Proposal – Supported Radio Resource Measurement Bitmask IE

Slides:



Advertisements
Similar presentations
Doc.: IEEE /2215r4 Submission August 2007 Ganesh Venkatesan, Intel CorporationSlide 1 Proposal –Radio Resource Measurement Capability Enabled.
Advertisements

Doc.: IEEE /2215r1 Submission July 2007 Ganesh Venkatesan, Intel CorporationSlide 1 Proposal – Supported Radio Resource Measurement Bitmask IE.
Beacon Measurement on Pilot Frames
LB84 General AdHoc Group Sept. Closing TGn Motions
[ Interim Meetings 2006] Date: Authors: July 2005
Resource Request/Response Discussion
Motions Date: Authors: January 2006
VTS SG Montréal Closing Report
IEEE White Space Radio Contribution Title
LB73 Noise and Location Categories
LB73 Noise and Location Categories
Waveform Generator Source Code
TGp Closing Report Date: Authors: July 2007 Month Year
Attendance and Documentation for the March 2007 Plenary
[ Policies and Procedure Summary]
Motion to accept Draft p 2.0
[place presentation subject title text here]
Descriptive Language Usage in TGv
Fast Transition Report
GPS Aided WLAN Network Finder
TGu-changes-from-d0-02-to-d0-03
TGp Closing Report Date: Authors: May 2007 Month Year
AP Location Capability
Best Path Selection Mechanism
CID 186, 206 and 211 resolution Date: Authors: January 2007
Reflector Tutorial Date: Authors: July 2006 Month Year
CID#102 - Channel Allocation for P2P
TGv Redline D0.07 Insert and Deletion
TGv Redline D0.06 Insert and Deletion
Proposal for Load Balancing
ADS Study Group Mid-week Report
IEEE P Wireless RANs Date:
Protection Assurance Method
TGu-changes-from-d0-01-to-d0-02
Number of Encoder as a function of MCS
LB73 Noise and Location Categories
Extended Channel Switch Announcements
Proposal for QAP Available Admission capacity
Proposal for QAP Available Admission capacity
IEEE White Space Radio Intended timeline
TGy draft 2.0 with changebars from draft 1.0
TGv Redline D1.04-D1.0 Insert and Deletion
TGv Redline D0.10 Insert and Deletion
Solution for 40MHz in 2.4 GHz band
QoS aware Load Balancing
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
Redline of draft P802.11w D2.2 Date: Authors:
TGp Closing Report Date: Authors: March 2007 Month Year
Simulation Results for Adaptive Rate Control
TGu-changes-from-d0-02-to-d0-03
[ Policies and Procedure Summary]
Beamforming and Link Adaptation Motions
Path Selection and Path Switch Mechanism
Draft P802.11s D1.03 WordConversion
CID 186, 206 and 211 resolution Date: Authors: January 2007
TGv Redline D0.13 Insert and Deletion
QoS Metrics Date: Authors: January 2005 Month Year
Motion to go to Letter Ballot
TGu-changes-from-d0-04-to-d0-05
Location Capability Negotiation
TGu-changes-from-d0-03-to-d0-04
Non-AP STA Location Capability
Reserve Option Contradiction
Simulation Results for Adaptive Rate Control
Extended Channel Switch Announcements
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
Proposal for Diagnostic Alerts
Greenfield protection mechanism
E911 Bits Date: Authors: May 2007 Month Year
Proposal for Load Balancing
Presentation transcript:

Proposal – Supported Radio Resource Measurement Bitmask IE Month Year November 2005 July 2007 Proposal – Supported Radio Resource Measurement Bitmask IE Authors: Date: 2007-07-17 Notice: This document has been prepared to assist IEEE 802.11. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.11. Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures <http:// ieee802.org/guides/bylaws/sb-bylaws.pdf>, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair stuart@ok-brit.com as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE 802.11 Working Group. If you have questions, contact the IEEE Patent Committee Administrator at <patcom@ieee.org>. Ganesh Venkatesan, Intel Corporation Emily Qi et al

Month Year November 2005 July 2007 Abstract This document is a submission for Supported Radio Resource Measurement Information Element. Corresponding normative text is in document 07/xxxxr0. This proposal addresses CID #12 (LB96#25-Palm):There are too many varied procedures here. It is unlikely that implementations will implement all of the procedures. Each of the supported procedures/reports should be seperately indicated and negotiated Ganesh Venkatesan, Intel Corporation Emily Qi et al

Rationale 802.11k is a collection of measurement tools July 2007 Rationale 802.11k is a collection of measurement tools Some measurements require additional resources and devices may choose not to implement them When a device advertises support for 802.11k (dot11RadioMeasurementEnabled is TRUE), it is not clear what RRM is supported and what is not supported A STA will have to send one or more measurement requests and analyze the received reports to comprehend what the measuring STA is capable of A simple method is to advertise supported measurements via a Supported RRM Bitmask IE Ganesh Venkatesan, Intel Corporation

Supported RRM Bitmask IE Month Year November 2005 July 2007 Supported RRM Bitmask IE Bits in the IE Indicate which of the RRMs are supported by the STA MIB attribute dot11RadioMeasurementEnabled = TRUE means Capability Information Field:12 is set that the STA is capable of receiving a RRM request and respond to it Is present in Probe Request, Probe Response, [Re]Association Request and [Re]Association Response if dot11RadioMeasurementEnabled is TRUE Adds 5 octets to the above frames Ganesh Venkatesan, Intel Corporation Emily Qi et al

Supported RRM Bitmask IE (Octet-1) July 2007 Supported RRM Bitmask IE (Octet-1) Bit Position Measurement Annex-A entry Link Measurement 2.3, 2.4 1 Neighbor Report 2.5, 2.6, 12 2 Parallel Measurements 3.1 3 Enable bit 3.2 4 Autonomous Reports 3.3 5 Duration Mandatory 3.4 6 Repeated Measurements 3.7 7 Measurement Pause 3.8 Ganesh Venkatesan, Intel Corporation

Supported RRM Bitmask IE (Octet-2) July 2007 Supported RRM Bitmask IE (Octet-2) Bit Position Measurement Annex-A entry 8 Beacon Measurement (passive) 4.2 9 4.3 10 4.4 11 Frame Measurement 5 12 Channel Load 6 13 Noise Histogram 7 14 Statistics 15 LCI Measurement Ganesh Venkatesan, Intel Corporation

Supported RRM Bitmask IE (Octet-3) July 2007 Supported RRM Bitmask IE (Octet-3) Bit Position Measurement Annex-A Entry 16 Transmit Stream/Category 10 17 AP Channel Report 11 18 RCPI Measurement 13 19 RCPI with Active Scanning 14 20 RSNI 15 21 Power Capability in [Re]Association Element 22 MIB 23 Measurement Pilot Ganesh Venkatesan, Intel Corporation

Supported RRM Bitmask IE (Octet-4) July 2007 Supported RRM Bitmask IE (Octet-4) Bit Position Name RRM (Annex-A) 24 Beacon, Probe Response has : 16.1 Country and TPC Information 25 Power Constraint Element 16.2 26 BSS Average Access Delay 20 27 Antenna Information 21 28 Measurement Pilot Tx Information 22 29 BSS Available Admission Capacity 30 BSS AC Access Delay 31 Quiet Interval 23 Ganesh Venkatesan, Intel Corporation

Supported RRM Bitmask IE (Octet-5) July 2007 Supported RRM Bitmask IE (Octet-5) Bit Position Measurement Notes 32 Support Measurements in non-operating channel 13-36 Maximum Measurement Duration Interpreted only if Bit-5 is zero. Value = 0 indicates that there are no limits on measurement duration. Duration in TUs. 37-39 Reserved Ganesh Venkatesan, Intel Corporation

Supported RRM Bitmask IE (format) Month Year November 2005 July 2007 Supported RRM Bitmask IE (format) Slide-5 Slide-6 Slide-7 Slide-8 Slide-9 Octet 1 2 3 4 5 Ganesh Venkatesan, Intel Corporation Emily Qi et al

Normative Text Changes July 2007 Normative Text Changes Minimal change to the amendment: Define Radio Resource Measurement Capability IE Add the IE to Probe Request, Probe Response, Association Request and Reassociation Request frames Fix Clause 11.10.5 to describe the semantics of the bits in the Capability IE: bit set implies that the station will never respond (for the duration of the current association) to the request with a report indicating that it is ‘incapable’ of performing the measurement. A STA receiving a measurement request that it advertises to support in the Capability IE can always respond with a report indicating that it is ‘refusing’ to perform the measurement. Fix Annex-A Ganesh Venkatesan, Intel Corporation

July 2007 Feedback? Ganesh Venkatesan, Intel Corporation