Agile Mini Survey Results January 2012 Scott W. Ambler www.ambysoft.com/scottAmbler.html Copyright 2012 Scott W. Ambler www.ambysoft.com/surveys/
Copyright 2012 Scott W. Ambler www.ambysoft.com/surveys/ How To Use These Slides I have provided these slides, and the raw data behind them, so that others can use them in their own work. You may reuse all, or a part of, this slide deck as long as you provide a clear reference to the source. The suggested reference is: Results from Scott Ambler’s January 2012 Agile Mini Survey posted at www.agilemodeling.com/surveys/ Copyright 2012 Scott W. Ambler www.ambysoft.com/surveys/
Copyright 2012 Scott W. Ambler www.ambysoft.com/surveys/ About the Survey January 2012 Survey link included in: Tweet by @scottwambler Posting to the Agile and Lean discussion group on LinkedIn Posting to the Agile Project Management group on Yahoogroups Data, summary, and slides downloadable from www.ambysoft.com/surveys/ 149 respondents 44% on agile projects currently 29% on projects where they’re becoming more agile 19% were on agile projects in the past Copyright 2012 Scott W. Ambler www.ambysoft.com/surveys/
The Value of Planning Practices to Agile Teams % of responses Copyright 2012 Scott W. Ambler www.ambysoft.com/surveys/