Presentation is loading. Please wait.

Presentation is loading. Please wait.

Doc.: IEEE 802.15-02/360r0 Submission September 2002 Stan Bottoms, ConsultantSlide 1 Project: IEEE 802.15 Working Group for Wireless Personal Area Networks.

Similar presentations


Presentation on theme: "Doc.: IEEE 802.15-02/360r0 Submission September 2002 Stan Bottoms, ConsultantSlide 1 Project: IEEE 802.15 Working Group for Wireless Personal Area Networks."— Presentation transcript:

1 doc.: IEEE 802.15-02/360r0 Submission September 2002 Stan Bottoms, ConsultantSlide 1 Project: IEEE 802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [WNG Liaison Report for Session #20/Monterey] Date Submitted: [13September02] Source: [Stan Bottoms] Company [Consultant] Address [173 Manningham Drive Madison, AL USA 35758] Voice:[+1 256 464 8725], FAX: [+1 413 581 1560], E-Mail:[stan_bottoms@hotmail.com] Re: [WNG SC] Abstract:[WNG Liaison Overview to WG] Purpose:[WNG liaison report to WG to update them on 802.11 WNG SC] Notice:This document has been prepared to assist the IEEE 802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release:The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by 802.15.

2 doc.: IEEE 802.15-02/360r0 Submission September 2002 Stan Bottoms, ConsultantSlide 2 IEEE 802.15 Working Group for Wireless Personal Area Networks (WPAN™) WNG SC Liaison Report September 2002 Monterey, CA

3 doc.: IEEE 802.15-02/360r0 Submission September 2002 Stan Bottoms, ConsultantSlide 3 Monterey Summary Three sessions –2 Monday, 1 Wednesday WIG –Kickoff meeting –Joint meeting with ETSI BRAN/MMAC –Liaison statements Japanese 4.9-5 GHz bands –PAR/5C

4 doc.: IEEE 802.15-02/360r0 Submission September 2002 Stan Bottoms, ConsultantSlide 4 WIG Highlights Established scope, admin/organizational issues, work items and production of official statements. –(11-02-557r1-WNG Wireless_Interworking_Opening.ppt) Introduction to relevant work accomplished within ETSI BRAN/MMAC and 3GPP WIG approved liaison statements to external bodies Met all goals for this meeting.

5 doc.: IEEE 802.15-02/360r0 Submission September 2002 Stan Bottoms, ConsultantSlide 5 WIG Background WIG (Wireless LAN Interworking Group) A jointly created group by –MMAC HSWA –ETSI Project BRAN –IEEE 802.11 The group is to work on the issues related to 3G and other public access networks interworking.

6 doc.: IEEE 802.15-02/360r0 Submission September 2002 Stan Bottoms, ConsultantSlide 6 DRAFT WIG Scope To be an integral part in the production of a generically applicable interworking standard for WWAN and other public networks. The standard is to be applicable for IEEE 802.11 family, MMAC HiSWAN family and ETSI HIPERLAN/2 To be the point of resolution for ETSI, IEEE and MMAC on issues related to interworking with WWAN and other public networks. To be the single point of contact for the above mentioned WLAN standards on questions related to interworking with WWAN and other public networks.

7 doc.: IEEE 802.15-02/360r0 Submission September 2002 Stan Bottoms, ConsultantSlide 7 Meeting Schedule HSWA#7 Apr 3-4 HSWA#8 Jun 17-21 HSWA#9 Sep 24-27 BRAN#28 Apr 16-19 Sophia Antipolis BRAN#29 Jul 2-5 Sophia Antipolis BRAN#30 Oct 1-4 Sophia Antipolis BRAN#31 Dec 10-13 Sophia Antipolis BRAN#32 Feb ? Sophia Antipolis 802.11#74 May 13-17 Sydney 802.11#76 Sep 9-13 Monterey WIG#1 Monterey 802.11#75 Jul 8-12 Vancouver 802.11#77 Nov 11-15 Kauai 802.11#78 Jan ? ???? Tokyo HSWA#10 Nov 25-29 Tokyo HSWA#11 Jan/Feb??? WIG#2 Tokyo

8 doc.: IEEE 802.15-02/360r0 Submission September 2002 Stan Bottoms, ConsultantSlide 8 Internal Interfaces How to communicate internally? Necessary to deploy a joint email exploder. WIG@list.etsi.fr stds-802-11-wig@ieee.org

9 doc.: IEEE 802.15-02/360r0 Submission September 2002 Stan Bottoms, ConsultantSlide 9 Japanese 4.9-5 GHz Bands Background The Japanese Ministry published rules for the use of the bands on August 6 th and 7 th, 2002. 11-02/480r3 Preparation of PAR and 5 Criterion addressing Japan’s 4.9-5GHz bands described situation in July, 2002.

10 doc.: IEEE 802.15-02/360r0 Submission September 2002 Stan Bottoms, ConsultantSlide 10 Preparation of PAR and 5 Criterion addressing Japan’s 4.9-5GHz bands Changes to 802.11,.11a and.11d to meet Japan’s proposed regulatory requirements for low-band 4.9- 5GHz operation –Operating channel frequencies –Transmit power level –In band and out of band spurious emissions –IBSS (adhoc) prohibition PAR/5 Criterion preparation does not appear to warrant formation of a Study Group, but should be developed to be submitted to the 802 exec before November 802 Plenary.

11 doc.: IEEE 802.15-02/360r0 Submission September 2002 Stan Bottoms, ConsultantSlide 11 WNG Japanese 4.9 GHz-5 GHz Motions Sept (WNG): Move to have WNG move that the 802.11 Working Group forward to the 802 exec for approval 802.11- 02/564r0 PAR and 802.11-02/565r0 Five Criteria to extend 802.11, 802.11a and 802.11d to the Japanese 4.9GHz-5GHz bands (Results: 14/0/0) Sept (WG): Move to approve the PAR (11-02-564r0) and Five Criteria (11-02-565r0) requesting a task group be established to extend 802.11, 802.11a and 802.11d, as necessary, to the Japanese 4.9GHz-5GHz bands and forward them to LMSC ExCom for task group approval at the November 2002 IEEE 802 Plenary.

12 doc.: IEEE 802.15-02/360r0 Submission September 2002 Stan Bottoms, ConsultantSlide 12 BACKUPS

13 doc.: IEEE 802.15-02/360r0 Submission September 2002 Stan Bottoms, ConsultantSlide 13 September Reference Documents –11-02-557r0-WNG-Wireless_Interworking_Opening –11-02-581r0-WNG-WIG_Liaison_Preparation –11-02-533r1-WNG-4.9_5.0GHz-in-Japan –11-02-564r0-WNG-PAR-4.9GHz-5GHz-Japan –11-02-565r0-WNG-5Criteria-4.9GHz-5GHz-Japan –11-02-337r5-WNG-Draft_Radio_Measurement_PAR_8 –11-02-340r5-WNG-Draft_Radio_Measurement_5- Criteria_8 –11-02-585r0-WNG-Authentication_Hiperlan_HiSWANa –11-02-560r0-WNG-WNG_Closing_Report.ppt

14 doc.: IEEE 802.15-02/360r0 Submission September 2002 Stan Bottoms, ConsultantSlide 14 Liaison statements 11-02-571r0-WNG-Draft_LS_to_3GPPSA.doc 11-02-572r0-WNG-Draft_LS_to_3GPP2.doc 11-02-573r0-WNG-Draft_LS_to_GSMA.doc 11-02-575r0-WNG-Draft_LS_to_Wifialliance.doc 11-02-576r0-WNG-Draft_LS_to_H2GF.doc 11-02-578r0-WNG-Draft_LS_to_Passone.doc 11-02-579r0-WNG-Draft_LS_to_OpenGroup.doc 11-02-580r0-WNG-Draft_LS_to_IETF.doc


Download ppt "Doc.: IEEE 802.15-02/360r0 Submission September 2002 Stan Bottoms, ConsultantSlide 1 Project: IEEE 802.15 Working Group for Wireless Personal Area Networks."

Similar presentations


Ads by Google