SOUTH SACRAMENTO COUNTY STREAMS GROUP UPDATE

Slides:



Advertisements
Similar presentations
Marin Coastal Permit Coordination Program North Bay Watershed Association January 18, 2011.
Advertisements

Capital Improvement Program City of Snoqualmie Public Works Department.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Sacramento Municipal Utility District Slab Creek Small Hydro Project PI: Scott.
US Army Corps of Engineers BUILDING STRONG ® Suburban Flooding: Finding regional solutions to a growing problem Imad Samara Project Manager and Silver.
US Army Corps of Engineers Sacramento District BUILDING STRONG ® SOUTH SACRAMENTO COUNTY STREAMS GROUP UPDATE Marshall Marik Project Manager South Sacramento.
March 26, 2009 State Construction Penalties on Parking Violations Understanding the effect of SB 1407.
AIWW Deep Creek Bridge Replacement Information Update
Clean Water Act Section 404: An O&G Perspective Andrew D. Smith SWCA Environmental Consultants.
In coordination with FEMA Scoping Meeting Lake County, California February 19, 2010.
History of Civil Engineering at Kansas State University The Kansas Transportation Engineering Conference Connection.
HYDROLOGY FOR ENGINEERING MANAGEMENT MSc
District of Columbia Water and Sewer Authority George S. Hawkins, General Manager Briefing on: NORTHEAST BOUNDARY NEIGHBORHOOD PROTECTION PROJECT FIRST.
Presented to: 32 nd Annual Airport Conference – Hershey, PA By: Jeff Gagnon, P.E. Manager AJP-6312 Date: March 4, 2009 Federal Aviation Administration.
Route CC bridge replacement over Caulk’s Creek. What is the problem? Large debris consistently collects on the upstream end of the bridge. This causes.
US Army Corps of Engineers BUILDING STRONG ® USACE Status: Metro East Levees September 21, 2011.
The Transcontinental Railroad The Idea The Construction The People Involved.
Southern Delivery System NSPE-Colorado State Meeting February 19, 2010.
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
US Army Corps of Engineers BUILDING STRONG ® SAFCA Board Update Dan Tibbitts Senior Project Manager Common Features Levee Programs Branch Sacramento District.
Utility & Rail Coordination in Project Development Jennifer McCleve Utilities & Rail Branch Manager.
Portside Logistics Boundary Rainier Pointe Access Library Local Improvement District Formation Hearing LID 14-1 for Construction of 66 th Avenue East March.
Marin Coastal Permit Coordination Program. Why do we need a program? Called for in Watershed Plans: As many as 9 permits to consider for restoration.
CORPS OF ENGINEERS NWS Meeting Tallahassee, FL, July 19, 2006.
Kilarc-Cow Creek Hydroelectric Project Decommissioning FERC Project No. 606 Technical Meeting May 16, 2007, 1-4 pm Red Lion Redding, CA.
COMPREHENSIVE FLOODPLAIN MANAGEMENT : Promoting Wise Uses of Floodplains CA Department of Water Resources/ CIFMCG Workshop July 2006.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Tom Norton, Executive Director Colorado Department of Transportation American Association of State Highway and Transportation Officials September 9, 2003.
Overview of the 401 WQC Process. Main Topics Relationship between Clean Water Act Sections 404 and 401 State permitting processes Specifics of Kentucky’s.
The Story of Floodplain Remapping in Springfield, Missouri.
May’s Accomplishments Mobilized Authority and Design Build Contractor staff to Authority offices at 707 Wilshire Three Open House meetings were held in.
US Army Corps of Engineers Sacramento District BUILDING STRONG ® SOUTH SACRAMENTO COUNTY STREAMS GROUP UPDATE Marshall Marik Project Manager South Sacramento.
CHSRA SMALL AND DISADVANTAGED BUSINESS ENTERPRISE PROGRAM Society of American Military Engineers (SAME) Thursday, November 8, 2012.
Missoula County Commissioners and City Council formed the Missoula Valley Water Quality District (MVWQD) Missoula County Commissioners.
Former DuPont Barksdale Works Project Update July 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
US Army Corps of Engineers Sacramento DistrictIntroductionIntroduction Sacramento River Bank Protection Project: Phase II Supplemental Authorization –
2 American River Common Features General Re-evaluation Report Request for Board Approval of Letter Requesting Consideration of Locally Preferred Plan (LPP)
Grand Valley Metropolitan Council March 3, 2016 Erick Kind Region Engineer MDOT-Grand Region.
County-Wide Act 167 Plan “County-wide Act 167 Stormwater Management Plan for Chester County, PA” was prepared by: Chester County Water Resources Authority.
West Sacramento Area Flood Control Agency November 10, 2011 Update on Current Levee Construction Projects and on the Southport Sacramento River Levee Early.
Azusa Utility Board Meeting January 28, Power Resources Division Monthly Report Power Resource Update Power Consumption Comparison Wholesale Market.
City of Stockton Levee Flood Protection Status Report January 29, 2008 Agenda Item 4.03.
Office of the State Fire Marshal Pipeline Safety Division
ND Downstream Watersheds Comprehensive Detention Planning
Town of Brighton, Department of Public Works
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Construction Technical Services, Inc.
THE CORPS REGULATORY AUTHORITY
FY 2012 Status Report on the North Mainland (Ormond Crossings CRA)
OTA Technical Conference September 13, 2017 Joint Utility Construction
A. Datum Corporation Bid package overview
E-Tariff Technical Volunteers Status Update
Lesson Two: Information Gathering
A. Datum Corp. Bid package overview.
August 28, 2018.
Pryor Creek Trail - Phases 1A & 1B Pryor Creek, OK
Southern Delivery System
Belpre Construction / Post Construction
National Association of State Conservation Agencies
SOUTH SACRAMENTO COUNTY STREAMS GROUP UPDATE
SOUTH SACRAMENTO COUNTY STREAMS GROUP UPDATE
February 14, 2019.
DESIGN ENHANCEMENTS DESIGN UPDATE. DESIGN ENHANCEMENTS DESIGN UPDATE.
* 07/16/96 Steve Price, *
Water Allocation Committee IBT Update July 2015
Richland Creek Water Supply Program Program Update
Design and Engineering Services
AN INVESTMENT IN CALIFORNIA’S FUTURE
Sacramento Environmental Commission January 2019.
K Street, Sacramento – 1861/1862 Flood
Hyatt Regency Monterey, CA September 9-13, 2002
Presentation transcript:

SOUTH SACRAMENTO COUNTY STREAMS GROUP UPDATE Marshall Marik Project Manager South Sacramento Streams Group Sacramento District January 19, 2012

Morrison Creek Construction Along Union Pacific Railroad Construction kick-off meeting was held January 5th. Constructor has provided pre-construction submittals for review. Coordinating with Sacramento Municipal Utilities District for gas pipeline protection plan.

Post Authorization Change Report (PACR) Existing conditions hydrology is certified. Floodplain work is on-going. PACR is scheduled to complete in July 2014.

Marshall Marik US Army Corps of Engineers 1325 J Street Sacramento, CA 95814-2922 (916) 557-7698