NAMAs institutional Arrangements in Morocco Ministère de l’Energie, des Mines, de l’Eau et de l’Environnement Département de l’Environnement المملكة المغربية ROYAUME DU MAROC وزارة الطاقة والمعادن والماء والبيئة قــطــاع البـيــئــة NAMAs institutional Arrangements in Morocco Regional workshop on promoting collaboration to facilitate preparation, submission and implementation of NAMAs 17 April 2013, Maseru Naima Oumoussa SCC/ONEM/DE 1
Outline Introduction Different approaches taken Institutional arrangements Perspectives and challenges
Introduction CC a cross cutting issue Several initiatives are currently launched: TNC LECB programme / UNDP FIRM programme / UNEP CCC / GIZ PMR / WB Ensuring synergy between the different programmes to optimize available resources. Strengthening inter-agency coordination
4 Approaches for Institutional arrangements Building on existing initiatives Strengtning existing institutional structures: CNCC Bringing together instituions working together on CC, NAMAs and LEDS: A Technical Steering Committee Involving academia and scientific community (relevant data and national emission factors)
Institutional Arrangements Experts - Consultants National Committee for CC Ministry of Energy, Mines, Water and Environment Department of Environment UNDP Team Project Management Unit Technical Steering Committee PNUD-Env-Ind-Energ-Transp-Int-Agr-Hab Head of the Project Technical Responsible Administrative and Financial Assistant
Perspectives and challenges Shift from the project based approach to internalize GHG inventories & mitigation efforts Build the required expertise and institutions' capacities to prepare BURs Link NAMAs process with overall sustainable Development Political will
Thank you very much for your attention