1 Integrated Water Project for the town of Sliven
ISPA Measure 2005 BG 16 P PE 001 Integrated Water Project for the town of Sliven 1.Reconstruction of WWTP Sliven (FIDIC Yellow Book) 2.Construction/Reconstruction of Water Supply and Sewerage Network of Sliven (stage 1); LOT 1:Construction/Reconstruction of Sewerage Network

2 Works Contract 1 Reconstruction of WWTP Sliven (FIDIC Yellow Book)
Commencement Date: March 24, 2009 Taking Over Certificate: July 21, 2011 DNP started on: July 21, 2011 Performance Certificate: October 18, 2012 Physical Execution: 100 % Financial Execution: 83 %

3 WWTP Sliven before reconstruction

4 Reconstruction of WWTP Sliven
Inlet chamber Entrance and control building

5 Reconstruction of WWTP Sliven
Screening building

6 Reconstruction of WWTP Sliven
Grid tank Blowers

7 Reconstruction of WWTP Sliven

8 Reconstruction of WWTP Sliven
Primary Settlement Tank PS for primary sludge - reconstruction

9 Reconstruction of WWTP Sliven
Aeration Tank

10 Reconstruction of WWTP Sliven
Distribution Chamber of SST Secondary Settlement Tank

11 Reconstruction of WWTP Sliven
Service Building at Heated Digesters

12 Reconstruction of WWTP Sliven
Facilities for Sludge treatment and utilization of biogas

13 Reconstruction of WWTP Sliven
SCADA MCC

14 Reconstruction of WWTP Sliven
Gasholder Torch

15 Reconstruction of WWTP Sliven
Commemorative table

16 Supervision Contracts
Reconstruction of WWTP Sliven Contract № 1 Commencement Date: March 23, 2009 Completion Date: April 23, 2012 Financial Execution: 100 % Contract № 2 – funded by national budget Completion Date: December, 2012

17 Construction/Reconstruction of Sewerage Network – LOT1
The final assessment for the result achieved in LOT 1 is about 23 % (excluding recovering of the roads). Sliven Municipality has submitted in MoEW documentation to apply for financing under the OP Environment. The new project includes the activities of LOT1 that were not completed by ISPA.

18 Compliance with Article 8 of the Financing Memorandum
All conditions under Article 8 of the FM related to payments are considered fulfilled.

19 Final Report was presented to the European Commission
ISPA Measure 2005 BG 16 P PE 001 Integrated Water Project for the town of Sliven Final Report was presented to the European Commission