RAD evolutions workshop 2018

Slides:



Advertisements
Similar presentations
UAS Integration Switzerland Assessment of OAT UAS Integration into ICAO Class C and D Airspace as standard IFR/VFR Flights.
Advertisements

Draft Concept of Operations (CONOPS) for CS#1- FAS Centralised service on Flight Plan and Airport Slot Consistency (FAS) Matthis Birenheide Project Manager.
EUROCONTROL Centralised Services – CS 2 – 4DPP Frank Brenner Director General 3 September 2013.
- European CDM - To benefit from the animation settings contained within this presentation we suggest you view using the slide show option. To start the.
The European Organisation for the Safety of Air Navigation ASM Solutions at Network Level ASM / ATTFCM / ATS Workshop EUROCONTROL HQ September 2012.
NM USER FORUM 2014 Razvan BUCUROIU Head of Operations Planning 30/01/2014 Free Route and Airspace Improvements.
The European Organisation for the Safety of Air Navigation The need for Data sharing Generic Civil-Military Cooperation.
ASM Dimension in Free Route Airspace Catalin Lepadatu EUROCONTROL DNM/COO/NOM/OPL Civil-Military Workshop September 2012.
Free Route Airspace in DK/SE FAB
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
Traffic Management and FUA integration
Peter Matern Head of ADM Unit 30/01/2014
Continuous Climb Operations (CCO) Saulo Da Silva
EUROCONTROL CRDS 22-24/11/2004 ICRAT 1/15 ICRAT 2004, Zilina, November 22-24, 2004 Towards the traffic synchronisation in a Functional Airspace Block Lenka.
Estimating Requirements and Costs of 4D ATM in High Density Terminal Areas Gunnar Schwoch DLR Institute of Flight Guidance Braunschweig, Germany ICNS 2012.
Protection Values for VOR-Defined ATS Routes
Standard Terminal Arrival Routes STARs
International Civil Aviation Organization Collaborative Decision Making (CDM) Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology.
MODEL FOR FLIGHT LEVEL ASSIGNMENT PROBLEM ICRAT International Conference on Research in Air Transportation Alfred Bashllari National & Kapodistrian.
EUROCONTROL EXPERIMENTAL CENTRE1 AIRSPACE CONGESTION: Pre-Tactical Measures and Operational Events ICRAT Conference, Zilina November 22, 2004 Nabil BELOUARDY.
Why Flight Plan and ATFCM adherence?
Review Continuous Descent Operations Manual Roosevelt Pena (Dom Rep)
Study Continuous Climb Operations
Section 03 - Altimetry (cont) Lesson 09
Regional ATFM in Europe
Page Lufthansa ASAS It's Time for a paradigm change... Workshop May 2003, Rome
ASAS FRA OB/T ATM Projects Lufthansa point of view.
EUROCONTROL European Organisation for the Safety of Air Navigation.
Reducing Emissions through Operational Efficiency Capt. Russell Davie Cathay Pacific Airways.
ROUTE CHARGING POLICY FOR A FUNCTIONAL BLOCK OF AIRSPACE (CEATS) 1 st International Conference on Research in Air Transportation ICRAT 2004 Zilina, Slovakia.
1 ILA Berlin - May 2008 Marc Brochard - EEC EPATS ATM General Requirements & relative issues to be solved.
1 Airborne Separation Assistance Systems (ASAS) - Summary of simulations Joint ASAS-TN2/IATA/AEA workshop NLR, Amsterdam, 8 th October 2007 Chris Shaw.
Airspace 1 st LT Zouhar Jakub 12 th September 2014.
ASAS Crossing and Passing Applications in Radar Airspace (operational concept and operational procedure) Jean-Marc Loscos, Bernard Hasquenoph, Claude Chamayou.
Why we need 8,33KHz below FL195? Regulation (EU) No 1079/2012 on VCS-8.33 kHz Bogdan Petricel / Jacky Pouzet Network Manager Luxembourg, March 2015.
FAA Projects High Altitude Airspace Analysis software isa.
RVSM Implementation in Europe
Vertical, lateral separations based on time / distance
Collaborative Decision Making (CDM) Saulo Da Silva
Допълнение 7 на PANS-ATM (ICAO Doc 4444)
Workshop on preparations for ANConf/12 − ASBU methodology
VARIOUS KINDS OF SEPARATION
Free Routing Airspace in Europe
Introduction of TBO within OptiFrame
Workshop on preparations for ANConf/12 − ASBU methodology
Continuous Climb Operations (CCO) Saulo Da Silva
Ensuring a 'Flexible Use of Airspace'….
Delivering NATS ATM CO2 Targets
Giancarlo Buono Nicosia, April 13th 2018
Continuous Climb Operations (CCO) Saulo Da Silva
FUA Restrictions Flight Plan Buffer Zones
Nikola Ivanov, Fedja Netjasov, Radosav Jovanovic
Vertical Evolution during Cruise
IFPS Error Messages in Flight Plan Rejections
2012- ICAO FPL Changes the airline viewpoint Arkady Merkulov IATA
ATM WAC Inter-FAB Panel
Publication specialties and how to flight plan
CFSP’s view on the current RAD
RAD in DFS – information for external stakeholders
SAS & RAD Jens Albek Operative Route Analyst
RAD Evolution Workshop Network Approach to the RAD - DP/4
Traffic Management and FUA integration
4D Trajectory Management
RAD Evolution Workshop Current RAD status
RAD Evolution Workshop Current RAD status - DP/2
RAD Evolution Workshop
RAD Evolution Workshop Outcome
RAD Evolution Workshop
RAD Evolution Workshop Network approach to the RAD - DP/3
Effects of fragmentation on route charges
Presentation transcript:

RAD evolutions workshop 2018 Matthias Loehr Operations & Route Planning 12 DEC 2018

Content Route and Flight Planning (Intra European) Issues with RAD - Vertical Restrictions versus FPL item 15 - Dependent Applicability - Restrictions in FRA stretching over a long distance - Connection FRA/non-FRA RAD a means to improve delay KPI? | RAD evolutions workshop 2018

Route and Flight Planning (Intra European) For all city pairs fixed Company Routes and Fully Optimised Routes Flight Planning is done fully automated without human interaction - Some 12 hours prior STD comparison between all avbl. routings (fixed and optimised) - System automatically selects cheapest route and files FPL with ATC - After filing no system initiated CHG of lateral trajectory (only vertical due to updated ZFM) We are aiming to bring route selection including optimisation closer to STD to benefit from updated upper winds and airspace availability, i.e. rolling UUP. | RAD evolutions workshop 2018

Issues with RAD - Vertical Restrictions versus FPL item 15 RAD restriction requires to be at or below stipulated FL at specific location ICAO states that in item 15 a speed/level group shall be inserted where the level change will be started -> not an issue for restrictions preventing a further climb -> significant problem for restrictions requiring a descent | RAD evolutions workshop 2018

Issues with RAD - Vertical Restrictions versus FPL item 15 Fictitious RAD restriction: MASEK not avbl. Arr EDDV above FL285 CFS calculates FL280 ovhd MASEK with corresponding ToD before MASEK Item 15 shows “… UN851 MASEK/N0430F280 UN851…” -> FPL rejected by IFPS Restriction has to be extended in CFS to one or more waypoints prior MASEK via “trial and error” as IFPS calculates different profile than CFS In FRA this could mean significant negative fuel efficiency (long distance or lateral deviation) NM to consider handling such restrictions in the same manner as closed CDRs | RAD evolutions workshop 2018

Issues with RAD - Dependent Applicability LS2595: LSAGUAC not avbl. Arr LSZH except via a. KINNI UZ67 [LAMUR] when UZ67 is avbl. at all levels (LS TRA xxx) b. KINNI UN871 KORED when UZ67 is not avbl. at all levels (LS TRA xxx) Translated: UN871 KINNI-KORED not avbl. Arr LSZH if CDR1 UZ67 is not closed (LS TRA xxx active) Restriction controls the availability of UN871 KINNI-KORED but it is not attached to this object To enable proper automised flight planning we had to find a workaround | RAD evolutions workshop 2018

Issues with RAD - Dependent Applicability Workaround: Create Company Restricted Area only affecting UN871 Activate CRA when UZ67 is open acc. AUP Deactivate CRA when UZ67 is not open acc. AUP -> Daily human workload -> Only done once on the evening before -> Still some REJ due to UUP | RAD evolutions workshop 2018

Issues with RAD - Restrictions in FRA stretching over a long distance LJLO1021: LJLACTA Not available for traffic 1. via (pt:UTEKA, ANASA) to/from pt:ERKIR except-via (pt:BEDOX, VANAX, MAGAM, GORPA, PODET) 2. […] Great circle Distance UTEKA-ERKIR 487 NM LJLA CTA is part of a large Cross-Border FRA (LD, LJ, LO, LQ and LY) Boundary point LD/LJ normally not required in SECSI FRA | RAD evolutions workshop 2018

Issues with RAD - Restrictions in FRA stretching over a long distance | RAD evolutions workshop 2018

Issues with RAD - Connection FRA/Non-FRA MOBDO DCT SOTOV min FL305 (FRAIT) After SOTOV max FL305 due ED3758 -> how to descend below FL305 prior SOTOV? Workaround: Lowered min FL MOBDO-SOTOV to FL265 Company Restriction on MOBDO-SOTOV “not avbl. below FL305 if not Arr LSZH” Company Restriction on MOBDO-SOTOV “not avbl. above FL305 if Arr LSZH” | RAD evolutions workshop 2018

RAD a means to improve delay KPI? Traffic growth higher than capacity increase in at least some parts of Europe ANSPs struggle to meet their delay KPI and might be subject to penalties This might attract ANSPs to protect their own airspace leaving the delay with their neighbours There appears to be an increasing number of RAD restrictions “to force onto shortest route” AOs struggle to find opportunities to circumnavigate regulated sectors, i.e. forced into already heavily regulated sectors Questions: Is it still appropriate that the RAD is under sole control of the individual states? Should it be the AO’s responsibility to find a routing adequately efficient in or around congested airspace in terms of fuel, time and delay? Would a Network Approach be required to distribute traffic for best overall demand/capacity balance? | RAD evolutions workshop 2018