Gantt Chart.

Slides:



Advertisements
Similar presentations
Gantt Chart.
Advertisements

Activity Produce a project plan – George Bailey has bought a plot of land on which he wants to build a house. The house will be two storeys high and will.
Assignment 3 Unit 21Kyle Barrass Presentation of a Construction Project.
CONSTRUCTION SCHEDULING. steps to effective time management Examine the Contract List Major Contractual Obligations Divide Project into Major Work Areas.
Planning & Scheduling Systems: From Design to Fabrication.
Project Management UO Lab 477 February What is a Project? Clear beginning and end Requires a budget Requires significant time Requires resources.
ASSIGNMENT 1 Model Answers. Question 1 Q1) Consider building a garden shed project, which involves designing the shed, figuring out what materials are.
Project Management 30 January. Odds and ends Tournament on the webweb In the newsnews.
Business Studies Grade 11.
What is Project Management?
Quality Function Deployment Quality Function Deployment QFD Vivian Cherie KJ.
BAR CHART Develop by Henry Gantt. Definitions Activity
BAR CHART Paweł Bilski Piotr Mazur Paulina Wawryca.
Chart Basics Paul Morris CIS144. Gantt Charts Gantt charts are essentially bar graphs that help plan and monitor project development, resource allocation,
Gantt Charts and PERT Charts. Copyright © 2009 South- Western/Cengage Learning. All rights reserved. 14–2 Managing Operations Systems Planning Sheet –
Steel Building Apartment- Design and Build Sutton Yanosky ET494 – Dr. Cris Koutsougeras Advisor –Mr. Rode.
Gantt and PERT charts. Representing and Scheduling Project Plans Gantt Charts Useful for depicting simple projects or parts of large projects Show start.
Gantt Charts & Flowcharts Paul Morris CIS144. Gantt Charts.
CS 160: Software Engineering October 20 Class Meeting Department of Computer Science San Jose State University Fall 2014 Instructor: Ron Mak
GANTT Charts. What is a GANTT chart? A Gantt chart is a type of bar chart that illustrates a project schedule. Gantt charts illustrate the start and finish.
Steel Bar Joists Tyler Wells. Academy Sports Building The building we chose is Academy Sports. It is located in Opelika Alabama. Academy is a sporting.
Constructing Homes and Other Buildings
BAR CHART Develop by Henry Gantt. Definitions Activity
10/24/11 - Workflow ManagementCopyright Joanne DeGroat, ECE, OSU1 Project Workflow Management.
Lecture 5 – Gantt Chart GANTT Charts Constructing GANTT Charts
Multifamily and Single-family Homes
Gantt Chart Heba Iqbal. What is a Gantt chart? Developed by Henry Gantt Were considered revolutionary when first introduced Type of bar chart Illustrates.
Manipulating data. Manipulating data means: Putting it into a structure (e.g., tables in a database) Putting it into a computer model.
Objectives 4 Understand the basic concepts of project planning and control 4 Explain PERT and Timeline (Gantt) charts.
Project Management “Project Planning & Scheduling”
Kindergarten: Unit 08 Lesson 01 Partial 100s Chart How to create a Partial 100s Chart from the Five Frame Mat C.
Framing the House. Platform Framing Platform framing.
EGR Project Management Planning Techniques Project manager responsible for developing project implementation plan. Duties includes: Defining.
Project Management MLP, Careers & Employability Division.
Competency: Draw exterior elevations
1 Project Management – Unit 2 – Part 2 – Work Breakdown Work Breakdown o One way to define a Work Breakdown Structure (WBS) is through planned outcomes.
Gantt chart A graphical representation of the duration of tasks against the progression of time. Used for effective time management Lays out the order.
Chapter 12 Network Scheduling Techniques. Scheduling Techniques Gantt or bar charts Gantt or bar charts Milestone charts Milestone charts Line Balancing.
Prof Ralph V. Locurcio, PE CON 2001 CVE Sequence Single Family House - 3,000 square feet Duration 1 General Conditions 21 2 Apply for Permits.
Discussion. Where were some of the earliest two story homes built? (159) 1.
Chapter 7 : Construction 1. Adobe – a mixture of clay and straw used as a structural material in the Southwestern United States.
Project Scheduling Class 7.
Project Management Planning Techniques
3.0 DESIGN PROCESS FOR THE PROPOSED PROJECT 3.1 TIME PLANNING Now, having understanding the Project Management in general and its strategy in the project.
House Construction.
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
Foundations of Technology Construction
Gantt Chart Presentation Name Course Name
Multifamily and Single-family Homes
Drawing & Building Names
Progress Charts.
Gantt Charts.
Tools for project scheduling.
Planning and Scheduling a SIMPLIFIED Construction Project
UML Activity Diagrams.
Competency: Draw exterior elevations
Framing the House                                                                                                                   
Assignment #3 Group 3.
PROJECT MANAGEMENT Bill Biddle.
Project Name – ID # 7/1/2009 Current Project Status Project Issues
PLANNING ENGINEERING AND PROJECT MANAGEMENT
THE HIERARCHY OF SCHEDULES
Kindergarten: Unit 08 Lesson 01 Partial 100s Chart
Foundations of Technology Construction
Lecture 7 PROJECT SCHEDULING Ferdinand Fassa.
LINEAR BALANCE METHOD & MATRIX SCHEDULE
CMPE/SE 131 Software Engineering March 23 Class Meeting
Principles of Management Learning Session # 21 Dr. A. Rashid Kausar.
Project Timeline using Microsoft Project
Time Scheduling and Project management
Presentation transcript:

Gantt Chart

History of the Gantt Chart Henry L Gantt, an American engineer in 1917, developed a horizontal bar chart used as a production control tool. The Gantt chart provides a graphical illustration of activities to be completed according to a specific time schedule. On the left side of the chart is a list of activities. Along the top is the time frame during which each activity is to be completed.

Sequential and Parallel Tasks Presentation Name Course Name Unit # – Lesson #.# – Lesson Name Sequential and Parallel Tasks Project planning organizes tasks Task types: Sequential or linear Task dependent on completion of another task Nondependent or parallel Task not dependent on completion of any other tasks Tasks may be done at any time before or after a particular stage is reached An essential concept behind project planning is that some tasks are dependent on other tasks being completed first. It is not a good idea to start building a house before you have designed it! These dependent tasks need to be completed in sequence, with each stage being completed before the next tasks can begin. We can call dependent tasks sequential or linear. Other tasks are not dependent on completion of any other tasks. These may be done at any time before or after a particular stage is reached. These are nondependent or parallel tasks.

Gantt Chart: Virtual Design Activity

Gantt Chart Example What tasks are needed to build a house? In what order do the tasks need to be performed? Can any tasks be performed at the same time as another task?

Gantt Chart: House Construction Ground

Gantt Chart: House Construction Foundation work starts as site is cleared Foundation Ground

Gantt Chart: House Construction Floors can start after Foundation is completed Floor Foundation Ground

Gantt Chart: House Construction Walls Landscape Floor Foundation Ground

Gantt Chart: House Construction Roof Roof is partially constructed as walls are being built Walls Floor Foundation Ground

Gantt Chart: House Construction Roof Siding started once walls are complete and while roof is being built Siding Walls Floor Foundation Ground

Gantt Chart: House Construction Roof All tasks are complete Siding Walls Landscape Floor Foundation Ground