Stephen McCann, Siemens Roke Manor

Slides:



Advertisements
Similar presentations
Doc.: IEEE /688r2 Submission September 2003 Stephen McCann, Siemens Roke ManorSlide 1 Interworking Update II Stephen McCann, Siemens Roke Manor.
Advertisements

Doc.: IEEE /688r0 Submission September 2003 Stephen McCann, Siemens Roke ManorSlide 1 Interworking Update II Stephen McCann, Siemens Roke Manor.
Doc.: IEEE /xxxr0 Submission May 2004 Stephen McCann, Siemens Roke ManorSlide 1 IEEE Wireless Interworking with External Networks (WIEN)
Doc.: IEEE /828r2 Submission November 2003 Stephen McCann, Siemens Roke ManorSlide 1 Hotspot Evolution Stephen McCann, Siemens Roke Manor
IEEE P802 Handoff ECSG Submission November 2003 Stephen McCann, Siemens Roke ManorSlide 1 WLAN – Cellular Interworking Stephen McCann, Siemens Roke Manor.
Doc.: IEEE /557r0 Submission September 2002 Haslestad, Tan, Aramaki, McCannSlide 1 Wireless Interworking Group Overview and WLAN-3G Interworking.
WLAN-GPRS Integration For Next-Generation Mobile Data Networks Wireless Communications IEEE 2002 報告者:陳崇凱.
Doc.: IEEE /209r0 Submission 1 March GPP SA2Slide 1 3GPP System – WLAN Interworking Principles and Status From 3GPP SA2 Presented.
Doc.: IEEE /162r0 Submission March 2003 Stephen McCann & Max Riegel, SiemensSlide 1 Wireless Interworking Stephen McCann & Max Riegel, Siemens.
Doc.: IEEE /843r0 Submission Cheng Hong, Tan Pek-Yew, Panasonic Slide 1 November 2003 Interworking – WLAN Control Cheng Hong & Tan Pek Yew Panasonic.
Doc.: IEEE /0371r0 Submission May 2005 S. McCann & E. Hepworth, Siemens Roke ManorSlide 1 IEEE 802 Architecture Issues Notice: This document has.
Doc.: IEEE /360r0 Submission September 2002 Stan Bottoms, ConsultantSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
Doc.: IEEE /126r1 Submission January 2004 Stephen McCann, Siemens Roke ManorSlide 1 European 6 th Framework Update Stephen McCann, Siemens Roke.
Doc.: IEEE /006r0 Submission January 2003 Stephen McCann, Siemens Roke ManorSlide 1 WNG – WIG update IEEE & WIG –What is this about ? –Intended.
TGu Process Date: Authors: January 2005 January 2005
Teleconference Agenda
IEEE Future Directions
Liaison Report IEEE work related to
Interworking Study Group Justification
OmniRAN Introduction and Way Forward
Stephen McCann, Siemens Roke Manor
TGu Agenda Date: Authors: May 2007 May 2007
TGu Agenda Date: Authors: May 2007 May 2007
WNG SC Closing Report IEEE , DFW, Texas Mar 9-14, 2003
Stephen McCann, Siemens Roke Manor
Stephen McCann, Siemens Roke Manor
European 6th Framework Update
Security Req. related to Authentication
Month 2002 doc.: IEEE /xxxr0 September 2004 Motion
3GPP2-WLAN Interworking update
Requirements for Network Selection
WLAN Interworking scenarios
TGu Closing Report Date: Authors: May 2006 May 2006
WIEN Study Group Proposed Roadmap
Stephen McCann, Siemens Roke Manor
r0-WNG ETSI BRAN 31 Interworking Group Report
Stephen McCann, Siemens Roke Manor
Stephen McCann, Siemens Roke Manor
NTT Access Network Service Systems Laboratories
TGu Timeline Date: Authors: March 2006 March 2006
TGu Closing Report Date: Authors: July 2006 July 2006
TGu Overview Date: Authors: July 2005 July 2005
3GPP Liaison Report Date: Authors: May 2012 May 2012
DLP & Security March 2003 Month 2002 doc.: IEEE /xxxr0
TGu Closing Report Date: Authors: March 2006 March 2006
TGu Timeline Date: Authors: July 2005 July 2005
TGu Closing Report Date: Authors: July 2005 July 2005
OmniRAN Introduction and Way Forward
WNG SC Opening Report IEEE , DFW, Texas Mar 9-14, 2003
Doc.: IEEE /423r1 July 2001 Mar 15-19, 2004 WNG SC Committee Report IEEE , Orlando, Florida, March 15-19, 2004 TK Tan, Philips (Chair)
78th Session of the IEEE WG
Stephen McCann, Siemens Roke Manor
Interworking Agenda and Work Items
TGu Process Date: Authors: January 2005 January 2005
Stephen McCann, Siemens Roke Manor
Interworking Update II
r0-WNG Interworking Comments and Issues
TGu Closing Report Date: Authors: January 2006 January 2006
Stephen McCann, Siemens Roke Manor
Stephen McCann, Siemens Roke Manor
TGu Closing Report Date: Authors: March 2005 March 2005
TGu Closing Report Date: Authors: January 2005 January 2005
NTT Access Network Service Systems Laboratories
TGu Closing Report Date: Authors: November 2006
3GPP Liaison Report Date: Authors: January 2013
Stephen McCann, Siemens Roke Manor
3GPP2-WLAN Interworking update
Closing Report Date: Authors: July 2008 July 2008
ETSI-BRAN #29 Interworking Group Liaison Report to IEEE WNG
TGu Closing Report Date: Authors: January 2005 January 2005
Presentation transcript:

Stephen McCann, Siemens Roke Manor stephen.mccann@roke.co.uk July 2003 Interworking Update Stephen McCann, Siemens Roke Manor stephen.mccann@roke.co.uk Stephen McCann, Siemens Roke Manor

WIG #3 WLAN Interworking Group Month 2002 doc.: IEEE 802.11-02/xxxr0 July 2003 WIG #3 WLAN Interworking Group Co-operation between ETSI BRAN, IEEE 802.11 and MMAC HSWA to define a common approach and interface, based on loose coupling model, using IP. Output document : 11-03-458r0-WNG-WIG Baseline Document_II.doc ETSI BRAN & MMAC HSWA in hibernation Stephen McCann, Siemens Roke Manor John Doe, His Company

Wireless Interworking July 2003 Wireless Interworking HLR AAAH 3GPP MNO Roaming Broker Mobile Client AC AAAH 3GPP2 MNO Internet W-ISP Access Network Home ISP AAAH Stephen McCann, Siemens Roke Manor

Month 2002 doc.: IEEE 802.11-02/xxxr0 July 2003 Interworking : Scope The scope of the project is to enhance the 802.11 standard and amendments, through the generation of a standard (or RP) to add interworking capability to both cellular and external IP based networks (including the Internet) Stephen McCann, Siemens Roke Manor John Doe, His Company

Month 2002 doc.: IEEE 802.11-02/xxxr0 July 2003 Objectives To generate two output documents to enhance the 802.11 standard and amendments: i)  Cellular and external IP network interworking requirements ii) Cellular and external IP network interworking reference architecture description These outputs will define and specify the addition of specific interfaces to deal with interworking security, accounting and resource allocation between an 802.11 system and the aforementioned external networks. Stephen McCann, Siemens Roke Manor John Doe, His Company

Month 2002 doc.: IEEE 802.11-02/xxxr0 July 2003 Way forward 802.11 requires some extra work in the DS to define external interworking TGe, TGf, TGi and TGk have started to do this already with functional definitions Accounting/Charging ? Policy ? Must address W-ISP, 3GPP & 3GPP2 specific requirements placed on 802.11 Stephen McCann, Siemens Roke Manor John Doe, His Company

July 2003 802.11 existing bits ? Stephen McCann, Siemens Roke Manor

Draft Skeleton Outline Month 2002 doc.: IEEE 802.11-02/xxxr0 July 2003 Draft Skeleton Outline Information submission : 11-03-459r1 Authentication (TGi) Authorization (TGi) Accouting (IPDR) QoS (TGe) Policy (DiffServ/COPS) Mobility (Macro : MIP, Micro : TGk, Handoff) Stephen McCann, Siemens Roke Manor John Doe, His Company

Current Actions From 3GPP Month 2002 doc.: IEEE 802.11-02/xxxr0 July 2003 Current Actions From 3GPP Can proposed 3GPP interworking model can be achieved from current 802.11 standards ? Will 802.11 be able to use Diameter ? What entity will produce charging records within the 802.11 Access Network ? Will policy control be provided within the 802.11 Access Network ? Stephen McCann, Siemens Roke Manor John Doe, His Company

Roadmap Encourage technical submissions for Singapore meeting Month 2002 doc.: IEEE 802.11-02/xxxr0 July 2003 Roadmap Encourage technical submissions for Singapore meeting Draft skeleton becomes a Recommended Practice (RP) Incorporate the WLAN interworking requirements from 3GPP, 3GPP2, WiFi Alliance and others Work towards technical solutions for the differences between the interworking models Move to create a study group in Singapore Stephen McCann, Siemens Roke Manor John Doe, His Company