Traditional Sources of Infrastructure.
Bank Guarantees and Indemnities 26 th August 2013 Abdul Yassim Vice President Trade and Working Capital 1 Absa presentation title Date of presentation.
RENEWABLE ENERGY 29/03/2012 Green Industries, Department of Trade and Industry.
Lambeth Low Carbon Economy What is the low carbon economy? What is a green business? What is a green job? Jeremy Keates.
Motivations for a Socially- Owned Renewable Energy Sector: A South African Case Study Dinga Sikwebu National Education Coordinator.
UNFCCC Workshop on Innovative Options for Financing the Development and Transfer of Technologies September 2004 Private Sector Perspectives on Risk.
Tendering Yuck!.
Introduction to Public Private Partnerships
REGULATORY AND INVESTMENT CHALLENGES IN HYBRID POWER MARKETS IN DEVELOPING COUNTRIES REGULATORY AND INVESTMENT CHALLENGES IN HYBRID POWER MARKETS IN DEVELOPING.
LEAVING A POSITIVE LEGACY. Future generations of Vermonters will benefit. Choosing clean energy sources, like wind, is the responsible thing to do. As.
PRESENTATION ON THE KZN PROVINCIAL PERSPECTIVE ON B-BBEE IMPLEMENTATION SMME/B-BBEE CONFERENCE DURBAN, ICC 31 August 2010.
SOUTH AFRICA’S RENEWABLE ENERGY INDEPENDENT POWER PRODUCER PROGRAMME (REI4P) 2014 REVIEW REPORT:
Eskom CSP / Solar Augmentation Conference CSP Project Development Marc Immerman Director Solafrica.
DEPARTMENT OF TRADE AND INDUSTRY INCREASING ACCESS TO FINANCE.
Black Business Council 7 June South African partner : 40 % 2. Local content, job creation & BEE: 30 % 3. Contribution towards local community.
THE DEVELOPMENT OF THE BRONKHORSTSPRUIT BIOGAS PROJECT
Jeff Delmon FEU Financial Solutions World Bank. Why PPP? Procurement efficiency Lifecycle management Design/construction/operation management Monetizing.
RENEWABLE ENERGY HAS BEACHED IN BARBADOS INTEGRATING A HIGH SHARE OF RENEWABLE GENERATION IN THE BARBADOS GRID WILLIAM HINDS CHIEF ENERGY CONSERVATION.
Community Based Clean Energy. The Opportunity To set a precedent for effective private sector partnerships, To maximise the local economic development.
+ DOING GOOD WIND BUSINESS IN SOUTH AFRICA – EWEA 2014 Johan van den Berg CEO, SAWEA.
Turbine Supply Agreements
New Procurement & Delivery Arrangements for the Schools’ Estate Presentation to Strategic Advisory Group 18 April 2005.
ENHANCING THE POLICY FRAMEWORK FOR SUSTAINABLE ENERGY INVESTMENT Guidance from the OECD to developing and emerging economies Karim Dahou, Investment Division,
“Wind Power for Local Economic Development: South Africa leading the Way”
Community Benefit in Public Procurement April 2010.
POWER SECTOR POLICY OVERVIEW ASSOCIATION FOR POWER UTILITIES OF AFRICA (APUA) SCIENTIFIC COMMITTEE CONFERENCE Presentation by Mr. M. Mulasikwanda Department.
Stephen Boyd, Assistant Secretary, Scottish Trades Union Congress.
Thabo Masombuka Chief Executive Officer (CE0) CSCC TRANSFORMATION TRENDS IN THE CONSTRUCTION SECTOR 13 August 2014.
An electricity strategy for South Africa Hein Reyneke Country Manager, South Africa October 2014 PCTI/ /CoB/MRP/79.
Technical Due Diligence Renewable Energy We build with Passion!
South African Wind Energy Programme A Otto 2 nd Annual Wind Energy Seminar 28 September 2010, Gallagher.
Business Model for an Industrial development agency
Oportunities in the Italian PV market. Who is IAT Photovoltaic Market in Italy Why we are contacting you Why you need us Summary Index.
RIAAN VISSER GFIMFO Manager: Consulting Services SizweNtsalubaGobodo.
1 The role of Government in fostering competitiveness and growth Ken Warwick Deputy Chief Economic Adviser UK Department of Trade and Industry.
III Astana Economic Forum. Ensuring Sustainable Economic Growth of Countries in Post-Crisis Period July 1-2, 2010 JSC «Kazakhstan public-private partnership.
Renewable Energy Policies of Germany and China Masood Ahmed CRER, SZABIST December 24’ 2009.
Background The Department has adopted an IRP with 42% target of electricity generation from renewable energy sources 03 rd August 2011 the Department.
2008 Electricity Distribution Maintenance Summit Stream 3A: Funding, Investment and Financial issues 10 June 2008 Theo van Vuuren Divisional Executive.
The global energy landscape and its impact on Bangladesh Dr. Boris Gehring TÜV SÜD Slide 1 13/10/15‘Safe Future Now’ Summit on Power and Energy in Bangladesh.
AFRICAN MINERALS & ENERGY FORUM BEE Opportunities in the Electricity Industry Parliamentary Portfolio Committee: Minerals & Energy Prepared by: Cingembo.
The added value of the Wind Energy Roadmap Christian Nath – TPWind Executive Committee.
1 Experience from Finland Christian Llull, Ho Chi Minh City, 23rd November 2015 ? Cooperation & Partnership in Wind Project Development.
Presentation to Select Committee on Economic Development
Skills development in the Renewable Energy Sector in South Africa Johan van den Berg Chair: Steering Committee South African Renewable Energy Council 11.
Energy Sector of Turkey “General Overview and Policy Objectives” Sinem ÇAYNAK General Directorate for Energy Affairs IEA Turkey IDR Meeting December 8,
BIDDER’S CONFERENCE: Eskom Grid Connection Process and related matters Date: 16 August 2012.
Here Renewable Energy Independent Power Producer Programme Bidder’s Conference 16 August 2012 Andrew Etzinger Senior General Manager Eskom.
AEROTROPOLIS RAIL CLUSTER DEVELOPMENT AND INVESTMENT MAKING BEST USE OF FISCAL INCENTIVES 17/18 NOVEMBER 2015.
Understanding the Integrated Resource Plan (IRP 2010 Rev 2)
Nordic transport infrastructure market – modelling and forecasting methods for asset management and business development Markku Riihimäki, Pekka.
Renewable energy support schemes in the Republic of Moldova
SA GHG Emission Reduction System: Progress and development of 2nd Phase of the DEROs and Carbon Budgets PCEA 28 OCTOBER 2016.
South East Europe Regional Consultation Meeting Bucharest, Romania 6 – 7 October 2016 Session II: Opportunities and Challenges in RE Deployment in the.
Renewable Energy and SA GHG Emission Reduction System
Professor H. J Annegarn, Ms L Cape
REFLECTED IN JAMAICA’S ENERGY POLICY
Integrated Resource Plan 1
Portfolio Committee- Trade and Industry – 11 March 2015
Draft hypotheses & connecting points to
Mostafa El-Asiry Nuclear Power Plants Authority (NPPA), Cairo, Egypt
Progress on the Renewable Energy IPP Procurement Programme
Arizona Public Service Company 2012 Renewable Energy Standard Implementation Plan Arizona Corporation Commission Open Meeting August 17, 2011.
Rural Partnerships between Small Farmers and Private Sector
OUTLINE RE Programme Objectives Integrated Resource Plan
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Scaling up of Renewable Energy for Power Generation in the Western Balkan countries
Building a secure Home Affairs
Presentation transcript:

South African Wind Market Entry Study Presentation by David Williams, 24 June 2013

Contents Wind history, status and policies in SA Market Outlook SA Wind Value Chain 5. Stakeholders in South African RE market 6. General information for new entrants 7. Opportunities in SA wind sector 4. SWOT analysis of the SA wind sector

Experts in renewable energy Onshore & Offshore Wind Wave & Tidal Solar PV & CSP

Local understanding forms a global perspective Almost 1000 staff, in 42 locations, across 24 countries Vancouver Ottawa Portland San Diego Montreal Peterborough Austin Querétaro Porto Alegre Santiago Bristol Cork Beijing Seoul Tokyo Shanghai Mumbai Bangalore Newcastle Melbourne Wellington Paris Izmir Cairo Copenhagen Hinnerup Oldenburg Hamburg Warsaw Lisbon Barcelona Zaragoza Madrid Imola London Slough Glasgow Cape Town Heerenveen Sint Maarten Kaiser-Wilhelm- Koog

Providing lifecycle support to all stakeholders Project Developers Owner/Operators Investors Manufacturers Governments/NGOs

Wind history, status and policies in SA

Wind power in South Africa SA wind market is a new market by global standards Brief History of utility-scale wind : 2002: Klipheuwel 3.2MW wind farm, Eskoms first (experimental) wind farm, Western Cape. Darling Wind Farm (5.2MW but ongoing capacity additions), near Cape Town, first attempt by SA to create an wind energy programme (SAWEP) First private development: Coega Wind Farm, single turbine near Port Elizabeth, (just in time for the 2010 World Cup) Eskoms Sere Wind Farm (100MW), under development (end 2013) In general though, the country has seen low levels of activity, until recently.

Renewable Energy (RE) Policy in South Africa (1) 1998 White Paper: first tentative steps promoting diversification of supply and Independent Power Producers (IPPs); 2003 White Paper on RE: 10,000 GWh by 2013… 2008 Energy Act: further support to RE in the SA energy mix (through the Integrated Energy Plan). This is turn has led to the Integrated Resource Plan (IRP) which outlines the national electricity plan. IRP is 20-year outlook plan, revised every 2-3 years Current: IRP (new update imminent). IRP went through several rounds of consultation finally arriving at:

Renewable Energy (RE) Policy in South Africa (2) Policy Adjusted IRP 33% of new capacity allocation go to RE 9,200 MW of wind by 2030 All renewables, capacity growth (annual installations) from DoE figures All renewables, capacity growth (cumulative) from DoE figures

Renewable Energy (RE) Policy in South Africa (3) Main outcome for RE: Renewable Energy IPP (Procurement) Programme (REIPPP) SA Govt. committed to 3,725 MW of RE by ,850 MW of wind Recent announcement adds another 1,470 MW by 2020 In total equates to appr. 1,300 mid-sized (2.5MW) turbines to be installed General explanation of the REIPPP process: Capacity allocated over (up to) 5 Rounds of competitive bidding. SA Department of Energy has set maximum tariff and developers bid in below this. 2 stage process of evaluation against a variety of criteria So far 2 Rounds have been completed, 3 rd Round about to commence

REIPPP progress to date (1) Round 1 wind projects Round 2 wind projects Projects in range 25MW -135MW. Small projects require similar effort and incur the same risks as larger projects, with less return. Upper limit of 140MW was set to limit congestion for grid connections DoE restricted capacity allocations to ensure some capacity for future bid rounds. REIPPP RoundCapacity Round MW Round MW Round MW available Rounds so far…

REIPPP progress to date (2) Small-scale wind (grid connected) REIPPP focuses on large scale project (have to be >1MW for REIPPP) No provision at all for installations below that size (i.e. kW scale projects) Govt. has set up a Small Projects REIPPPP: Original plan is for 100 MW (for all technologies) to be available over 4 Rounds, allocated to projects in 1MW - 5MW range Programme dates to be announced soon

Wind in other applications (1) Self-Generation on-site and wheeling for industrial applications: SA economy based on mining and heavy industry Big electricity users Almost all electricity currently supplied by ESKOM – end-users subject to price fluctuations and power outages Until recently none considered their own renewable energy plant (wind power not economically competitive with the subsidised electricity from the national grid). This attitude could change in the future (example 1MW hybrid PV-Diesel plant for mine in Limpopo) Winds contribution to this trend is however debatable… –Wind resource doesnt easily match up to demand –Firm generation wind power will be combined with conventional generation or with a electricity storage facility. Source: infomine.com

Wind in other applications (2) Wheeling An electricity user establishes an electricity production installation far from the site of electricity consumption but uses the national grid to transport the electricity from the production site to the location of end-use. Lack of legislation, regulations and technical expertise within industry and government Wind power could theoretically cover a proportion of the electricity needs For the foreseeable future however, wind power, in these applications, will remain a niche market Conclusion Other off-grid potential Household electrification in SA at approximately 75%, so potential is there Govt. focus on extending national gird not promoting off-grid solutions.

SA wind market outlook

Recap of SA Govt. targets Milestone Renewables Capacity [MW] 3,7256,925*17,800 Wind Installed Capacity [MW] 1,8503,320*9,200 Percentage of total capacity 50%48%52% Creation of three scenarios: Central case: based on the DoEs Integrated Resource Plan (IRP) High case: short term build rates are limited but then assumes an aggressive but plausible development to robust industry Low case: projects under the REIPPPP proceed more slowly; it is assumed there is minimum annual capacity addition GL GH forecast scenarios

SA wind market outlook GL GH forecasts REIPPP wind capacity growth (Annual installations) REIPPP wind capacity growth (Cumulative) Wind power annual installations rates could be anywhere between 350MW and 800MW Average financial volume, to 2020, of appr. EUR 564 million per year Conclusion

Other potential SA wind markets REIPPP Small wind project (1MW-5MW) market 100MW over 4 Rounds Details of timings still to be announced Overall though, unambitious target, but too little detail to accurately forecast Assuming half of each round allocation is for wind power (as per large REIPPP) Financial volume predicted at appr. EUR 25 millions per Round Offshore wind South Africa has offshore wind potential, off Eastern and Western Capes Due to relative costs, onshore wind would have to be saturated before offshore becomes a viable approach No developments in the foreseeable future

South African value chain

SA value chain chain of activities that one or more firms perform to be able to deliver a product or service in a specific industry Industry Government Financing Bodies DevelopmentConstructionO&M Decommission Project Owner / Developer General Value chain

SA value chain (2) Project Development Covers such activities as: Site screening, selection and land lease; Wind resource assessment and site studies; Turbine selection and project design; Electrical connection feasibility and off-taker arrangements; Obtaining necessary permits including environmental assessments; and Project management. The natural habitat of the consultant: Engineering: energy production assessments, BoP design and grid connection studies; Environment: EIAs and other impacts; Financial: financial planning, fund raising Legal: all contractual interfaces and interactions with major stakeholders (e.g. land owners);

SA value chain (3) Project Construction Two major inputs to this stage: Wind turbine OEMs : International players: most major established players already in the market South African players: small scale producers exist, but dont have any major share; Balance of Plant providers: Civil/Mechanical works contractors: usually local companies Electrical suppliers/contractors: local; components imported Project Operations and Maintenance Wind Turbine Suppliers: warranty terms 2-5 years (some 10 years or longer in the South Africa market); Owner In-House O&M Independent O&M

Stakeholders in South African RE market

Research /Academia Universities (University of Pretoria, University of Stellenbosch, University of Cape Town etc.) Research Institutes and Standards (CSIR, SABS etc) Government of South Africa Dept. of Labour Dept. of Trade and Innovation Dept. of Science and Technology Dept. of Economic Development National Treasury Dept. of Environmental Affairs Dept. of Public Enterprises Dept. of Energy Dept. of Planning ESKOM NERSA IPP Government Research & Planning (e.g. SANEDI) Financial Institutions Development Banks (e.g. DBSA, IDC) Private Banks (e.g. Standard Bank, Nedbank, ABSA, Rand Mutual Bank, Investec etc.) REIPPP Contractors Consultants (e.g. engineering, legal, environmental etc.) Construction subcontractors (e.g. EPC ) OEMs (e.g. wind turbines, elec. Components) Contractors Consultants (e.g. engineering, legal, environmental etc.) Construction subcontractors (e.g. EPC ) OEMs (e.g. wind turbines, elec. Components) B-BBEE entities NGOs/Associations Industry Associations (e.g. SAREC, SANEA, SAAEA etc.) Chambers of Commerce NGOs & Civil Society (e.g. Friends of the Earth, Greenpeace, WWF etc.)

SWOT analysis of the SA wind sector

SWOT analysis Helpful Harmful Internal External Strengths Weaknesses Opportunities Threats Wind resource Public awareness and support Community involvement Industrial base Business climate and infrastructure Economic Climate Still maturing Industry Level of skills in country Climate and terrain Policy environment Change of focus (to fossil/ nuclear power) Existing infrastructure in remote locations Permitting and licensing Supply chain developments through partnerships Manufacturing base Market leadership potential Wind development services Wind integration opportunities Wind O&M market Small wind (REIPPP and outside it) Established players (international) Local companies (up-and-coming) Local Content B-BBEE certification Grid transmission capacity Planning procedures Other energy sources (both RE and fossil) Currency instability The boxes below present a summary of the SWOT analysis, with respect to the SA wind market, from a Dutch company perspective.

General information for new entrants

General Information (1) REIPPP process All major issues covered by RfP documentation (Rand 15,000 download fee) Open to all companies (local and international) If bidding directly with projects (i.e. as developer) requires the creation of an SPV All parties (incl. subcontractors) need to divulge detailed company and contract information. 2 stage process (Qualification and Evaluation): Submitted bids assessed against compliance with the Qualification Criteria, Price and Economic Development objectives Compliant bids assessed against a set of Evaluation criteria relating to Price and Economic Development aspects, and are ranked, per Technology, on a comparative basis. Relative scoring: price (70%) and economic development (30%). Once awarded Preferred bidder status, Eskom offers standard PPA

General Information (2) REIPPP process Some further points on qualification: Statement of complete familiarity with relevant SA laws required Particularly for companies outside of South Africa, a declaration stating that suitable South African legal counsel has been employed SPV must provide guarantee equal to R100,000 per MW of project (to qualify) Once awarded, new guarantee of R200,000 per MW (first guarantee returned) Development Fee equal to 1% of the total project costs once certain agreements have been signed. Evaluation: Emphasis placed on the social and economic development aspects, in line with Government strategy.

General Information (3) REIPPP process Each factor has a threshold and target value. Threshold and target values increase with each successive bid round. Economic Development ElementsWeighting Job Creation 25% Local Content 25% Ownership 15% Management Control 5% Preferential Procurement 10% Enterprise Development 5% Socio-Economic Development 15% Total Total points 100% 30 points Job creation : certain statistics required such as the percentage of South African nationals, Black citizens and people from local communities employed in the project company; breakdown for construction, operation and maintenance. Localisation : measured by capital costs, costs of services procured for the construction

General Information (4) Ownership : REIPPPP requires a Bidder to have a South African Entity Participation of 40% as well as setting certain thresholds on the actual level of (B-BBEE) certification of the partners. Bidders are required to indicate the percentage of equity owned by Black People, Black Enterprises and Local Communities, Socio Economic Development : Bidders required to identify needs of the communities surrounding the project site and formulate strategies to meet these needs by utilising Contributions from the projects revenue stream, i.e. setting up Community Trusts. REIPPP process

General Information (5) Broad-Based Black Economic Empowerment (B-BBEE) Act in 2003, (with an amendment in 2011) governs many of the working aspects of the South African economy. Codes of Good Practise (2007) developed to provide objective measurement of BEE achievements across all sectors. Require that all companies operating in South Africa make a contribution towards the aims of B-BBEE All state bodies and public companies consider the Codes when making decisions on issues such as procurement, licensing/concessions, partnerships and sale of state-owned assets Provisions for foreign companies to make contributions to the B-BBBE requirements in lieu of a direct sale of an equity stake of their company. Broad-based Black Economic Empowerment (B-BBEE) As foreign companies will most likely be expected to contribute towards the B-BBEE goals, a thorough understanding of the relevant regulations is an important aspect of any business plan.

General Information (6) International/Development Banks: Nederlandse Financierings-Maatschappij voor Ontwikkelingslanden N.V. (FMO) Access to Energy Fund Infrastructure Development Fund Fund Emerging Markets (FMO – Fonds Opkomende Markten) Other funds available from Development Bank South Africa (DBSA) and International Development Corporation (IDC) but not directly accessible by Dutch enterprises. Available Funds (examples) Private Banks: South Africas Big Four have all been involved in RE:, Nedbank, Standard Bank, ABSA, and (less for wind) Rand Merchant Bank. Other notable: Investec. Usual financing options available: debt/equity, mezzanine etc.

General Information (7) South African Dti offers a variety of incentive schemes to promote business but: some are aimed specifically at South African businesses applicability to RE projects/businesses should also be confirmed Examples: Manufacturing Investment Programme (MIP) Capital Projects Feasibility Programme (CPFP) Critical Infrastructure Programme (CIP) Enterprise Investment Programme (EIP) Technology and Human Resources in Industry Programme (THRIP) Incentives (examples)

General Information (8) Wind market in South Africa still developing, so framework is fluid. However: Rules and regulations in general South Africa is a WTO signatory i.e. must align itself to international norms SABS (National standardisation authority), is modifying existing standards to match international ones (e.g. from SANS to IEC ) In general, all products sold in SA are expected to conform to international standards (quality, HS&E etc.), but there are a few cases of country-specific variations (e.g. grid-connected components).

Opportunities in the SA wind sector

Opportunities for Dutch companies (1) Partnering with local companies and creation of local facilities local manufacturers setting up partnership with foreign firms to produce components or whole machines under license alternatively, SA engineering firms seeking support and expertise from foreign companies (consultancy). Trend of local companies seeking external partners is also likely to increase as local content rules provide local players with added incentive to become involved. Government strongly backing this idea 5 main threads identified: Wind development/ consultancy New market so scope for additional players to enter the market. In particular, scope for provision of specialist consultancy services (given the particular environmental and social requirements in REIPPP)

Opportunities for Dutch companies (2) Skills training provision clear skills gap in the South African workforce creation and provision of a training schemes Provision of wind farm O&M In future, market for independent O&M (once the initial warranties on Rounds 1 and 2, expire) Development of indigenous skill-sets so might be advisable for foreign firms to consider finding or developing a local presence now Small scale wind This segment of the market is unlikely to appeal to the larger established players tendering for the large-scale REIPPPP Rounds, and should therefore provide a fertile ground for other players Again potential consulting/partnering opportunities (see first point)