Peco Facet Sewage Water Treatment Plant

Slides:



Advertisements
Similar presentations
SPRINGETTSBURY TOWNSHIP.
Advertisements

What We Are Providing ?.
Advanced Wastewater Treatment Plants.
Slide 1 Insert your own content. Slide 2 Insert your own content.
REQ Drop from Demand Response Programs Process Flow Retail Customer Demand Response Service Provider (DRSP) Distribution Company 1 Drop Request.
Combining Like Terms. Only combine terms that are exactly the same!! Whats the same mean? –If numbers have a variable, then you can combine only ones.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
0 - 0.
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Teacher Name Class / Subject Date A:B: Write an answer here #1 Write your question Here C:D: Write an answer here.
Addition Facts
ZMQS ZMQS
Antti Piirto The first EPR under Construction in Finland International Nuclear Forum 2008 ”Bulgarian Nuclear Energy – National, Regional and.
1 WATER AUTHORITY Dr. Or Goldfarb CENTRAL BUREAU of STATISTICS Zaur Ibragimov Water Accounts in Israel Vienna January 2009.
Summer Projects 2010 Town of Beech Mountain Utilities Department (Click to Advance Slides)
Richmond House, Liverpool (1) 26 th January 2004.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
Urban Water Management Towards water sensitive urban settlements – integrating design, planning and management of South Africas towns and cities K. Winter,
Australian water filter.
Understanding Wastewater & Sewers
Peco Facet Sewage Water Treatment Plant
Power Plant Construction and QA/QC Section 2.3– Steam Generators
Confined spaces What all agricultural workers need to know.
Drilling Fluid Processing Equipment and Design
AEC advanced environmental control aps
1 an online tool for GSM networks Planning and Inventory and others… IMK Consulting Simple tools for complex needs IMK – your IT tailor.
Discharge & Wash Water Recycling
1 UPCOMING OPPORTUNITIES – Contractors Caissons Contractor(s) to perform installation of caissons to include purchase of all required materials. u Low/High.
VOORBLAD.
5.9 + = 10 a)3.6 b)4.1 c)5.3 Question 1: Good Answer!! Well Done!! = 10 Question 1:
1.  Private sector involvement is important  There are three major forms of participation: ◦ Type A: Government procurements (GP) ◦ Type B: Private.
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
Welcome to Shawnee #2 Wastewater Treatment Plant.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
25 seconds left…...
1 Important Changes to the Victorian Electricity Industry for Electrical Infrastructure Civil Works 1 July 2009.
Test B, 100 Subtraction Facts
Benefits of an As-Needed Construction Management Services Contract CMAA NATIONAL CONFERENCE October 2009 Copyright © 2009 by R. W. Beck, Inc. All Rights.
Week 1.
We will resume in: 25 Minutes.
Design Review Planning to date Project scope summary
1 Ke – Kitchen Elements Newport Ave. – Lot 13 Bethesda, MD.
1 Unit 1 Kinematics Chapter 1 Day
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 2008 EDUCATE  ENGAGE  EMPOWER 1.
Managing a Successful Mechanical System project Following design – what next?
 Waste Water Treatment Fax:
This project is co-funded by the European Union, the Russian Federation and the Republic of Finland Activity 4. Utilities network analysis (KRIMEL, KAEEC,
 UAB Vilniaus waters - the largest water company in Lithuania, which operates not only in the city of Vilnius, but also the district, Svencionys and.
Wastewater Treatment. Collection Sewers Collect wastewater and bring it to the wastewater treatment plant – Combined sewer overflows: Take untreated sewage.
1 II. Sewer Networks and Facilities Topic. II. 12. Detention (Retention) Basins: Kinds and Structures. Sewerage Pumping Stations Detention Basins: Kinds.
Chapter 11 Wastewater Treatment. On-Site Disposal Systems Septic Tanks Pit Toilets.
Unit 8: Waste Management Section 2: Wastewater Treatment.
Sewage Treatment Plant ELIL ABODE. STP Figure A3A1 A2 S1 S2 SF F1 F2 CF.
ТОО « Астана Тепло Инжиниринг» The company “Astana Teplo Engineering” formed in April Promoter and Director Bayalinov Asylbek.
Designer/Contractor JV- Apron Services Projects- A Winning Case
Introduction to Environmental Engineering Dr. Kagan ERYURUK
2011 WCW Conference. Fort McMurray James Sacker, Director Environmental Hugh Crawford, Wastewater Supervisor Plant Operations staff Alberta Environment.
Muttathara Sewage Treatment Plant - Blue Drops. Features of the plant The only one in the whole of Kerala Started in 2012 Capacity of 107 MLD (million.
Integrated Water Project for the town of Sliven
ChE 473K Plant Design R. Bruce Eldridge.
YASH ENVIRO TECHNOLOGIES
Sewage Treatment.
நீரே உயிர் நாம் செய்யும் அல்லது தினமும் பயன்படுத்தும் ஒவ்வொன்றிலும் நிச்சயமாக நீரின் பங்கு இருக்கும். இருப்பினும், நாம் அதற்குக் தகுந்த முக்கியத்துவம்
Full Service Plumbing Columbus, Ohio. plumbing The art and science of creating and maintaining sanitary conditions in a building used by humans. It is.
Presentation transcript:

Peco Facet Sewage Water Treatment Plant

Peco Facet Sewage Water Treatment Plant Project Information Project: ……………………………………………………...Imisli Olympic Sport Complex Contractor: …………………………………………………………………...“AZIMPORT” LLC Subcontractor for Sewage Water Treatment: …………..Facet Germany GmbH Date of order: ………………………………………………………………………….April 2011 Facet model: …………………………………………………………………………..STP-16HB Max. design flow rate: …………………………………………………………….40 m³/day Equivalent inhabitants: ……………. 160 persons (Directive: CE 91/271/CEE) Commissioning date: …………………………………………………………….24.12.2011

Peco Facet Sewage Water Treatment Plant Imisli town Republic of Azerbaijan 300 kilometers from capital Baku

Olympic Sport Complex Imisli, Republic of Azerbaijan Peco Facet Sewage Water Treatment Plant Olympic Sport Complex Imisli, Republic of Azerbaijan Facet STP unit Panorama view

Peco Facet Sewage Water Treatment Plant Waste Waters formed in toilets, showers and/or kitchen flows to the Sewage Water Treatment Plant installed by Facet Facet STP unit

Sewage Water Treatment Plant STP16HB Peco Facet Sewage Water Treatment Plant Sewage Water Treatment Plant STP16HB Facet scope: Design, Engineering, Supply of Equipment, Supervision of Installation and Start-up All civil works and sewer network system was made by AZIMPORT LLC (local construction company) – www.azimport.az

Construction period – July 2011 Peco Facet Sewage Water Treatment Plant Construction period – July 2011 Sport Complex back view Facet checks all constructions Aeration Chamber Control room Pumper well Azimport LLC - Local Civil company has built Pumper well, Inlet pit, Aeration Chamber and House for the Control Room According to drawings provided by Facet

Installation period – October 2011 Peco Facet Sewage Water Treatment Plant Installation period – October 2011 Installation of Settling and Disinfection Chamber by Crane Installation works has been carried out by AZIMPORT LLC under supervision of Facet specialists

Installation period – October 2011 Peco Facet Sewage Water Treatment Plant Installation period – October 2011 Installation of Settling and Disinfection Chamber by Crane

Installation period – October 2011 Peco Facet Sewage Water Treatment Plant Installation period – October 2011 Installation of the skid to Control Room (PLC, Blower, Recirculation Pump, Ozone Generator)

Installation period – October 2011 Peco Facet Sewage Water Treatment Plant Installation period – October 2011 Grinding Pumps (main and stand-by) and Screen Bar into the Pumper Well

Installation period – October 2011 Peco Facet Sewage Water Treatment Plant Installation period – October 2011 Piping works, Aeration Diffusers, Outlet Pipe

Installation period – October 2011 Peco Facet Sewage Water Treatment Plant Installation period – October 2011 Installation of Bio-Film Media into the Aeration Chamber General Piping Works

Start Up and Commissioning – December 2011 Peco Facet Sewage Water Treatment Plant Start Up and Commissioning – December 2011 Facet specialists has carried out the operation training course to the staff of Final Customer (Administration of Sport Complex)

Peco Facet Sewage Water Treatment Plant General Plan

Peco Facet Sewage Water Treatment Plant Effluent Conditions Ph……………………………………………………6-8 BOD5 ……………………………………………..<25 mg/l COD …..……………………………………………<125 mg/l TSS …………………………………………………<35 mg/l O2 dissolved (aeration chamber) ……..6-10 mg/l Temperature ………………………………….. Ambient Aspect ………………………………………..…. Odorless and Transparent

Peco Facet Sewage Water Treatment Plant Opening Ceremony of the Imisli Olympic Sport Complex with participation of his Excellency the President of the Republic of Azerbaijan Mr. Ilham Aliyev

Peco Facet Sewage Water Treatment Plant Opening Ceremony - 2011

Peco Facet Sewage Water Treatment Plant Opening Ceremony - 2011

Thank you for attention Peco Facet Sewage Water Treatment Plant Thank you for attention