POWER SYSTEM ENGINEERING

Slides:



Advertisements
Similar presentations
ENERGY CONVERSION ONE (Course 25741)
Advertisements

Electrical Installation
Chapter 12 Transformers. Chapter 12 Transformers.
Submitted by: Name:Rajendra Kumar Choudhury Branch:Electrical Engg.
During fault behavior of circuit breaker
Advanced Power Protection Lecture No.2
GENERATOR PROTECTION.
Power System Analysis/ Power System 1 EEE 4113/ EEE 3131
Announcements Be reading Chapter 3
Generator Protection. Amount of Protection Rated power of the generator Ratio of its capacity to the total capacity of the system Configuration of the.
Transformers.
Substations. Substations Chapter 4 Substations Major types of equipment found in most transmission and distribution substations with their purpose,
Chapter 7 SYSTEM PROTECTION
Chapter 2 Transformers.
POWER SYSTEM PROTECTION
Connections of a CT and a PT to supply, load and relay.
TESTING AND COMMISIONING
Need for protection Power system must be kept in operation continuously without major breakdowns This can be achieved in two ways: 1.Implement a system.
Induction Machine The machines are called induction machines because of the rotor voltage which produces the rotor current and the rotor magnetic field.
Protection & Switchgear
EET 221 Synchronous Machines Rafiqi.
Transformer Protection Over-current protection in the form of fuses may be the only protection provided to a small 100 kVA, 11 kV/440 V distribution transformer.
Magnetic field due to an electric current
Introduction to switchgears
BASIC ELECTRICAL TECHNOLOGY DET 211/3
Protection of Power Systems
Protection of Power Systems
SYNERGY INSTITUTE OF ENGINEERING AND TECHNOLOGY
D.C. Machine & Transformer Topic: Instrument Transformer Electrical:-1 presented by: Jill Chauhan ( ) Chirag Agarawal ( )
1 :. Introduction These are special type of transformers used for the measurement of voltage, current, power and energy. As the name suggests, these transformers.
 The figure below shows a protection system for a transmission line, consisting of a CT, PT, a relay and its associated circuit breaker.
Protection of Power Systems
Part Three – Relay Input Sources
Transformers. Single Phase Transformers Principles of Operation – Single Phase.
HNC/D Engineering Science
SYNCHRONOUS GENERATOR
ELECTRICAL MACHINES Electrical Machines.
Protection and Relay Schemes
TRANSDUCERS PRESENTATION BY: Dr.Mohammed Abdulrazzaq
TRANSFORMERS.
Sub Station.
Protection of Power Systems
Chapter Electromechanical Systems 6. Chapter Electromechanical Systems 6.
Electric Motors and Generators
ECE 476 POWER SYSTEM ANALYSIS
Testing of Transformers
Electric Machine Induction Motor
Protection of Power Systems
Electric Machine Introduction
Electrical Machine-I EE 2107 Dr. Md. Sherajul Islam
Transformers. Transformer An A.C. device used to change high voltage low current A.C. into low voltage high current A.C. and vice-versa without changing.
Chapter 7 System Protection
Advanced Power Systems
Electromechanical Systems
UNIT II APPARATUS PROTECTION.
ELECTRICAL POWER-II Electrical engineering sixth semester
Lesson 11: Transformer Name Plate Data and Connections
Overcurrent Protection— Fuses and Circuit Breakers
Agenda Introduction of Protective Relays
EET 323 – Electrical System Design Lecture 9: Grounding
Power System Protective Relaying-Part One
EET 503 Power System Protection (Instrument transformer )
POWER SYSTEM COMMISSIONING AND MAINTENANCE PRACTICE
DC Motors Starters and Breaking Methods
Chapter 33 Transformer: Three Phase. Chapter 33 Transformer: Three Phase.
POWER SYSTEM COMMISSIONING AND MAINTENANCE PRACTICE
Presentation transcript:

POWER SYSTEM ENGINEERING EET 301/4 EET301 POWER SYSTEM ENGINEERING

PROTECTION IN POWER SYSTEM CHAPTER 7 PROTECTION IN POWER SYSTEM EET301 POWER SYSTEM ENGINEERING

On completion of this lesson, a student should be able to: Ability to explain and evaluate symmetrical fault and protection in power system EET301 POWER SYSTEM ENGINEERING

TOPIC OUTLINE 7.1 Introduction 7.2 Basic Components of Protection System 7.3 The Concept of Protection System 7.4 Fuse 7.5 Computer Relaying 7.6 Zone of Protection EET301 POWER SYSTEM ENGINEERING

INTRODUCTION EET301 POWER SYSTEM ENGINEERING

7.1 INTRODUCTION The primary function of a protection system in an electrical power network is to ensure the continuity of the electricity supply. To achieve this, the protection system must be able to: Detect the abnormal condition in an electrical circuit or piece of equipment Identify the location of the fault Isolate the faulty section of the circuit or the faulty equipment only without the electricity supply to the rest of the network. EET301 POWER SYSTEM ENGINEERING

INTRODUCTION Requirements To Protective System Provide For Basis To Design Criteria Reliability: Operate dependably when fault conditions occur, even after remaining idle for months or years. Failure to do so may result in costly damages. Speed: Operate rapidly to minimize fault duration and equipment damage. Any intentional time delays should be precise. Selectivity: A relay system should provide maximum possible service continuity with minimum system disconnection. Simplicity: Minimize protection equipment and circuitry. Economy: Provide maximum protection at minimum cost. EET301 POWER SYSTEM ENGINEERING

BASIC COMPONENTS OF PROTECTION SYSTEM EET301 POWER SYSTEM ENGINEERING

7.2 BASIC COMPONENTS Protection systems have 3 basic components: Instrument transformers Protective Relays Circuit breakers A simple overcurrent protection schematic with: (1) one type of instrument transformer—the current transformer (CT), (2) An overcurrent relay (OC), and (3) a circuit breaker (CB) for a single-phase line. Figure 1: Overrcurrent Protection Schematic EET301 POWER SYSTEM ENGINEERING

EET 102 ELECTRIC CIRCUIT II

BASIC COMPONENTS 7.2.1 Instruments Transformer In general, there are 2 basic types of instruments transformers: Current Transformer (CT) Voltage Transformer (Potential Transformer) (VT) Figure 2 shows a schematic representation for the VT and CT. The transformer primary is connected to or into the power system and is insulated for the power system voltage. The VT reduces the primary voltage and the CT reduces the primary current to much lower, standardized levels suitable for operation of relays. EET301 POWER SYSTEM ENGINEERING

BASIC COMPONENTS Figure 2: VT and CT Schematic EET301 POWER SYSTEM ENGINEERING

BASIC COMPONENTS Currents Transformer (CT) For small currents at low voltage, trip coils and ammeter can be connected directly into the current, for example in series with the load. However, series connection is not practical for HV systems and for larger currents, for example 100A and above. Current transformers are used as a link between the main circuit and the protection or measuring equipment. EET301 POWER SYSTEM ENGINEERING

BASIC COMPONENTS The function of the CT is to reproduce in its secondary winding a current I’ that is proportional to the primary current I. The CT converts primary currents in the kilo ampere range to secondary currents in the 0-5 ampere range for convenience of measurement, with the following advantages. Safety: Instrument transformers provide electrical isolation from the power system so that personnel working with relays will work in a safer environment. Economy: Lower-level relay inputs enable relays to be smaller, simpler and less expensive. Accuracy: Instrument transformers accurately reproduce power system currents and voltages over wide operating ranges. EET301 POWER SYSTEM ENGINEERING

BASIC COMPONENTS Currents transformers are divided into 2 main types:- Protection currents transformer Measuring current transformer The main parameters that define a current transformer are:- Rated Primary Current: The maximum primary current that the transformer has been designed, for example the maximum current at which it can still comply with the relevant standard specifications. Rated Secondary Current: The maximum secondary current that transformer has been designed for. The values are usually 1 A or 5 A . Burden (in VA):The maximum load which can be connected to secondary of the transformer. Accuracy class: The designation given to a current transformer that complies with the error limits specified in the standards specification. EET301 POWER SYSTEM ENGINEERING

BASIC COMPONENTS Accuracy class In BS 3938: 1973, measuring CTs are divided into 5P of 10P. A CT marked “5P20” indicates that this is a protection CT with composite error of 5% which is applicable for currents up to 20 times the rated current. Special purpose CT are designated as Class X. Example: A CT with a specification of 800/5A, 15 VA, Class 0.5, means that the rated primary current is 800A, the secondary current is 5A (when primary is 800A), the burden is 15 VA, and it is a measuring CTs with a current ratio error of 5% at the rated current. EET301 POWER SYSTEM ENGINEERING

BASIC COMPONENTS Currents transformer used in distribution system have a single-turn primary windings and multi-turn secondary windings The 2 most common types of current transformer are: The primary winding is a straight copper bar (round or rectangular) the secondary windings is wound round this bar. A round iron core which the secondary winding is wound. Also known as a ring CTs. This types usually used extensively in the low voltage systems. EET301 POWER SYSTEM ENGINEERING

CURRENT TRANSFORMER EET301 POWER SYSTEM ENGINEERING

BASIC COMPONENTS Current Ratios Table 1: Standard CT Ratios 50:5 100:5 150:5 200:5 250:5 300:5 400:5 450:5 500:5 600:5 800:5 900:5 1000:5 1200:5 1500:5 1600:5 2000:5 2400:5 2500:5 3000:5 3200:5 4000:5 5000:5 6000:5 EET301 POWER SYSTEM ENGINEERING

BASIC COMPONENTS Ideally, the CT secondary is connected to a current- sensing device with zero impedance, such that the entire CTs secondary current flows through the sensing device. In practice, the secondary current divides, with most flowing through the low-impedance sensing device and some flowing through the CT shunt excitation impedance. CT excitation impedance is kept high in order to minimize excitation current. An approximate equivalent circuit of a CT is shown in Figure 3, where:- Z' = CT secondary leakage impedance Xe = (Saturable) CT excitation reactance ZB = Impedance of terminating device (relay, including leads) EET301 POWER SYSTEM ENGINEERING

BASIC COMPONENTS Figure 3: Current Transformer Equivalent Circuits EET301 POWER SYSTEM ENGINEERING

BASIC COMPONENTS Determine Current Transformer Performance The following procedure can be used to determine CT performance. Step 1 : Assume a CT secondary output current I’ Step 2: Compute E’=(Z’+ZB) I’ Step 3: Using E’, Find Ie from the excitation curve Step 4: Compute I = n(I’+ Ie) , note: n=CTs ratio Step 5: Repeat step 1-4 for different value of I’, then plot I’ versus I EET301 POWER SYSTEM ENGINEERING

BASIC COMPONENTS CT Error CT error is the percentage difference between (I’+ Ie) and I’. Where, Ie=CT Secondary excitation current I’=CT Secondary output current EET301 POWER SYSTEM ENGINEERING

EXAMPLE 7.1 Evaluate the performance of the multi-ratio CT in Figure 3 with a 100:5 CT ratio, for the following secondary output currents and burdens: I’ = 5 A and ZB = 0.5 ohm. I’ = 8 A and ZB = 0.8 ohm. I’ = 15 A and ZB = 1.5 ohm. Figure 3: Current Transformer Equivalent Circuits EET301 POWER SYSTEM ENGINEERING

EXAMPLE 7.1 Figure 4: Excitation curve for a multi-ratio bushing CT EET301 POWER SYSTEM ENGINEERING

SOLUTION (a) STEP 1: I’ = 5 A STEP 2: From Figure 4, E’ = (Z’ + ZB)I’ = (0.082 + 0.5)(5) = 2.91 V   STEP 3: From Figure 4, Ie = 0.25 A STEP 4: I = n (I’ + Ie) = (100/5) (5+0.25) = 105 A CT error = 0.25/5.25 x 100% = 4.8%. EET301 POWER SYSTEM ENGINEERING

SOLUTION Figure 4: Excitation curve for a multi-ratio bushing CT EET301 POWER SYSTEM ENGINEERING

SOLUTION (b) STEP 1: I’ = 8 A STEP 2: From Figure 4, E’ = (Z’ + ZB)I’ = (0.082 + 0.8)(8) = 7.06 V   STEP 3: From Figure 4, Ie = 0.4 A STEP 4: I = n (I’ + Ie) = (100/5) (8+0.4) = 168 A CT error = 0.4/8.4 x 100% = 4.8%. EET301 POWER SYSTEM ENGINEERING

SOLUTION Figure 4: Excitation curve for a multi-ratio bushing CT EET301 POWER SYSTEM ENGINEERING

SOLUTION (c) STEP 1: I’ = 15 A STEP 2: From Figure 4, E’ = (Z’ + ZB)I’ = (0.082 + 1.5)(15) = 23.73 V   STEP 3: From Figure 4, Ie = 5 A STEP 4: I = n (I’ + Ie) = (100/5) (15+5) = 400 A CT error = 20/35 x 100% = 57.1%. EET301 POWER SYSTEM ENGINEERING

SOLUTION Figure 4: Excitation curve for a multi-ratio bushing CT EET301 POWER SYSTEM ENGINEERING

SOLUTION Note that for the 15 A secondary current in (c), high CT saturation causes a large CT error of 57.1%. Standard practice is to select a CT ratio to give little less than 5-A secondary output current at maximum normal load. From (a), the 100:5 CT ratio and 0.5 ohm burden are suitable for a maximum primary load current of about 100 A.   EET301 POWER SYSTEM ENGINEERING

EXAMPLE 7.2 An overcurrent relay set to operate at 8 A is connected to the multiratio CT with a 100:5 CT ratio. Will the relay detect a 200 A primary fault current if the burden ZB is 0.8 ohm 3 ohm  EET301 POWER SYSTEM ENGINEERING

BASIC COMPONENTS Voltage Transformer (VT) It is not practical to manufacture meters and indicating lamps for direct operation on 3.3 kV, 6.6 kV, 22 kV or higher voltages. Voltage transformer that steps down the high voltages to working voltages for example 120 V, 240 V and 415 V are used. The are 2 types of voltage transformer :- Protection transformer Measuring transformer EET301 POWER SYSTEM ENGINEERING

BASIC COMPONENTS The variation of voltage is a electricity network usually very small (5%) so the operating range of a measuring voltage transformer is small compare with that of a measuring. However, if a fault occurs, the voltage drops to a very low value. Protection VT must be able to operate over a wide range from as low as 5% to 190% of the rated voltage. (Alternatively, a separate battery power supply unit is used for supply power to the protection system/gear – the voltage is normally 30V d.c) EET301 POWER SYSTEM ENGINEERING

BASIC COMPONENTS There are 2 types of construction for voltage transformer:- Electromagnetic transformers with primary and secondary windings. It is impregnated with synthetic resin. Normally used up to 66 kV. Capacitor VT which uses two capacitors in a voltage divider arrangement. The voltage across one of the capacitor connected to the primary of an auxiliary of an auxiliary wound-type transformer. The required voltage for the protection or measuring device is taken from the secondary of this auxiliary transformer. EET301 POWER SYSTEM ENGINEERING

VOLTAGE TRANSFORMER EET301 POWER SYSTEM ENGINEERING

BASIC COMPONENTS 7.2.2 Protective Relays The function of the relay is to discriminate between normal operation and fault conditions. The OC relay in Figure 1 has an operating coil which is connected to the CT secondary winding, and a set of contacts. When |I’| exceeds a specified "pickup" value, the operating coil causes the normally open contacts to close. When the relay contacts close, the trip coil of the circuit breaker is energized, which then causes the circuit breaker to open. EET301 POWER SYSTEM ENGINEERING

BASIC COMPONENTS Class of Measuring Relays Current relay: Operate at predetermined threshold value of current. Voltage relay: Operate at predetermined threshold value of voltage. Power relay: Operate at predetermined threshold value of power. Directional relay: Alternating current: Operate according to the phase relationship between alternating quantities. Direct current: Operate according to the direction of the current and are usually of the permanent-magnetic, moving-coil pattern EET301 POWER SYSTEM ENGINEERING

BASIC COMPONENTS Frequency relays: Operate at a predetermined frequency. These include over frequency and under frequency relays. Temperature relays: Operate at a predetermined temperature in the protected component. Differential relays: Operate according to the scalar or vectorial difference between two quantities such as current, voltage, etc. Distance relays: Operate according to the "distance" between the relay's current transformer and the fault. The "distance" is measured in terms of resistance, reactance, or impedance. EET301 POWER SYSTEM ENGINEERING

BASIC COMPONENTS Electromechanical and Induction Disc Relays Two types of electromagnetic attraction type of relay are: The plunger unit. It has cylindrical coils with an external magnetic structure and a center plunger. The plunger moves upward to operate a set of contacts when the current or voltage applied to the coil exceeds a certain value. The clapper unit. It has a U-shaped magnetic frame with a movable armature across the open end. The armature is hinged at one side and spring-restrained at the other. EET301 POWER SYSTEM ENGINEERING

BASIC COMPONENTS When the electrical coil is energized, the armature moves toward the magnetic core, opening or closing a set of contacts with a torque proportional to the square of the coil current. Induction disc relay Induction disc units are based on the watt-hour meter design and use the same operating principles. They operate by torque resulting from the interaction of fluxes produced by an electromagnet with those from induced currents in the plane of a rotatable aluminum disc. EET301 POWER SYSTEM ENGINEERING

Figure 7: Induction Disc Type Relay Unit. BASIC COMPONENTS IS I Magnet plugs Keeper Main coil Disc Electromagnet ф .фL .фR Figure 5: Electromagnet Plunger type 1 2 3 4 5 6 magnetic core armature relay coil spring moving contact Bridge normally open relay contact Figure 7: Induction Disc Type Relay Unit. Figure 6: Electromagnet clapper type EET301 POWER SYSTEM ENGINEERING

Induction Disc Relay This relay Inverse Definite Minimum Time (IDMT). The operating characteristic of a standard IDMT relay is defined as: TMS – time multiplier setting PSM – plug setting multiplier I – measured current Is – relay setting current EET301 POWER SYSTEM ENGINEERING

Induction Disc Relay Example: Determine the time of operation of a 1 A, 3 s overcurrent relay having a Plug Setting of 125% and a Time Multiplier of 0.6. The supplying CT is rated 400:1 A and the fault current is 4000 A. Solution the relay coil current for the fault The nominal relay coil current EET301 POWER SYSTEM ENGINEERING

Induction Disc Relay The plug setting multiplier the time of operation EET301 POWER SYSTEM ENGINEERING

BASIC COMPONENTS 7.2.3 Circuit Breaker (CB) CB is a reusable device that may be rest after operation. It set to protect circuit and equipment from over current resulting from overloads and short circuits. Electrically, CB connected in series with the load and carry load current under normal condition. Have three operation condition ON (Contact closed) allowing, load current to flow through breaker, OFF (Contact open) breaker contact open , circuit is deernergized and TRIPPED ( Contact open need reset) when overcurrent and overload occur or by the operation of the shunt trip on under voltage. EET301 POWER SYSTEM ENGINEERING

Figure 8: Circuit breaker trip mechanisms. BASIC COMPONENTS Bimetal Current in Latch Spring Current out Normal Tripped Circuit breaker contacts A. Thermal Normal Current out Current in Latch Spring Armature Tripped Circuit breaker contacts Electromagnetic coil Electromagnetic coil B. Magnetic Figure 8: Circuit breaker trip mechanisms. EET301 POWER SYSTEM ENGINEERING

THE CONCEPT OF PROTECTION SYSTEM EET301 POWER SYSTEM ENGINEERING

7.3.1 TRANSFORMER PROTECTION A number of fault conditions can arise within a power transformer. Earth fault Core faults Inter turn faults Phase to phase faults Tank fault In addition to the fault condition cause stresses on the transformer, such as overloading, system faults , over voltages and under frequency operation EET301 POWER SYSTEM ENGINEERING

TRANSFORMER PROTECTION High impedance relay I im1 im2 im2 – im1 PROTECTED APPARATUS Relay Basic Differential Connections. Restricted Ground Fault Protection for a Y winding. Main scheme use for transformer. The main principle , the current at each side of protected apparatus for each phase are compared in differential relay. Any difference current will operate the relay. The sum of the phase currents is balanced against the neutral current, hence the relay will not respond to fault outside the winding. EET301 POWER SYSTEM ENGINEERING

TRANSFORMER PROTECTION Number of considerations should be dealt with in applying differential protection including:- I im1 im2 im2 – im1 PROTECTED APPARATUS Relay Transformer ratio The CT should have rating to match the rated currents of the transformer winding which they are applied. The current transformer should be connected in Y for ∆ winding and ∆ for Y winding ( see next figure) Allowance should be made for taping changing by providing restraining coil. Figure 9: Basic Differential Connections. EET301 POWER SYSTEM ENGINEERING

TRANSFORMER PROTECTION C. T.’s Circuit Breaker Power transformer Phase A Phase B Phase C R o A B C Relay Example of Differential Protection of a Δ/Y transformer. EET301 POWER SYSTEM ENGINEERING

EXAMPLE 7.3 Consider a Δ/Y connected, 20 MVA, 33/11 kV transformer with differential protection applied, for the current transformer ratios shown in Figure 10. Calculate the relay currents on full load. Find the minimum relay current setting to allow 125 percent overload. Figure 10 EET301 POWER SYSTEM ENGINEERING

SOLUTION The primary line current is given by The secondary line current is EET301 POWER SYSTEM ENGINEERING

SOLUTION The C.T. current on the primary side is thus The C.T. current in the secondary side is Note that we multiply by to obtain the values on the line side of the Δ connected C.T.’s. The relay current on normal load is therefore With 1.25 overload ratio, the relay setting should be EET301 POWER SYSTEM ENGINEERING

TRANSFORMER PROTECTION Buchholz Protection it is common practice in transformer protection to employ gas-actuated relays for alarm and tripping. One such a relay is the Buchholz relay. Faults within a transformer will result in heating and decomposing of the oil in the transformer tank. The decomposition produces gases such as hydrogen, carbon monoxide, and light hydrocarbons, which are released slowly for minor faults and rapidly for severe arcing faults. In the gas activated relay named after its inventor, this phenomenon is utilized. EET301 POWER SYSTEM ENGINEERING

TRANSFORMER PROTECTION The relay is connected into the pipe leading to the conservator tank. As the gas accumulates, the oil level falls and a float F is lowered and operates a mercury switch to sound an alarm. Sampling the gas and performing a chemical analysis provide a means for classifying the types of fault. EET301 POWER SYSTEM ENGINEERING

TRANSFORMER PROTECTION Buchholz protection provides an alarm for a number of fault conditions including: Inter turn faults or winding faults involving only lower power levels. Core hot spots due to short circuits on the lamination insulation. Faulty joints. Core bolt insulation failure. Major faults resulting in tripping include severe earth or inter phase winding faults and loss of oil through leakage. EET301 POWER SYSTEM ENGINEERING

7.3.2 BUSBAR PROTECTION Bus bars are an essential link in the electric power system, and short circuits in their zone have to be interrupted in the shortest possible time. In distribution systems (6-20 kV) with supply through transformers, overcurrent time-relays provide an easy protection mechanism. The relays interrupt the supply to the bus bars if one or more supplies conducting a fault current. Power direction relays are used in the transformer supply side to respond to a fault at the bus bars. EET301 POWER SYSTEM ENGINEERING

BUSBAR PROTECTION Differential protection is the most reliable method of protection for bus bars. EET301 POWER SYSTEM ENGINEERING

7.3.3 GENERATOR PROTECTION There are a number of abnormal conditions that may occur with rotating equipment, including: Faults in the windings. Loss of excitation. Motoring of generators. Overload. Overheating. Overspeed. Unbalanced operation. Out-of-step operation. EET301 POWER SYSTEM ENGINEERING

GENERATOR PROTECTION Various types of faults that may occur in the insulation system of a generator's windings. The faults shown are identified as: 1. Interphase short circuit. 2. Interturn fault. 3. Stator earth fault. 4. Rotor earth fault. 5. Interturn fault in rotor. Note that A denotes the insulation of individual windings and B denotes the stator core. EET301 POWER SYSTEM ENGINEERING

GENERATOR PROTECTION Allocation of Protective Devices for the Stator, Rotor and Prime Mover. EET301 POWER SYSTEM ENGINEERING

7.3.4 TRANSMISSION LINE PROTECTION It is necessary to provide the desired selectivity such that relay operation result in the least service interruption while isolating the fault. The excessive currents accompanying a fault are the basis of over current protection scheme. In transmission line protection system, it is necessary to provide the desired selectivity such that relay operation result in the least service interruption while isolating the fault. In transmission line protection scheme, relay coordination is MUST. EET301 POWER SYSTEM ENGINEERING

TRANSMISSION LINE PROTECTION Three methods of relay grading: Current Grading. Time Grading Inverse Time Over Current Relaying CURRENT GRADING Operates at suitable graded current Fault current are higher near the source. Relays are set that decreases as distance from the source is increased. EET301 POWER SYSTEM ENGINEERING

TRANSMISSION LINE PROTECTION Time Grading Ensure the breaker nearest to the fault open first, by choosing an appropriate time setting for each of the relay. Time setting increase as the relay get closer to the source. Inverse Time Over Current Relaying Evolved because of the limitation imposed by the use either current or time alone. Time of operation is inversely proportional to the fault current level. Relays type CO-7 is in common use. EET301 POWER SYSTEM ENGINEERING

TRANSMISSION LINE PROTECTION Inverse Time Over Current Relaying The operating time over current relay varies with the current magnitude. There are two setting for this type of relay: Pick-up current is determined by adjusted current coil tap setting (C.T.S). The pick-up current is the current that causes the relay to operate and close the contacts. Time dial setting (or time multiplier setting) refers to the reset position of moving contact, and it is varies the time of operation at a given tap setting and current magnitude. EET301 POWER SYSTEM ENGINEERING

TRANSMISSION LINE PROTECTION Radial System Protection Many radial systems are protected by time delay overcurrent relays. Adjustable time delays can be selected such that the breaker closest to the fault opens, while other upstream breakers with larger time delays remain closed. That is, relays can be coordinated to operated in sequence so as to interrupt minimum load during faults. Successful relay coordination is obtained when fault currents are much larger than normal load currents Also, coordination of overcurrent relays usually limits the maximum number of breakers in a radial system to five or less, otherwise the relay closet to the source may have an excessive time delay EET301 POWER SYSTEM ENGINEERING

TRANSMISSION LINE PROTECTION Consider a fault at P1 to the right of breaker B3 for the radial system of Figure 10. We want breaker B3 to open while B2 and B1 remains closed. Under these condition, only load L3 is interrupted We could select a longer time delay for the relay at B2 so that B3 operates first Thus, for any fault to the right of B3, B3 provides primary protection If B3 fails to open, B2 will open after time delay, thus providing backup protection EET301 POWER SYSTEM ENGINEERING Figure 10

TRANSMISSION LINE PROTECTION Similarly, consider a fault at P2, we want B2 to open while B1 remains closed Under these conditions, loads L2 and L3 are interrupted Since the fault is closer to the source, the fault current will be larger than for the previous fault considered We also select the B1 relay with a longer time delay than B2, so that B2 opens first. Thus, B2 provides primary protection for faults between B2 and B3, as well as back up protection for faults to the right of B3. EET301 POWER SYSTEM ENGINEERING Figure 10

TRANSMISSION LINE PROTECTION Similarly, B1 provides primary protection for faults between B1 and B2, as well as back up protection for further downstream faults The coordination time interval is the time interval between the primary and remote backup protective devices It is the different between the time that the backup relaying operates and the time that circuit breakers clear the fault under primary relaying Typical time interval between 0.2 to 0.5 seconds are selected to account in most practical applications EET301 POWER SYSTEM ENGINEERING Figure 10

EXAMPLE 7.4 The CO-8 relay with a current tap setting of 6 amperes and time dial setting of 1 is used with the 100:5 CT in Example 7.1. Determine the relay operating time for each case. Solution: From example 7.1(a) The relay does not operate. It remains in the blocking position. EET301 POWER SYSTEM ENGINEERING

SOLUTION b) Using curve 1 in Figure 11, toperating = 6 seconds c) From curve 1, toperating = 1.2 seconds EET301 POWER SYSTEM ENGINEERING

Figure 11: CO-8 time delay overcurrent relay characteristic EET301 POWER SYSTEM ENGINEERING

EXAMPLE 7.5 An 11 kV, 50 Hz radial system is shown in Figure 12. Assuming a CO-7 relay with relay characteristic given in Figure 13 and the same power factor for all loads, select relay settings to protect the system with coordination time interval 0.3 seconds. Figure 12 EET301 POWER SYSTEM ENGINEERING

EET301 POWER SYSTEM ENGINEERING Figure 13

SOLUTION The load currents are calculated as The normal current through the sections are then given by EET301 POWER SYSTEM ENGINEERING

SOLUTION With the given CT ratios, the normal relay currents are Now obtain C.T.S. (currents tap setting) or pick up current in such a way that the relay does not trip under normal currents.  For this type of relay, C.T.S. available are 4, 5, 6, 7, 8, 10 and 12 A. EET301 POWER SYSTEM ENGINEERING

SOLUTION Choosing the nearest setting higher than the normal current For position 1, the normal current in the relay is 5.25 A, so choose C.T.S.1 = 6 A For position 2, the normal current in the relay is 8.53 A, so choose C.T.S.2 = 10 A For position 3, the normal current in the relay is 8.69 A, so choose C.T.S.3 = 10 A EET301 POWER SYSTEM ENGINEERING

SOLUTION Next, select the intentional delay indicated by TDS (Time Dial Setting). Utilize the short circuit currents to coordinate the relays The current in the relay at 1 on short circuit is Expressed as a pick up value Choose the lowest TDS for this relay for fastest action. Thus, TDS1 = ½ EET301 POWER SYSTEM ENGINEERING

SOLUTION Referring to the relay characteristic, for TDS1 = ½ and 10.42 ratio, the operating time for the relay 1 for a fault at 1 is obtained as T11 = 0.15 s. To set the relay at 2 responding to a fault at 1, allow breaker operating time, Tbreaker = 5cycle x 1/50Hz = 0.1 s. With coordination time 0.3 seconds, thus primary protection to clear this fault T21 = T11+Tbreaker+Tcoordination = 0.15 + 0.1 + 0.3 = 0.55 s EET301 POWER SYSTEM ENGINEERING

SOLUTION Short circuit for a fault at 1 as a multiple of the CTs at 2 is From the characteristics for 0.55 s operating time and 6.25 ratio, TDS2 = 2 Now setting the relay at 3 For a fault at bus 2, the short circuit current is 3000 A, for which relay 2 responds in a time T22 calculated as EET301 POWER SYSTEM ENGINEERING

T32 = T22 + Tbreaker + Tcoordination = 0.5 + 0.1 + 0.3 = 0.9 s SOLUTION For TDS2 = 2 and 7.5 ratio, from relay characteristic, T22 = 0.5 s Allowing the same margin for relay 3 to respond for a fault at 2, as for relay 2 responding to a fault at 1, T32 = T22 + Tbreaker + Tcoordination = 0.5 + 0.1 + 0.3 = 0.9 s The current in the relay expressed as a multiple of pickup is Thus, for T3 = 0.9 s and 3.75 ratio, from the relay characteristic TDS3 = 2.5 EET301 POWER SYSTEM ENGINEERING

Jumaat EET 102 ELECTRIC CIRCUIT II

FUSE EET301 POWER SYSTEM ENGINEERING

7.4 FUSE Fuse is a device connected in series with the conductors that caries the full load current supplied to the load. Under the normal condition, the load current is less than the ampere rating of the fuse, and the fuse remain intact to connect the load to the source. When overload or short circuit occurs, the current through link will also increase. Once the link totally melted, an open circuit exist in the fuse, an open circuit exist and the circuit will remain open. Then it must be replaced. Fuse are “one time” device. EET301 POWER SYSTEM ENGINEERING

FUSE Reduced area of link Filler material Short circuit element Trigger spring Connector C. Current Limiting Time Delay Fuse A. Non-Current Limiting , Non-Time Delay Fuse Filler material B. Current Limiting Non-Time Delay Fuse EET301 POWER SYSTEM ENGINEERING

7.4 FUSE During normal operation, when the fuse is operating below its continuous current rating, the resistance of the link is so low If an overload current occurs and persists for more than a short interval of time, the temperature of the link eventually reaches a level that causes a restricted segment of the link to melt. A gap is then formed and an electric arc is established. As the arc causes the link metal to burn back, the gap width increases. The resistance of the arc eventually reaches such a high level that the arc cannot be sustained and it is extinguished. The current flow within the fuse is then completely cut off. EET301 POWER SYSTEM ENGINEERING

7.4 FUSE EET301 POWER SYSTEM ENGINEERING

7.4 FUSE Fuse specification is normally based on the following four factors. Voltage rating: this rms voltage determines the ability of a fuse to suppress the internal arc that occurs after the fuse link melts. A blown fuse should be able to withstand its voltage rating. Most low voltage fuse have 250 – 600 V rating and medium voltage rating fuse range from 2.4 – 34.5 kV. Continuous current rating: the fuse should carry this rms current indefinitely, without melting and clearing. Interrupting current rating: Is the largest rms asymmetrical current that the fuse can safely interrupt. Standard interrupting rating for medium voltage include 65, 80 and 100 kA. Time response: the melting and clearing time of a fuse depends on the magnitude of the overcurrent and specified by a ‘time-current’ curve. EET301 POWER SYSTEM ENGINEERING

Example A 415 V distribution system is shown in Figure 14. Select the suitable rating of fuse for each load and incoming circuit using fuse time-current characteristic in Figure 15. EET301 POWER SYSTEM ENGINEERING Figure 14

Example EET301 POWER SYSTEM ENGINEERING Figure 15

EET301 POWER SYSTEM ENGINEERING Figure 15

Solution Fuse selection for each circuit Lighting load: select 32 A fuse Heating load: select 50 A fuse EET301 POWER SYSTEM ENGINEERING

Solution Motor load: The motor full load current is The starting current for 10 seconds is 7 time than the full load current, therefore EET301 POWER SYSTEM ENGINEERING

Solution From the time-current curve, an 80 A fuse would withstand 383 A for only 6 seconds. Therefore, for a 100 A fuse, which would withstand 383 A for longer than 10 seconds, would be necessary. To provide discrimination the fuse at incoming circuit must meet the following requirements: It must carry the normal load current: It must carry the load + the starting current of the motor From time-current curve, a 125 A fuse would withstand 452.5 A for more than 10 s. EET301 POWER SYSTEM ENGINEERING

COMPUTER RELAYING EET301 POWER SYSTEM ENGINEERING

7.5 COMPUTER RELAYING The electric power industry has been one of the earliest users of the digital computer as a fundamental aid in the various design and analysis aspects of its activity. There are many perceived benefits of a digital relaying system: Economics: cost effective Reliability: continuously active providing a high level of self-diagnosis. Flexibility: Revisions or modifications made necessary by changing operational conditions System interaction: The availability of digital hardware that monitors continuously the system performance at remote substations. EET301 POWER SYSTEM ENGINEERING

COMPUTER RELAYING Example of Functional Block of Digital Relay EET301 POWER SYSTEM ENGINEERING

ZONE OF PROTECTION EET301 POWER SYSTEM ENGINEERING

7.6 ZONE OF PROTECTION Power system configurations, a fundamental concept is the division of a system into protective zones. If a fault occurs anywhere within a zone, action will be taken to isolate that zone from the rest of the system. Zones are defined for: Generators Transformers Buses Transmission and distribution lines Motors EET301 POWER SYSTEM ENGINEERING

ZONE OF PROTECTION Each zone is defined by a closed, dashed line. As shown in Figure 16, Zone 1 for example, contains a generator and connecting leads to a transformer ,. In some cases a zone may contain more than one component. For example, Zone 3 contains a generator-transformer unit and connecting leads to a bus, and Zone 10 contains a transformer and a line. Protective zones have the following characteristics: Zones are overlapped. Circuit breakers are located in the overlap regions. For a fault anywhere in a zone, all circuit breakers in that zone open to isolate the fault. EET301 POWER SYSTEM ENGINEERING

ZONE OF PROTECTION Figure 16 : Power System Protective Zones EET301 POWER SYSTEM ENGINEERING

END OF CHAPTER 7 EET301 POWER SYSTEM ENGINEERING

T H A N K YOU EET305 POWER SYSTEM FUNDAMENTAL