AEMA Summit 2011 Lesser Slave Lake Regional Wildfire Response and Recovery Brandy Cox Director, Slave Lake Recovery Alberta Municipal Affairs Mark Hoosein.

Slides:



Advertisements
Similar presentations
1 Industry Brief Apr Outline How is Alberta preparing? How is Alberta preparing? Albertas Health Response Albertas Health Response Albertas Operational.
Advertisements

Implementing Your Fixed Amount Grant Peg Rosenberry Director of Grants Management Corporation for National and Community Service.
Putting the Pieces Together to Achieve Sustainability Cindy Carlsson Minnesota Department of Transportation March 1, 2011.
Hurricane Sandy. Sandy was the second-largest Atlantic storm on record Storm surge reached over 13 feet in coastal areas of New York and New Jersey The.
Opening Doors: Federal Strategic Plan to Prevent and End Homelessness
Retooling Transitional Housing
Jackson Community Comprehensive Plan – Big Picture Planning for Natural Resources Keeping it Green: Conserving Your Future Through Land Use Planning Presented.
Galena Recovery Panel 2013 Spring Floods. Panel Members Galena Jon Korta (Local Disaster Recovery Coordinator and City Council Member) March Runner (Tribal.
1 Public Speaking: From Large Audiences to Internal Staff Meetings Rebecca Otto State Auditor NASACT Middle Management Conference April 18, 2013 St. Paul,
How to commence the IT Modernization Process?
City of Miami PROPOSED Fiscal Year 2009 BUDGET. 2 Budget Focus To prepare a structurally balanced general operating budget. To provide a budget, which.
SUSTAINABLE COMMUNITY PLAN - An Introduction Presentation to Planning and Development Committee – February 16,
Economic Crisis Response Program. According to the 2011 MNL Census of Municipalities: 11.7% of small municipalities (fewer than 1000 residents) have economic.
City Council Meeting Agenda Items October 28, 2013.
Detail actions necessary to implement the interim housing mission in the post-disaster environment Identify command and control structures at all levels.
1 Career Opportunities in Local Government. 2 SERVICE DESIRED SERVICE DELIVERY COUNCIL CAO RESIDENTSRESIDENTS STAFF Relationship Model.
Alberta Interagency Council on Homelessness March 20, 2014 Edmonton Police Commission.
Treasury Board Ministry 1 Government Controllership Challenges in Alberta’s Hot Economy September 13, 2007.
Rebuilding in flood hazard areas. Impact of flood Area directly impacted spans 55,000 square kilometres Evacuations of almost 100,000 people 10,000 homes.
2013 BUDGET General Fund Revenues$84,870,998 Expenditures Divisional 69,635,424 Non-Divisional 5,695,509 Transfers 9,540,065 84,870,998 $ Nil * Capital$14,788,522.
A Place to Call Home 10 Year Plan to End Homelessness November 2006.
2014 MUNICIPAL BUDGET. It is the expectation of the Council to develop community driven policy whose intent will be to ensure a safe, clean, secure environment,
Detail Federal Disaster Housing Assistance Programs Identity various interim housing strategies available to local communities Explain wrap around services.
Update Training Meeting
2013 Southern Alberta Flood Disaster Recovery Program
2015 Municipal Budget Overview Borough of Montvale April 14, 2015.
Introduction to Emergency Social Services Presented by: (Your Name) (Your Organization)
Alachua County Post-Disaster Redevelopment Plan Alachua County Board of County Commissioners Meeting April 27, 2010.
Context Report and Long Range Financial Plan Presentation to City Council May 11, 2004 E D M O N T O N.
The Urban Infrastructure Challenge in Canada: Focusing on Housing Affordability and Choice Presentation by CHBA – [Name] to The Municipal Council of [Name]
Tampa Comprehensive Plan Housing Element Affordable Housing Policies.
Role of Alberta Human Services at the POC in support of the delivery of Emergency Social Services ESS Forum
Property of the Township of Madawaska Valley 2015 MUNICIPAL BUDGET.
Office of Infrastructure Investment 1 Jeffrey A. Simon Director of Infrastructure Investment.
State Debris Management Plan California the “Disney Land of Disasters”
PROVIDING SAFE AFFORDABLE HOUSING IS OUR MANDATE. CREATING HOMES IS OUR GOAL. Aboriginal Caucus Day End of Operating Agreements Aboriginal Perspective.
Emergency Response: Preparing for Disasters & Emergency Incidents June 2, 2015 Guest Secured Password: rangers!
Foster and sustain the environmental and economic well being of the coast by linking people, information, and technology. Center Mission Coastal Hazards.
A Conversation with Funders Work Plan & Budget Workshop Toronto Newcomer Office (TNO) & Toronto North LIP (TNLIP) Community Meeting, April 30, 2015.
National Disaster Recovery Framework. National Disaster Recovery Framework Reasons for establishing the Framework Past large-scale recovery efforts revealed.
2008/09 Recommended Budget Washtenaw County Board of Commissioners September 2007.
Ulster C.A.R.E.S. Community Access Through Restructuring of Essential Services Ulster County Executive Mike Hein May 23, 2013.
Homelessness Services in Nipissing District [DNSSAB’s Role] Presentation for the Board of Directors October 10, 2007 Bob Barraclough, Director of Operations.
PROJECT PARTNERS Catholic Community Services of York Region, COSTI, Job Skills, Ministry of Training, Colleges and Universities, Seneca College, Toronto.
DAMAGE ASSESSMENT AND NEEDS ANALYSIS
City Council October 21, 2013 Strategic Planning Retreat Next Steps.
BIODIVERSITY CONSERVATION, AND ADAPTATION ASPECTS IN NATIONAL STRATEGIES ON POVERTY REDUCTION (NS- PR), SOCIO-ECONOMIC DEVELOPMENT PLAN (SEDP)
Northern Sunrise County Overview August 25, 2015.
National financing tools for local environmental infrastructure Emil Savov Deputy Executive Director National Association of Municipalities in Bulgaria.
Santa Monica Sustainable City Plan Purpose The Sustainable City Plan was created to enhance our resources, prevent harm to the natural environment and.
Texas Emergency Management Conference San Antonio April 3, 2012.
California Emergency Management Agency State Emergency Plan Briefing Emergency Partnership Advisory Workgroup Meeting April 16, 2009.
BROKENHEAD COMMUNITY SUSTAINABLE HOUSING INITIATIVE OCT. 6,
State of Ohio Disaster Housing Strategy
UNCLASSIFIED As of W Mar 08 Mr. Scott A. Weidie, J722 1 Multinational Planning Augmentation Team (MPAT) 04 March 2008 Governments and Crises: Roles.
Michigan Minority Contractors Association October 2, 2015.
Follow up PDNA actions Chisinau, September 30, State Chancellery Government of Moldova.
Welfare Reform Kerry Maynard December What this session will cover A recap of the main changes in welfare reform from April 2013 Where we are now.
1. FY Proposed Budget Jamie Justice, Town Manager & Piet Swart, Finance Director April 26, 2016 Fiscal Year Proposed Budget 2.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
The NH Climate Action Plan and the need for Adaptation Sherry Godlewski NH Department of Environmental Services
CHILDREN OF PRISONERS PARTNERSHIP What is the Children of Prisoners (CP) Partnership? The CP Partnership is a funding project between PFI and selected.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
LAND USE AND REVENUE FY 2013 – 2014 REVENUES ANALYSIS.
Leveraging Funding and Outcomes through Partnerships Domenica McClintock, Cuyahoga County Board of Health Jan Bayne, Cuyahoga County Department of Development.
Sendai Framework for Disaster Risk Reduction
Disaster Recovery.
District Disaster Risk Reduction Managment Plan
Unit 1: Introduction to Recovery Concepts
(Your Name) (Your Organization).
Presentation transcript:

AEMA Summit 2011 Lesser Slave Lake Regional Wildfire Response and Recovery Brandy Cox Director, Slave Lake Recovery Alberta Municipal Affairs Mark Hoosein Business Continuity/ Consequence Management Officer Alberta Infrastructure

Introduction Impacts of the Wildfire Government Support of the Recovery Long Term Recovery Governance and Oversight of the Response and Recovery Process

Impacts of the Wildfire

Wildfire Impacts Approximately 14,300 residents of the Town of Slave Lake, Municipal District of Lesser Slave River No. 124, Sawridge First Nation and surrounding communities were evacuated for over two weeks. 372 homes and 6 apartment blocks were destroyed. 732 households were displaced. –260 households were non-insured (mostly in rental accommodations) Insurance estimates are $700 million in claims.

Wildfire Impacts Evacuation Centers: –Thousands of Slave Lake residents fled their fire ravaged town, to temporary evacuation centers in Athabasca, Westlock, Boyle and Edmonton.

Recovery Zone

Government Support of the Recovery

Slave Lake Recovery Treasury Board approved a total of $289 million to support response and recovery efforts in the Lesser Slave Region. Key programs form the Government of Albertas response to this unprecedented disaster: –$125.3 million Disaster Recovery Program; –$56.7 million Community Stabilization Funding; –$42.8 million Interim Housing Project; –$64.2 million Lesser Slave Lake Regional Recovery Plan; and –funds already committed to Slave Lake through regular GoA business processes.

Lesser Slave Lake Regional Recovery - Total Funding

Disaster Recovery Program $125.3 million Includes 17 projects that are directly related to the short term response and recovery efforts following the fire. A portion of the funds spent through the Disaster Recovery Program are eligible to be reimbursed through the Federal Disaster Financial Assistance Arrangements.

Community Stabilization $56.7 million These funds were primarily expensed the short term provincial government programs and projects which were not eligible under the Disaster Recovery Program. Examples include the EI assistance debit cards which were distributed to evacuees and the subsidization of Agriculture Financial Services Corporation business loans.

Interim Housing Project The Interim Housing Project is a major piece of the GOA-led recovery effort. Alberta Infrastructure and the former ministry of Housing and Urban Affairs collaborated to develop and service two sites: Lot 78 and Lot 88, now known as Sunset Place and Phoenix Heights. One other site was held in reserve if needed (ball diamonds site, now know as Fournier Place)

Interim Housing Project Original target to provide 350 interim housing units. Today, the required amount of housing units stands at 189 to house 269 households. The project is a partnership between the Town of Slave Lake, the Municipal District of Lesser Slave River and the Government of Alberta to provide interim housing units to displaced residents. Municipal Affairs is procuring the units and in collaboration with the Town and MD, will determine the priority for interim homes to be allocated. –Rents are set at average pre-fire rates for Slave Lake Infrastructure has project managed the preparation of the sites for the units and completed the installation of utility hook-ups and skirting for the units.

Interim Housing Numbers Update 269 households require interim housing 189 manufactured housing units are required, including 28 duplex units to accommodate 29 singles in shared accommodation 222 units are installed –166 are occupied –56 are in the process for utility hook-up or resident walk through 11 units are scheduled for delivery in the coming week

Project Requirements The project plan included the following expected work: –Offsite work including engineering drawings, unit procurement and construction plans. –Site Grading and Services include: clearing, grubbing, backfill and land servicing. –Unit installation, utility hook-up including: power, sewer, skirting, stairs and phone and television accessibility. –Maintenance of all units and site for two years.

Interim Housing Project vs. Normal Timelines TasksNormal TimelinesInterim Housing Project Timeline Engineering Plans6-8 months15 days Site Grading and Services3-4 months35 days Unit Delivery and Utility Hookup20-25 days per phase10 days per phase Stairs and Skirting10-15 days per phase5 days per phase

Town of Slave Lake Lot Development Locations Lot 78 Lot 88 Ball Diamonds

Lot 78 Occupancy Contractor Access Resident Access Phase 2 – 33 Units Phase 1 – 22 Units Phase 3 – 17 Units Phase 4 – 27 Units 102 lots have been developed 74 units placed

Lot 88 Planned Occupancy Phase 1 – 30 Units Phase 2 – 30 Units Phase 3 – 20 Units Phase 4 – Not used Phase 5 – Not used Emergency/Contractor Access Resident Access 90 lots have been developed 86 units placed

Ball Diamonds This land was originally the best alternative to providing an interim housing solution. As the project has advanced, lots 78 and 88 provided a faster solution. Development to be completed and this site will be used a contingency plan in case more space is required.

Interim Housing Allocation Procedure Interim Housing units will be allocated in the following priority: 1.Medical Health services, RCMP, Fire services, Utility services, Municipal services and some Provincial services, K-12 Education Staff 2.Families with School age children 3.Families with Pre-school age children 4.Couples & Singles, Self established groups of singles Mobile homes will be allocated using a computer generated random selection process for the above groups.

Project Scope Rents will be charged for these units: Two Bedroom Interim Housing Units: $1, per month Three Bedroom Interim Housing Units: $1, per month Four Bedroom Interim Housing Units: $1, per month Housing manage the rental of the units in accordance with the Landlord Tenancy Act.

Town Considerations Fire Protection Highway Safety Pedestrian Crossing Garbage Collection Postal Service Green Space/Parks

Regional Wildfire Recovery Plan Objective: To return the region to its pre- disaster state while ensuring that communities are not socially, environmentally, and economically disadvantaged by the wildfire event and are well positioned for future growth. Vision: Slave Lake is the jewel of Alberta, where you come for a job and stay for the lifestyle

Regional Wildfire Recovery Plan The Regional Wildfire Recovery Plan will: –Fund 17 projects for a total of $64.2 Million –Establish a framework for long term recovery of the community

Regional Recovery Plan Guiding Principles Regional focus Resident focus Sustainability Service Hub Timeliness Fairness Preserve culture Preserve vision Resiliency Model

Regional Recovery Plan Stakeholders Individuals and families Local governments Businesses Non-government organizations Red Cross Government of Alberta Federal government

Regional Recovery Plan Recovery Planning Framework

PEOPLE The highest priority is the overall physical, mental and social well-being of the residents of the Lesser Slave Lake region. People focuses on these aspects and ensures that the right resources are in place to support the communitys needs. –Safety –Health –Social well-being Regional Recovery Plan Recovery Planning Framework (continued)

ENVIRONMENT The Lesser Slave Lake region wildfires had significant impacts on the environment as a result of forest and urban destruction and from response activities such as firebreaks or the use of fire suppressants/retardants. –Biodiversity, ecosystems and natural resources –Amenities –Waste and pollution management Regional Recovery Plan Recovery Planning Framework (continued)

RECONSTRUCTION The disaster affected approximately one-quarter of the Town of Slave Lake and a large number of properties in the Municipal District of Lesser Slave River No Damaged infrastructure included residential, commercial and public buildings as well as utilities. Prioritizing the needs of the community on a social and economic basis has to be taken into account for the re- establishment of a viable, attractive and sustainable community. –Residential, commercial and public buildings –Utilities Regional Recovery Plan Recovery Planning Framework (continued)

ECONOMY The economic recovery of the region will help to ensure that people, business and industry, infrastructure and government in the region are able to return to normal. The plan will support the return of economic health in the region, and will help to enhance the economy and offset economic disadvantages experienced as a direct result of the disaster. –Individuals –Business –Infrastructure, communications and transport planning –Government Regional Recovery Plan Recovery Planning Framework (continued)

Indicators of Successful Recovery IndicatorTarget PEOPLE Population Overall population in 2015 is consistent with the 2010 census data plus a growth based on historical and current local and provincial population rate information ENVIRONMENT Environmental Parameters Soil, air, water and biodiversity monitoring show that there have been no long-term adverse impacts to the region due to the wildfire. RECONSTRUCTION Rebuild All destroyed or damaged structures have been rebuilt and growth rate for the community has been re-established. ECONOMY Employment RateRegional employment in 2015 is consistent with local historical reference and to provincial rates

Regional Recovery Plan – Approved Projects People $0.59 million Replacement of Firefighting Resources $2 million Comprehensive Assessment of Health Services $0.05 million Commemorative Monument $1.5 million Municipal Support $3.6 million Evacuation Centre $2 million Intersection Upgrade (Hwy 88 - Hwy 2) Reconstruction $0.30 million Performance Monitoring $1.5 million Widewater Firehall $0.25 million Off-Site Levies and Permitting Re-Imbursement $20 million FireSmart Initiatives $1.0 million Ball Diamond

Regional Recovery Plan – Approved Projects continued… Economy $6 million Tax Relief and Revenue Stabilization $0.9 million Economic Development Support $20 million Increased Water Supply $2.5 million Mitsue Fire Station Construction $1.0 million Regional Green Transit Environment $1.0 million Berm

Governance and Oversight of the Response and Recovery Process

Recovery Governance Model

Tri-Council The Tri-Council –Town of Slave Lake –Municipal District of Lesser Slave River No. 124 –Sawridge First Nation The municipalities and the First Nation have formed a closer working relationship in order to effectively address the impacts of the wildfires. The Tri-Council meets regularly to oversee the recovery process.

Slave Lake Recovery Task Force The Task Force provides provincial oversight and coordination of recovery efforts. Ministries: –Municipal Affairs –Infrastructure –Finance –Health and Wellness –Treasury Board and Enterprise –Others as required Four Key Themes –Financial Support –Housing (interim and permanent) –Recovery Plan –Donations –International, Intergovernmental and Aboriginal Relations –Human Services –Executive Council –Public Affairs Bureau

Regional Recovery Coordination Group (RRCG) The RRCG was formed to maintain continuity and coordination of the recovery efforts in the years after the wildfires. The formation and operation of the RRCG is funded as a project under the Regional Recovery Plan. RRCG staff are employed or contracted by the provincial government to work with the Tri-Council and stakeholders in the impacted communities.

Long Term Recovery The stress of the wildfire disaster and response has had an impact on the physical, social and economic health of people in the region. These impacts are often difficult to identify and analyze, much less measure quantitatively. A number of responses are underway to ensure that the supports are in place to address the physical, social and economic issues people face.

Implementation The Minister of Municipal Affairs Doug Griffiths visits Slave Lake.

Community Wellness Team The Town of Slave Lake has formed a Community Wellness Team to bring together social service providers, municipal staff and the Regional Recovery Coordination Group. This Team meets monthly to identify and assess emerging social needs in the community.

Alberta Supports A pilot single intake process centre for community support needs was planned for the Town of Slave Lake prior to the wildfire. The pilot process assigned a single caseworker to each client for a variety of support needs. This integrated Alberta Supports centre is operational although currently all support services are not located at a single location. This Alberta Supports centre is a key site to obtain and assess information on the needs of residents.

Social Supports Working Group The Slave Lake Recovery Task Force initiated the Social Supports Working Group to focus on the emerging social needs which were instigated or negatively impacted by the wildfire disaster. Representatives of social services ministries as well as some agencies and the Red Cross meet regularly to discuss issues and determine avenues for action.

Canadian Red Cross The Red Cross appeal for the victims of the Alberta wildfires reports donations of $3.7 million, and continues receive donations for this appeal. Red Cross remains on the scene to help address longer-term needs, such as the rebuilding of lives and communities and reducing vulnerability to future disasters.

Canadian Red Cross continued… In northern Alberta, approximately $1 million has been spent. Expenditures include delivery of the stress reduction workshop, aboriginal outreach programs, and violence and abuse prevention programs. Direct aid spending includes: –$181,000 for household goods; –$187,000 for food; –$101,000 in clothing; –$25,000 to help with occupational needs such as tools, work boots, coveralls; and –$32,000 in emergency lodging.

Next Steps Project funding for the Recovery Plan will be available for release to the municipalities shortly. The municipalities will develop the scope, milestones and budget for each project, in collaboration with stakeholders. It is expected that projects will be completed over the course of the next three years. The Government of Alberta will continue to monitor the recovery process through the Regional Recovery Coordination Group, the Slave Lake Recovery Task Force and regular ministry programs.

Recognition Video

Questions?