Status of muon monitor R&D and construction

Slides:



Advertisements
Similar presentations
CSC Test Beam Data Analysis Alexander Khodinov and Valeri Tcherniatine.
Advertisements

TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
ISS, 23 September 2005E. Gschwendtner, CERN1 Beam Instrumentation at CNGS 1. Introduction 2. Layout 3. Beam Instrumentation 4. Summary.
Beam Loss Analysis Tool for the CTF3 PETS Tank M. Velasco, T. Lefevre, R. Scheidegger, M. Wood, J. Hebden, G. Simpson Northwestern University, Evanston,
N_TOF fission data of interest for ADS
LECC 2006 Ewald Effinger AB-BI-BL The LHC beam loss monitoring system’s data acquisition card Ewald Effinger AB-BI-BL.
The DESY Gas Monitor Detector (GMD) at the SXR beamline at LCLS Stefan Moeller, LCLS Kai Tiedtke, Svea Kreis, Fini Jastrow, Andrei Sorokin (DESY) Michael.
Performances of a pixel ionization chamber to monitor a voxel scan hadron beam A.Boriano 3, F.Bourhaleb 2,3, R. Cirio 3, M. Donetti 2,3, F. Marchetto 3,
Matching and Synchrotron Light Diagnostics F.Roncarolo, E.Bravin, S.Burger, A.Goldblatt, G.Trad.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
ORNL-SNS Diagnostic Group SNS Beam Loss Monitors and HARPs Machine Protection System FDR September 11,2001 Presented by Saeed Assadi.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
DØ Radmon status 26/08/99 Sijbrand de Jong/Bram Wijngaarden/Silke Duensing Contents:  What is to be monitored and what actions to take ?  Historical.
BI day 2011 T Bogey CERN BE/BI. Overview to the TTpos system Proposed technical solution Performance of the system Lab test Beam test Planning for 2012.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
V.Grishin, A.Koshelev, A.Larionov A.Pushkarev, V.Seleznev, M.Sleptsov A.Sytin.
Status of Beam loss Monitoring on CTF3 Results of Tests on LINAC and PETS as R&D for TBL Anne Dabrowski Northwestern University Thibaut Lefevre CERN CTF3.
Managed by UT-Battelle for the Department of Energy SNS BLM System Overview Detectors, Measurements, Simulations Alexander Zhukov Saeed Assadi SNS/ORNL.
Malte Hildebrandt, PSIMEG - Review Meeting / 1   e  Drift Chambers Charge Division Test Chamber Testsetup for Cosmics Chamber Construction.
C. Fischer – LHC Instrumentation Review – 19-20/11/2001 Gas Monitors for Transverse Distribution Studies in the LHC LHC Instrumentation Review Workshop.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
Gain stability and the LYSO beam radiation monitor measurements
IEEE NSS 2007 D.Kramer 1 Very High Radiation Detector for the LHC BLM System based on Secondary Electron Emission Daniel Kramer, Eva Barbara.
LHC Beam Loss Monitors, B.Dehning 1/15 LHC Beam loss Monitors Loss monitor specifications Radiation tolerant Electronics Ionisation chamber development.
Overview Consolidation projects for PS LIU-PS Main observable review Conclusion Acknowledgements S. Gilardoni R. Steerenberg G. Metral H. Damerau BI colleagues.
Secondary Emission Monitor for very high radiation areas of LHC Daniel Kramer for the BLM team.
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
LHC Radiation Day, B. Dehning1 Beam Loss Monitors B. Dehning.
NUMI Primary Beam Review August 14, 2001 NUMI PRIMARY BEAM INSTRUMENTATION Multiwires, Loss Monitors, Toroids Gianni Tassotto.
05/12/2014 Gerrit Jan Focker, BE/BI/PM 1 PSB-Injection H - and H 0 Dump detectors and Stripping Foil current measurement.
Siena, May A.Tonazzo –Performance of ATLAS MDT chambers /1 Performance of BIL tracking chambers for the ATLAS muon spectrometer A.Baroncelli,
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
NMLTA Protection System Update -Loss Monitors- Arden Warner September 2 nd, 2009.
BRAN at IR2 and IR8: status, commissioning and operation Enrico Bravin AB-BI Joint LHC Machine-Experiments Workshop on Very Forward Detectors 25 January.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
Requirements from BI and new instruments after LS1 LHC Optics Measurement and Correction Review; B.Dehning 1 Bernd Dehning CERN BE/BI
Front End. Charge pre-amp and detector Voltage regulator. TOP side. Detector linear voltage regulator BOTTOM side. Charge pre-amp.
BEAM LOSS MONITORING SYSTEM
BI-day 2014, The SEM-grid renovation project Michel Duraffourg
Dr: Mohamed Afifi By Lecturer Radiological Science
Injectors BLM system: PS Ring installation at EYETS
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
Ewald Effinger, Bernd Dehning
Status of the MOPOS BI TB – 26th June 2014.
CMS EMU TRIGGER ELECTRONICS
BCTW calibration status and future
Beam Loss Monitor System Reliability and False Signals
EMC Electronics and Trigger Review and Trigger Plan
LHC BLM system: system overview
BEAM LOSS MONITORING SYSTEM
External Review on LHC Machine Protection, B.Dehning
CONSOLIDATION CPS-BL SYSTEM
Steps towards beam commissioning: Photon Diagnostics
CONSOLIDATION CPS-BL SYSTEM
Beam loss monitoring requirements and system description
Beam Tests of Ionization Chambers for the NuMI Neutrino Beam Monitoring System MINOS.
Use of Beam Loss Monitor type detectors in CNGS muon station
Proton Beam Diagnostics
J. Emery, B. Dehning, E. Effinger, G. Ferioli, C
BESIII EMC electronics
C.Octavio Domínguez, Humberto Maury Cuna
Sensitivity tests of BLM_S chamber in PSB dump
Report on Beam Loss Monitors
Variable distance from beam.
Scintillator HCal Prototype
PS-Booster Measurements for the LHC -BLM October 2002
quadEM: New Beam Position Monitor & Electrometer Hardware and Software
LHC BIF test setup - update
Presentation transcript:

Status of muon monitor R&D and construction Specification Detector support structure Ionisation chambers Acquisition system

Functional specification Goal, monitoring of: muon intensity muon beam profile shape muon beam profile centorioid Dynamic range: 105 Muon intensity: 7.7x107 per cm2 and 10.5 ms Pulse duration: two pulses of: length 10.5 ms separated by 50 ms Accuracies: absolute 10 % relative 3 % reproducibility: - cycle to cycle 1 % - one year 5 % x 10 5 -2 -1 1 2 1.0 2.0 3.0 4.0 r (m) 2nd muon pit

Ionisation Chamber Calibration and Support Structure Fixed chamber mounted on cross shaped structure (AL) Movable chamber behind fixed monitors for relative calibration Design finished Start of Production 06/2004 Movement by stepping motors (no resolvers) Motor driver standard SPS (MIDI) installed in UA 87 (distance 500 m) (available) Interface to network via ionisation chamber acquisition system (RS232) Cables ordered Front end software driver available Stainless and AL Beam Steel

Visual Inspection of Structure Camera 5 m upstream Radiation hard camera (tubes) (available) Standard SPS TV system installation located in UA 87 (distance 500 m ) (available) TV frame transmission via Ethernet Cables ordered Front end software driver available Observation Camera

Ionisation chamber LHC design Parallel electrodes separated by 0.5 cm Stainless steel cylinder Al electrodes Low path filter at the HV input N2 gas filling at 100 mbar over pressure Start of production in 2004 diameter = 8.9 cm, length 60 cm, 1.5 litre

Ionisation Chamber Test in Proton Beam BOOSTER Chamber beam response Chamber current vs beam current slength proton= 50 ns Intensity discrepancy by a factor two FWHMe-= 150 ns Measurements with SPS extracted beam foreseen for 2004 (absolute calibration) Intensity density: - Booster 6 109 prot./cm2 - first pit 8 107 muon/cm2

Principle Schematic of Current Integrator SPS design (about 10 years in operation) Low bias current input amplifier (< 100 fA) Reset with switch across feedback capacitor Gain switched: C1 and C2 (1, 200) Amplifier (1, 4, … 128) Digitalisation by 12 bit ADC

Acquisition Electronics 1 VME crate for acquisition Crate CPU: PowerPC Timing by TG8 module Integrators on 8 channel card 5 cards for whole set up Hardware set up and software driver are available

Ionisation Chamber and Electronics Tests SPS (I) SPS system: Ionisation chambers with parallel electronic geometry (0.5 cm separation) Electronics in surface buildings with a analog signal transmission of about 1.5 km Operation time: chambers over 20 years electronics 10 years Total received dose: ring 0.1 to 1 kGy/year extr 0.1 to 10 MGy/year muon Test method: Chamber gas ionised with Cs source Observation of created charges with installed electronics (about 180 chambers)

Ionisation Chamber and Electronics Tests SPS (II) SPS Results: Relative variation between: successive acquisitions (cycle to cycle reproducibility 0.01) Ds/s < 0.005 between different monitors (relative accuracy 0.03, year to year reproducibility 0.05) Ds/s < 0.01 (for ring BLMs) Ds/s < 0.05 (for Extr., inj. BLMs) Total dose in muon pit 1: peak 45 kGy/year

Summary Support structure could be ready for installation in 2004 Motorisation available and ready for installation Observation camera setups available and ready for installation Ionisation chambers start of production in 2004 installation in 2005 Ionisation chamber time response match specification Ionisation chamber linearity to be tested at muon intensity density in 2004 Data acquisition system available and ready for installation SPS ionisation chamber tests show high relative accuracy and long term stability of system