OV-2 Template Operational Node Connectivity Description – step-by-step instructions and templates Click the mouse button to see the next slide. Use the.

Slides:



Advertisements
Similar presentations
Managing Your Organisation’s Portal Team Account Tutorial 7.
Advertisements

Chapter 7 Structuring System Process Requirements
[Insert Project Name] Detailed Design Review (DDR) [Insert Date of DDR] Centers for Medicare & Medicaid Services eXpedited Life Cycle (XLC)
Chapter 4.
SYSTEM ANALYSIS & DESIGN (DCT 2013)
Systems Analysis and Design 9th Edition
Blackboard 7 Student Tutorial Series How to Use the Task Feature.
E | W | E | W | NHS e-Referral Service Referring Roles Issued: 3 June.
Rational Rose Tutorial
Using the Diagram It Template Copy this presentation to your hard drive. There are two sets of templates: Slides #3 & 4 for a flow chart Slides #5 & 6.
Chapter 7 Structuring System Process Requirements
Microsoft Expression Web - Illustrated Unit B: Creating a Web Site.
Data and Process Modeling
® IBM Software Group © 2009 IBM Corporation Rational Publishing Engine RQM Multi Level Report Tutorial David Rennie, IBM Rational Services A/NZ
Click to add your Name and Class Delete this box & replace with a suitable picture File menu >Insert > Picture Tip : Want to change the design template?
PHASE 2: SYSTEMS ANALYSIS
*** CONFIDENTIAL *** © Toshiba Corporation 2008 Confidential Creating Report Templates.
1 Instruction Manual for the Arabtec mySupplier System | version 1.0.
Quick Start Guide: Report Distributions Learn How To: 1.Create a Report Distribution 2.Save and Modify Report Distributions.
Actors and Use Case Diagrams Month Day, Year. Agenda Training Plan Overview Review Detailing Requirements with Requisite Pro Concepts Setting Up XDE Integration.
COPYRIGHT © 2008 – APEX SOFTWARE LTD. ALL RIGHTS RESERVED Human Resources COPYRIGHT © 2008 – APEX SOFTWARE LTD. ALL RIGHTS RESERVED Browser Icons INTEGRATOR’S.
Directions/Notes to Students Use the template to identify the 5 W’s, including… key players, events, and possible impact on the cold war Add graphics to.
Electronic Patient Discharge Plan (ePDP) A Detailed How-To For Providers Last updated: 2/9/151.
The Office location (Where). The Detail Map The demographic models used in strategic planning is extended of the enterprise architecture as the requirements.
MSOffice Access Microsoft® Office 2010: Illustrated Introductory 1 Part 1 ® Database & Table.
XP New Perspectives on Microsoft Office Access 2003, Second Edition- Tutorial 8 1 Microsoft Office Access 2003 Tutorial 8 – Integrating Access with the.
Times Tables 1 x 1=. Times Tables 1 x 2= Times Tables 1 x 3=
Clemson OLLI Presentation Template Instructions Important: Before starting to use this template, print out the following nine instruction pages.
E | W | E | W | NHS e-Referral Service Referring Roles Issued: 27 th.
This submission will be used by Area of Distinction Juries and the Caudill Class Jury. The slides may also be paired with jury comments in the Convention.
Labcheck Next Generation Quick Start Guide Admin Basics.
Submission Requirements & Instructions
INTEGRATOR’S BROWSER FUNCTIONS Use The Function
MS PowerPoint.
P2P Module: Ariba P2P REQUISITION AND APPROVAL
AESA – Module 8: Using Dashboards and Data Monitors
How to assign a test Project Name: How to assign a test Description:
OV-1 Template High-level Operational Concept Graphic – step-by-step instructions and templates Click the mouse button to see the next slide. Use the browser.
Physical Data Model – step-by-step instructions and template
Regional Architecture Development for Intelligent Transportation
Administrator Training
CV-1: Vision The overall vision for transformational endeavors, which provides a strategic context for the capabilities described and a high-level scope.
Conducting the performance appraisal
INX Incontrol mobile v5 Incontrol mobile user guide
Microsoft Word 2003 Illustrated Complete
Conducting the performance appraisal
System Interface Description – step-by-step instructions and templates
Advanced Financial Accounting
Microsoft Office Access 2003
CIS 375 Bruce R. Maxim UM-Dearborn
Microsoft Office Access 2003
PowerPoint Notes.
SV-10c Template Systems Event/Trace Description – step-by-step instructions and template Click the mouse button to see the next slide. Use the browser.
RPM: Basic plan data entry process A step-by-step guide for Plan Leads
SV-2 Template Systems Communications Description – step-by-step instructions and templates Click the mouse button to see the next slide. Use the browser.
Activity Model – step-by-step instructions and templates
OV-6b Template Operational State Transition Description – step-by-step instructions and template Click the mouse button to see the next slide. Use the.
Operational Rules Model – step-by-step instructions and template
Logical Data Model – step-by-step instructions and template
Request Form You gain access to the Request Form from your intranet set-up by your IT dept. Or the internet via either our desktop launcher icon. Or a.
, editor October 8, 2011 DRAFT-D
Systems Architecture & Design Lecture 3 Architecture Frameworks
Principal Investigator ESTCP Selection Meeting
CIS 375 Bruce R. Maxim UM-Dearborn
Click Summary Value Button to Show Source of Integral or Time
<Your Team # > Your Team Name Here
OV-6c Template Operational Event/Trace Description – step-by-step instructions and template Click the mouse button to see the next slide. Use the browser.
Command Relationship Chart – step-by-step instructions and template
SV-10b Template Systems State Transition Description – step-by-step instructions and template Click the mouse button to see the next slide. Use the browser.
Principal Investigator ESTCP Selection Meeting
Presentation transcript:

OV-2 Template Operational Node Connectivity Description – step-by-step instructions and templates Click the mouse button to see the next slide. Use the browser Back button to return to the Tutorial.

Four Steps in developing your OV-2 Step 1 – Identify the Product’s Timescale Decide on the timescale this product is expected to represent (as-is, to-be, transitional) Multiple timescales are often needed for each product; a separate OV-2 should be produced for each timescale that is needed

Step 2 - Identify Operational Connectivity Diagram Components Identify and List Operational Nodes Determine and document the physical nodes and/or virtual nodes (based on operational roles) that exchange information Operational nodes can include: a role (such as COMAST), an organisation (such as DMO), or a facility (such as a Field Hospital) Identify and List the Activities performed by the Operational Nodes Determine and document the activities that each operational node performs

Step 2 - Identify Operational Connectivity Diagram Components, continued… Determine and document the need to transfer information among operational nodes. Such needs are described in terms of needlines Determine and document the content and characteristics of each needline Characteristics typically include performance attributes such as volume, throughput, frequency and media

Step 3 - Illustrate Operational Connectivity Diagram Graphically portray the operational nodes and elements as icons Connect the operational nodes and elements with arrows to depict the needlines or information flows among them Enter relevant and appropriate descriptive information on the needlines This should only be a summary with details in the OV-3

Templates Two example templates have been provided following this slide – please amend or add to as necessary When you have completed your OV-2, see the slides at the end for Step 4 – the update of your Integrated Dictionary (CV-2) based on the OV-2 symbols and icons

OV-2 Node Charlie Node Delta Node Alpha Node Golf Node Echo Node Bravo HQ AFLOAT Node Charlie Ops, Coord, Plans, Log, Pers, CIS Node Delta Ops, Coord, Plans, Log Node Alpha Ops, Coord, Plans, Log HQXYZ Ops, Coord, Plans, Log Node Golf Ops, Coord, Plans, Log Node Echo Ops, Coord, Plans, Log Ops, Coord, Plans, Log, Pers, CIS Ops, Coord, Plans, Log Node Bravo Ops, Coord, Plans, Log, Pers, CIS Node Foxtrot OV-2

Tactical HQAST OV-2 BDE Gp (Qty 4) Naval Task Gp LSF RFSU (Qty 3) DHC4 Special Forces Ops, coord Ops, Coord, MGI and weather Ops, Coord ECSS Ops, coord F-111 AP-3C RF-111 F/A-18 Coord Air Elms Ops, Coord, Plans Coord, Log, Pers Admin Ops, Coord, Plans, CIS, Log Ops, Coord, Plans, Log, Pers, CIS AO/AOR HQAST Ops, Coord, Int, Plans, Pers, Log, CIS SS FFG/ANZAC BDE Gp (Qty 4) FCPB Log Log Naval Task Gp Ops, Coord, Plans, Pers, Log, CIS LSF Ops, Coord, Int, Plans, CIS Ops, Int, Plans, CIS Coord To ECSS Ops, Int, Plans, Coord, CIS Bde Admin elms RFSU (Qty 3) Bde Fighting elms Coord Log CH-47 AVVN S-70 3 AAvn elm AAvn HQ Ops, Coord, Plans OV-2

Step 4 - Update your Integrated Dictionary When you have completed your OV-2, the following types of information should be entered into your Integrated Dictionary (CV-2) For each Operational Node: node name and description of the operational role played or mission performed; list of activities performed at the operational node For each Needline: needline identifier, description, and nodes connected; summary of information exchanges associated with the needline, including the critical attributes for those information exchanges and the minimum, mean, and maximum requirements for those critical attributes And finally … (see next slide)

Conclusion You can now delete the instruction slides from this presentation and save the remaining OV-2 graphics slides alone