Managing Risks for Winnipegs Water Treatment Program Presented by Tom R. Pearson, P. Eng, Project Director.

Slides:



Advertisements
Similar presentations
Transportation Funding Alternatives and Outreach
Advertisements

Learning from Events 12th June 2013 The Tata Steel Approach
Evaluation at NRCan: Information for Program Managers Strategic Evaluation Division Science & Policy Integration July 2012.
Community-Based Research Workshop Series CBR 206 Writing Effective Letters of Intent.
National Emerging Infectious Diseases Laboratories Risk Assessment
Planning Reports and Proposals
NIMS ICS All-Hazard Position Specific Training – A Way Forward A Special Presentation for the All Hazards IMT Conference Houston, Texas November 4.
Elements of an Effective Safety and Health Program
1 UNIVERSITIES of AUSTRALASIA BENCHMARKING RISK MANAGEMENT BILL DUNNE DIRECTOR RISK MANAGEMENT UNSW. PROUDLY SPONSORED BY UNIMUTUAL.
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Managing Risk CHAPTER SEVEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
2010 HPRCT Presentation – Optimized Human Error Evaluation June 23 rd, 2010 Presenter: Terry J. Herrmann, P.E. Associate, Structural Integrity Associates.
Museum Presentation Intermuseum Conservation Association.
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
Aviation Security Training Module 4 Design and Conduct Exercise II 1.
1 OAS Financial Management Challenges and Program- Budget Implications 1 SECRETARIAT FOR ADMINISTRATION AND FINANCE October 2008.
Lisa Brown and Charles Thomas LAWNET 2002 Taking the Mystery Out of Project Management.
WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
Objectives To introduce software project management and to describe its distinctive characteristics To discuss project planning and the planning process.
ActionDescription 1Decisions about planning and managing the coast are governed by general legal instruments. 2Sectoral stakeholders meet on an ad hoc.
BUILDING THE CAPACITY TO ACHIEVE HEALTH & LEARNING OUTCOMES
Year 6 mental test 10 second questions
Modern Systems Analyst and as a Project Manager
NPV.
Introduction to Auditing
Guidance on New CEs Emergency Repair Projects Operational Right-of-Way Limited Federal Funds EUM – March questions to:
Treating Our Water…Right! Winnipegs Water Treatment Program.
Site Safety Plans PFN ME 35B.
1 According to PETROSAFE safety policy, the company is keen that: Introduction All Egyptian Petroleum companies and foreign companies working in A.R.E.
EMS Checklist (ISO model)
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
MAKERERE UNIVERSITY DIRECTORATE OF INTERNAL AUDIT ACCOUNTABILITY SYSTEMS AND PROCESSES RIDAR HOTEL SEETA 16 TH – 18 TH JUNE 2011 Presented by SAMUEL NATWALUMA.
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
2009 Strategic Planning playbook
Effectively applying ISO9001:2000 clauses 6 and 7.
AACEI Contingency Forum Contingency Management
Chapter 10 Project Cash Flows and Risk
Module 14 Major Incident Management Module 14 Major Incident Management incident Problems in major and complex incident management Major incident management.
Capacity Planning For Products and Services
Capacity Planning For Products and Services
Determining the Significant Aspects
Developing and Implementing a Monitoring & Evaluation Plan
PEACE-KEEPING BUDGETS CURRENT PROCESS OF ESTABLISHING AND EXTENDING PEACE- KEEPING OPERATIONS A: New missions: 1.A Survey mission is sent to the area of.
$424$ Financial Planning and Control Financial Planning
1 The Road to Merit Pay Merit Pay Workshop August 2013 Office of Human Resources 1.
CHAPTER 1: UNDERSTANDING THE FINANCIAL PLANNING PROCESS.
Trustee Financial Training 1. Agenda: 1.Overview of the Foundation 2.Define and discuss University-controlled Activities 3.Track a University-controlled.
Strategic Financial Management 9 February 2012
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
There are three types of emergencies:  Internal  External  Natural disasters.
Ken Jacobs Airport Planning & Environmental Division March 3, 2010 Federal Aviation Administration Federal Aviation Administration 33.
City Council Meeting Agenda Items October 28, 2013.
Visual 5.1 General Staff Functions Unit 5: General Staff Functions.
Functional Areas & Positions
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
Copyright ©2004 Pearson Education, Inc. All rights reserved. Chapter 1 Overview of a Financial Plan.
Benefits of an As-Needed Construction Management Services Contract CMAA NATIONAL CONFERENCE October 2009 Copyright © 2009 by R. W. Beck, Inc. All Rights.
Visual 3.1 Delegation of Authority & Management by Objectives Unit 3: Delegation of Authority & Management by Objectives.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
©2008 Prentice Hall Business Publishing, Auditing 12/e, Arens/Beasley/Elder The Impact of Information Technology on the Audit Process Chapter 12.
PSSA Preparation.
Module 13 Unified Command Module 13 Unified Command Origin of Unified Command Origin of Unified Command Description of Unified Command Description of Unified.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
1 Crisis Management Planning for Schools Maine Department of Education Department of Health and Human Services Maine Emergency Management Agency June 2006.
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
Project Risk Management. The Importance of Project Risk Management Project risk management is the art and science of identifying, analyzing, and responding.
Risk Management - the process of identifying and controlling hazards to protect the force.  It’s five steps represent a logical thought process from.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
RISK ASSESSMENT TOOL PREVIEW
Presentation transcript:

Managing Risks for Winnipegs Water Treatment Program Presented by Tom R. Pearson, P. Eng, Project Director

2 Agenda Background Project Profile Project Status Winnipegs Policy on Risk Management Key Issues Initial Risk Assessment Process Outcome Ongoing Risk Management Management of risks – Examples Benefits of risk management Questions

3 Background – Councils Decision to Treat In 1993 Council -Accepted the recommendation to undertake water treatment within a ten year time frame -And established a Water Treatment Reserve Between 1995 and 1999 a comprehensive program of monitoring, pilot testing and engineering studies was undertaken In 2000, Council adopted a recommendation that Winnipeg proceed with a water treatment program This decision was supported by public consultation, public health officials and the opinion of an expert panel (low risk – high consequence)

4 Background - Specific Objectives Reduce the risk of a waterborne disease outbreak caused by chlorine-resistant microorganisms Reduce chlorine disinfection by-products Meet the Canadian Drinking Water Quality Guidelines

5 Background - Plant Location

6 Background - History

7 Profile - Our New Treatment Plant Located at the Deacon Reservoir Site. Design Life projected to be 2040 Maximum Finished Water Production– 400 ML/d Average Finished Water Production – 254 ML/d Minimum Finished Water Production – 100 ML/d Total cost now projected at $300 Million

8 PROFILE - AERIAL VIEW FROM SOUTH WEST

9 Profile - The Water Treatment Process

10 Project Status Detailed Design is underway, concurrent with construction Design will wrap up this year About $55.3 Million spent Overall, we have committed about $192.2 Million to date The $300 Million budget projection appears to be secure

11 Risk Management in Winnipeg In June, 1999 the City Auditor recommended to Council pursuant to a review of the Main Norwood Bridge, that We must ensure a corporately focused and risk-based approach to managing major capital projects. Policies and governance concerning risk are the responsibility of the Chief Financial Officer Administered under the auspices of the Corporate Controller All large projects ($10 Million or more) must report each quarter to the Committee on Fiscal Issues, outlining project status, emerging risks and steps to mitigate Reports are reviewed by a Major Capital Committee before submittal to the Committee on Fiscal Issues Risk management is identified as a deliverable in project Terms of Reference

12 Key Issues Environmental Issues Organizational Issues Market Conditions Schedule Finances

13 Environmental Effects Assessment An Environmental Effects Assessment study of the effects the water treatment plant identified no adverse effects. The study was voluntary –not required by regulators. The results were shared with stakeholders and Manitoba Conservation. Two Public Open Houses were held in Springfield; All substantive issues were addressed. The Environmental Effects Assessment study reduced project risk, and improved the quality of the project.

14 Organizational Issues This is a large complex project with four major consulting firms working from geographically diverse locations Coordination/communication through ERoom Construction Management and Fast Tracking lead to risks and cultural issues for City and Consultants Hiring and training of certified operators in time for commissioning and start-up (2008 by Council mandate) will be challenging

15 Market Conditions Many large new projects will be going to market over the scheduled construction period A period of high inflation within the construction industry is forecast (time = money) A shortage of qualified contractors and personnel is anticipated We must make this an attractive project for contractors

16 Aggressive Schedule April 2005Finish preliminary design and environmental effects study Spring 2005Started building the water treatment plant Fall 2008Start testing the plant End of 2008Begin operating the plant

17 Finances The original water treatment program budget was $214 million to build the WTP and $12.75 million/yr to operate Council has approved an additional $13.3 million for risk mitigation initiatives and $2.8 million for shops/staff consolidation (Total budget now at $230.1 Million) The current rate model will provide about $117 Million in cash financing Projected cost is now $300 Million and additional borrowing will be required Once the plant is up and operating, revenues from water sales are sufficient to cover operating and debt servicing without extraordinary increases to water rates

18 Initial Risk Assessment Undertaken after preliminary design, before starting detailed design 2-day workshop format Pre-workshop preparation; survey of participants concerns orientation concerning risk assessment methodology and terms Facilitated by S.M.A. Consulting Ltd.

19 Workshop Participants 23 in total, in addition to SMA staff City – 9 Earth Tech – 5 UMA – 5 EPCOR – 3 TetrEs – 1 Participants were divided into 5 groups that considered specific types of risks

20 Group Assignments 1: Identify potential problems with the design. 2: Risk analysis focused on design of treatment processes, and mechanical equipment etc. 3: Risks analysis focused on operations including commissioning, resources, operations, responses to disastrous situations, contingency planning etc. 4: Risks associated with project coordination, project management, schedule, staging, estimating, cash flow, and external factors. 5: Risks associated with constructability, underground work, construction logistics, staging, tie-ins, and contracting strategies etc.

21 Quantifying Risk Factors – 4 Steps 1.Determination of the likelihood of the factor being encountered (e.g. probability, or a subjective descriptor) 2.Determination of the magnitude of the impact if the factor is encountered (e.g. dollar value or a subjective descriptor) 3.Determination of the overall severity of the factor by multiplying the likelihood (1) by magnitude (2). 4.The factors are then grouped based on the overall severity score and risk responses are developed

22 Step 1 - Determination of Likelihood

23 Step 2 – Determination of Magnitude

24 Step 3 - Determination of Severity

25 Step 4 – Develop a Risk Response Possible actions include: Reduce uncertainty by obtaining more information. (This may lead to a re-evaluation of the likelihood and sometimes the magnitude.) Eliminate or avoid the risk factor by partial or complete modifications to proposed ideas, a different strategy, etc. Transfer the risk element to other parties. Insure against the occurrence of the factor if possible. Abort the project if the risk is intolerable and no other means can be undertaken to mitigate its damages. A planned response must be developed for all risks.

26 Outcome 120 risk items were identified by workshop participants These were synthesized into 44 project issues and 33 design issues by the Risk Consultant. Some of the risks were Serious to Critical

27 Ongoing Risk Management The risk management plan defines specific tasks to be undertaken to mitigate the risk Responsibility and timelines for the tasks are assigned Follow up on the risk factors is undertaken on a regular basis until the project is complete. Risks are monitored on an ongoing basis by the project risk team and reviewed at monthly meetings

28 Risk -Public Involvement The public open house (or action by a resident or RM) could result in additional requirements to mitigate perceived risks or nuisance or the need to file an Environmental Impact Statement. Then the project will be impacted. Assessment: L: 10; M: 50; S: 500 Recommended Action: 1- Open House 2- Environmental effects assessment 3- Continued communication

29 Risk – Impact of Floodway Operation Floodway operation may impact early stages of Construction particularly bulk excavation. Impact is increased potential of base heave from till layer; increased pore pressure affecting slope stability. Assessment: L: 20; M: 15; S: 300 Recommended Action: 1- Stop excavation at 50% depth 2- Install pump wells 3- Pile first / excavate after - cost

30 Risk – Long Duration Power Outage If a power outage occurs then the DBPS pumps will stop and water supply to the city will be harmed Assessment: L: 10; M: 50; S: 500 Recommended Action: Could add backup power for partial UV and chlorination (chlorine - $2M at deacon, backup power $3). Come up with boil water strategy and potential for delay with regulators.

31 Outcome – Chlorine Risk analysis: The probability of an accident resulting in a catastrophic release of chlorine gas from a rail tank car is very unlikely, but the consequences are disastrous and may include injury or death to City personnel and the general public. Recommended that this risk be eliminated or reduced. Additional capital funding of $7.3 million required for on- site sodium hypochlorite generation, and operating costs will increase by $74,000 per year.

32 Outcome – Power Risk analysis: The probability of a long duration power failure which would cause depletion of potable water storage and result in the need to supply untreated water is very unlikely, but the consequences are severe and include the need to boil water to ensure health safety during the power outage. Recommended that the risk be eliminated. Additional capital funding of $6.0 million required for increased standby generation capacity, and operating costs will increase by $90,000 per year.

33 The Benefits of Risk Management Quality Credibility Cost Value

34 Questions?