LHCb VErtex LOcator For precision measurements of CP-violation at CERN (GENEVE) HALF of DETECTOR Si strip detector Read-out electronics Secondary vacuum.

Slides:



Advertisements
Similar presentations
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Advertisements

CO2 cooling for FPCCD Vertex Detector Yasuhiro Sugimoto KEK 1.
HEP Experiments Detectors and their Technologies Sascha Marc Schmeling CERN.
MICRO VERTEX DETECTOR ZEUS experiment at DESY (HAMBURG) PROJECT SPECIFICATIONS : Design and production of a silicon Micro Vertex Detector (MVD) for the.
LHC SPS PS. 46 m 22 m A Toroidal LHC ApparatuS - ATLAS As large as the CERN main bulding.
EPFL, Design and first Prototype for a B eam P ipe D istance M onitoring Safety Switch.
LHC Experiments at Liverpool E2V Visit – Nov 2005 Introduction Si Technology Upgrade/Maintenance Summary.
The LHCb Inner Tracker Marc-Olivier Bettler SPS annual meeting Zürich 21 February 2007.
Abraham Gallas (USC-IGFAE) Strips and Pixels for the VELO upgrade.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Abstract We constructed and tested seven scintillation counters using photomultiplier tubes, in order to create a fast electronic coincidence “trigger”
ZEUS Calorimeter (1) At HERA high energetic electrons (e) collide with high energetic protons (P). The ZEUS detector measures the properties of the particles.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
Measurement of CP violation with the LHCb experiment at CERN
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
Jeroen van Hunen The LHCb Tracking System. May 22, 2006 Frontier Detectors for Frontier Physics, Elba, Jeroen van Huenen 2 The LHCb Experiment LHCb.
Nikhef Annual Meeting 13 Dec 2001 Future Vertexing Els Koffeman for Nikhef Vertex Group.
EDR - Mech. 2; December 16/17, 2002 Hans de Vries - 1 Status of Vertex at NIKHEF VELO Mechanics  RF/vacuum foil  Rectangular bellow  RF measurements.
Martin van Beuzekom, STD6 14 th September Outline: Introduction to LHCb and VErtex LOcator (VELO) Status of VELO Beamtests Upgrades Summary LHCb.
November 29, 2002 NIKHEF-1 Hans de Vries Status RF foil RF/vacuum foil  Purpose  Production methods used  Deformations: static - overpressure  Electrical.
Low mass carbon based support structures for the HL-LHC ATLAS pixel forward disks R. Bates* a, C. Buttar a, I. Bonad a, F. McEwan a, L. Cunningham a, S.
INTEGRATION OF THE CBM SILICON TRACKING SYSTEM U. Frankenfeld for the CBM collaboration supported by BMBF, EU-FP7 HadronPhysics3 and CRISP.
The BTeV Project at Fermilab Talk to DOE/Fermi Group Jan. 11, 2001 Introduction – Joel Butler Tracking detectors – David Christian Particle Identification.
Semiconductor detectors An introduction to semiconductor detector physics as applied to particle physics.
At the HERA collider in Hamburg an experiment (ZEUS) has been built to study electron-proton collisions. For the near future an upgrade of this experiment.
Difference between Roman Pots and VELO Very forward tracking is typically done using detectors located in Roman pots. They are far away from the interaction.
CBM Silicon Tracking System. Microstrip Detector Module Assembly and Test V.M. Pugatch Kiev Institute for Nuclear Research GSI (CBM experiment), Darmstadt.
11/4/2005OLAV 1 Workshop CERNW. Maan Fast Vacuum Valves at CERN -Introduction to fast valves -History of fast valves in use/used at CERN -LEP fast shutters.
26 June 2006Imaging2006, Stockholm, Niels Tuning 1/18 Tracking with the LHCb Spectrometer Detector Performance and Track Reconstruction Niels Tuning (Outer.
LHCb Vertex Detector and Beetle Chip
Vrije Universiteit amsterdam Milan, September 25, 2000 VELO System J.F.J. van den Brand LHCb Vertex Detector System: Status Report J.F.J. van den Brand.
CP violation in B decays: prospects for LHCb Werner Ruckstuhl, NIKHEF, 3 July 1998.
METAL DETECTORS: PERFORMANCES AND APPLICATIONS Oleksandr Okhrimenko Institute for Nuclear Research NAS of Ukraine, Kiev.
M. Garcia-Sciveres July 2002 ATLAS A Proton Collider Detector M. Garcia-Sciveres Lawrence Berkeley National Laboratory.
The LHCb Vertex Locator Lars Eklund LHCb VELO Group of the LHCb Collaboration CERN (Geneva), EPFL (Lausanne), NIKHEF (Amsterdam), University of Glasgow,
CO 2 Controlling a 2-phase CO2 loop using a 2-phase accumulator
LHCb Vertex Locator (VELO) Lars Eklund École Polytechnique Fédérale de Lausanne Liverpool University Vrije Universiteit Amsterdam.
MICRO-STRIP METAL DETECTOR FOR BEAM DIAGNOSTICS PRINCIPLE OF OPERATION Passing through metal strips a beam of charged particles or synchrotron radiation.
1/20 LHCb upgrade, Jeroen van Tilburg Nikhef Jamboree, 14 Dec 2015 Preparing for the LHCb upgrade.
Performance of the LHCb Vertex Locator Thomas Latham (on behalf of the LHCb VELO group) 11/06/20111TIPP Chicago.
VELO Replacement Girish Patel University of Liverpool.
Aras Papadelis. NIKHEF 1 Aras Papadelis B-physics meeting 15/ Results from the Nov2004 VELO test beam (and what followed…)
IoP Masterclass The Physics of Flavour at the Large Hadron Collider Tim Gershon University of Warwick March 30 th 2011.
12 th LECC, Valencia Sep 2006Aldo F. Saavedra 1 The Vertex Detector of LHCb - VeLo Aldo F. Saavedra Glasgow University On behalf of the VeLo group.
Pixel 3D Sensor Test Beam Analysis
The workflow of module assembly for the CBM Silicon Tracking System
Developing Radiation Hard Silicon for the Vertex Locator
Detector building Notes of our discussion
Tracking detectors/2 F.Riggi.
CERN PH-DT Physics Department (PH) Detector Technologies (DT)
Micro-channel Cooling
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
Simulated vertex precision
FP420 Detector Cooling Thermal Considerations
Hadron Physics Lecture Week
5% The CMS all silicon tracker simulation
UNIZH and EPFL at LHCb.
LHCb VErtex LOcator For precision measurements of CP-violation at CERN (GENEVE) HALF of DETECTOR Si strip detector Read-out electronics Secondary vacuum.
Pradeep Ghosh for the CBM Collaboration Goethe-Universität, Frankfurt
LHCb VErtex LOcator ENGINEERING DEPARTMENT
Production and test of Si sensors for W-Si sandwich calorimeter
Niels Tuning (Outer Tracker Group LHCb)
The LHCb vertex detector
CMS Masterclass 2017.
ACCELERATORS AND DETECTORS
The LHCb VErtex LOcator
PERFORMANCE OF THE METAL RADIATION MONITORING SYSTEMS
CO 2 CO2 COOLING FOR THE LHCB-VELO EXPERIMENT AT CERN Bart Verlaat
First results from the LHCb Vertex Locator
Presentation transcript:

LHCb VErtex LOcator For precision measurements of CP-violation at CERN (GENEVE) HALF of DETECTOR Si strip detector Read-out electronics Secondary vacuum container Vacuum vessel Exit foil Vacuum pump Prototype foil of the Secondary vacuum container SILICON MODULE            SILICON SENSOR PROJECT DESCRIPTION: Design and production of the Silicon VErtex LOcator for the LHCb experiment at CERN. During collisions of the two proton beams in the 'Large Hadron Collider' (LHC) B-mesons will be produced. The decay of these B-mesons is not invariant under Charge and Parity reversal: they show CP-violation. The B-mesons travel about 7 mm before decaying into other particles. The micro vertex has been designed to perform an accurate measurement of the decay position (vertex) of these B-mesons. The VErtex LOcator consists of a row of silicon detectors, each 0.3 mm thick. Charged particles that traverse the silicon generate an electrical charge which can be measured. The silicon sensors are positioned perpendicular to the proton beam at a radial distance of 8 mm from the beam. In order to be very close to the proton proton interaction and have a minimal amount of material in front, the sensors have to be placed in a secondary vacuum box During the filling and ramping of the LHC ring the detectors have to be moved out by 30 mm in order to prevent radiation damage. For the actual measurements they have to be moved in again with a position accuracy of better than 0.05 mm. The whole VErtex LOcator is placed inside the vacuum system. The detectors and the read-out electronics are constructed from radiation hard components. The heat produced by the electronics is taken care of by a cooling system that uses CO2 as refrigerant. The signals from the detector are transported outside the vacuum system for analysis through 22,000 signal cables. PROJECT GROUPS : Glasgow University (UK), Liverpool University (UK), NIKHEF (Netherlands), CERN, Lausanne University (Switzerland), ASIC lab. University Heidelberg (Germany) VErtex LOcator LHC-b detector VErtex LOcator